Search results

Jump to navigation Jump to search
  • [[Category:Divison 2]]
    2 KB (224 words) - 15:57, 6 May 2021
  • [[Category:Divison 2]]
    2 KB (241 words) - 15:57, 6 May 2021
  • [[Category:Divison 2]]
    2 KB (321 words) - 15:55, 6 May 2021
  • When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) measured along [[Category:Divison 2]]
    2 KB (335 words) - 15:55, 6 May 2021
  • ...and fill the basement to ground level with earth containing not more than 2 percent fieldstone in excess of 6 inches (150 mm) in diameter. ...l, and complete filling the excavation with earth containing not more than 2 percent fieldstone in excess of 6 inches (150 mm) in diameter.
    8 KB (1,199 words) - 15:56, 6 May 2021
  • [[Category:Divison 2]]
    7 KB (1,065 words) - 15:57, 6 May 2021
  • ...the application to invoice MDOT. For training requirements see Section 1.2 in the [https://www.michigan.gov/documents/2006_SESC_Manual_165226_7.pdf MD [[File:NPDES NOT Chart 11-12-19.pdf|link=//{{SERVERNAME}}/images_construction/2/26/NPDES_NOT_Chart_11-12-19.pdf|File:NPDES_NOT_Chart_11-12-19.pdf|400px|thu
    17 KB (2,437 words) - 15:58, 6 May 2021
  • * Location of warning signs (to warn people and prohibit use of 2-way radios). ...e depth of excavation below plan grade varies from 3-1/2 to 4 feet (1 to 1.2 m) in the southern and central parts of the state and to 5 feet (1.5 m) in
    78 KB (12,210 words) - 15:56, 6 May 2021