Difference between revisions of "Chapter 1 - ProjectWise Pre-Bid Processes"

From MediaWiki
Jump to navigation Jump to search
 
(211 intermediate revisions by 4 users not shown)
Line 1: Line 1:
<span style="color: red"> -Reserved- </span>
+
{{Navbox PW}}
==[[#8.1 Base Plan Review ProjectWise Process|8.1 Base Plan Review ProjectWise Process]]==
+
{{Navbox DSR|Chapter 1 - ProjectWise Pre-Bid Processes|Chapter 2 - Data Requirements}}
The '''[//{{SERVERNAME}}/images_design/6/69/Base_Plan_Review_process_instructions.pdf Base_Plan_Review_process_instructions.pdf]''' has been temporarily posted while the information is converted to wiki format.
+
'''The Development Guide has moved to a Sharepoint site.'''  
 +
[https://stateofmichigan.sharepoint.com/sites/MDOT-SPC-DevelopmentGuide/ New Development Guide]
  
===[[#8.1.1 Package Submittal|8.1.1 Package Submittal]]===
+
If you haven't visited the new site yet, click the link, then click Request Access. You will be added to the Sharepoint Visitors group, and will receive an email with a link to the Development Guide. If you still have access issues, contact [http://mailto:Mdot-EngineeringSupportTraining@michigan.gov MDOT-EngineeringSupportTraining@michigan.gov]
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
  
====[[#State: Base Plan - Pending Submittal|State: Base Plan - Pending Submittal]]====
 
'''PPMS Task:'''  3360 - Prepare Base Plans
 
  
<span style="color: red"> -Reserved- </span>
+
[[CATEGORY:RID]]
{{top}}
 
 
 
====[[#State: Base Plan - Review|State: Base Plan - Review]]====
 
'''PPMS Task:'''  3360 - Prepare Base Plans
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
===[[#8.1.2 Review|8.1.2 Review]]===
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: Base Plan Review - Pending|State: Base Plan Review - Pending]]====
 
'''PPMS Task:'''  3360 - Prepare Base Plans
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: Base Plan Review - Ready for Review|State: Base Plan Review - Ready for Review]]====
 
'''PPMS Task:'''  3380 – Review Base Plans (NOTE: 20 work days for review)
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: Base Plan Review - PM Review in Progress|State: Base Plan Review - PM Review in Progress]]====
 
'''PPMS Task:'''  3395 – Project Manager Base Plan Review (5 work days for review)
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: Base Plan Review - Design Team Response|State: Base Plan Review - Design Team Response]]====
 
'''PPMS Task:'''  Design Team (5 work days for review)
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
==[[#8.2 The Plan Review ProjectWise Process|8.2 Preliminary Plan Review ProjectWise Process]]==
 
The '''[//{{SERVERNAME}}/images_design/8/88/The_Plan_Review_process_instructions.pdf The_Plan_Review_process_instructions.pdf]''' has been temporarily posted while the information is converted to wiki format.
 
 
 
===[[#8.2.1 Package Submittal|8.2.1 Package Submittal]]===
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review - Pending Submittal|State: The Plan Review - Pending Submittal]]====
 
'''PPMS Task:'''  3580 – Develop Preliminary Plans
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review - Review|State: The Plan Review - Review]]====
 
'''PPMS Task:'''  3580 – Develop Preliminary Plans
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
===[[#8.2.2 Review|8.2.2 Review]]===
 
<span style="color: red"> -Reserved- </span>
 
 
 
====[[#State: The Plan Review - Pending|State: The Plan Review - Pending]]====
 
'''PPMS Task:'''  3580 – Develop Preliminary Plans
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review - Request for Meeting|State: The Plan Review - Request for Meeting]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review – Assigned to Reviewer|State: The Plan Review – Assigned to Reviewer]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review – Scheduling and Distribution|State: The Plan Review – Scheduling and Distribution]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review - Ready for Review|State: The Plan Review - Ready for Review]]====
 
'''PPMS Task:'''  3590 – Preliminary Plan Review (NOTE: 20 work days for review)
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review – PM Review in Progress|State: The Plan Review – PM Review in Progress]]====
 
'''PPMS Task:'''  3600 – Project Manager Preliminary Plan Review (5 work days for review)
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review – Ready for  Meeting|State: The Plan Review – Ready for  Meeting]]====
 
'''PPMS Task:'''  Design Team (5 work days for review)
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review – Draft Meeting Report Pending|State: The Plan Review – Draft Meeting Report Pending]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review – Final Report Distribution|State: The Plan Review – Final Report Distribution]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: The Plan Review – Final Meeting Report|State: The Plan Review – Final Meeting Report]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
===[[#8.2.3 RID Review|8.2.3 RID Review]]===
 
====[[#State: RID Review – Pending|State: RID Review – Pending]]====
 
'''PPMS Task:'''  3580 - Develop Preliminary Plans
 
 
 
{| class="wikitable"
 
|-
 
! Step
 
! Action
 
|-
 
|style="text-align:center;" | 1
 
| ''Design Team'' – Create RID Submittal during [[Chapter_8_-_ProjectWise_Pre-Bid_Processes#State:_The_Plan_Review_-_Pending_Submittal|The Plan Review – Pending Submittal]]:
 
* Place RID files in the ‘RID-Preliminary’ folder per [http://mdotwiki.state.mi.us/design/index.php/Chapter_5_-_RID_Process Chapter_5_-_RID_Process]
 
* Copy the latest version of the [//{{SERVERNAME}}/images_design/8/8c/RID_Review_Checklist.xlsm RID_Review_Checklist.xlsm] into the ‘- Supporting Documents’ folder.
 
* Complete the preliminary column of the [//{{SERVERNAME}}/images_design/8/8c/RID_Review_Checklist.xlsm RID_Review_Checklist.xlsm]. If files or categories that are identified with an “R” in the [//{{SERVERNAME}}/images_design/f/f6/Project_Data_Requirements_Table.pdf Project_Data_Requirements_Table.pdf] are not included please document the reason in the Preliminary Comments Column of the [//{{SERVERNAME}}/images_design/8/8c/RID_Review_Checklist.xlsm RID_Review_Checklist.xlsm].
 
|-
 
|style="text-align:center;" | 2
 
| ''Project Manager'' – Copy the [//{{SERVERNAME}}/images_design/8/8c/RID_Review_Checklist.xlsm RID_Review_Checklist.xlsm] file, located in ‘- Supporting Documents’ folder to ‘RID_Preliminary’ folder.
 
 
 
''NOTE: This is a “living” form. The Project Manager will update this form at each milestone.''
 
[[File:RID Prelim Checklist Folder.png|650px|thumbnail|center|RID Review Checklist in RID_Preliminary Folder]]
 
|-
 
|style="text-align:center;" | 3
 
| ''Project Manager'' – Make sure the RID files are ready for review prior to completing [http://mdotwiki.state.mi.us/design/index.php/Chapter_8_-_ProjectWise_Pre-Bid_Processes The Plan Review - Pending] State.
 
|-
 
|style="text-align:center;" | 4
 
| ''Project Manager'' – Once you ready to initiate the meeting appointment during [http://mdotwiki.state.mi.us/design/index.php/Chapter_8_-_ProjectWise_Pre-Bid_Processes The Plan Review – Scheduling and Distribution State]:
 
* Single Left click on the files in located in the ‘RID-Preliminary’ folder.
 
* Then right click and select Change State.
 
* Select Next.
 
|-
 
|style="text-align:center;" | 5
 
| ''Project Manager'' – Click on OK in the ‘Change Document to State’ window
 
|-
 
|style="text-align:center;" | 6
 
| ''Project Manager'' – Include [mailto:MDOT-RIDSupport@michigan.gov MDOT RID Support] on the email generated during the state change from [http://mdotwiki.state.mi.us/design/index.php/Chapter_8_-_ProjectWise_Pre-Bid_Processes The Plan Review – Scheduling and Distribution State].
 
|-
 
|} 
 
 
 
{{top}}
 
 
 
==[[#8.3 OEC Plan Review ProjectWise Process|8.3 OEC Plan Review ProjectWise Process]]==
 
The '''[//{{SERVERNAME}}/images_design/3/38/OEC_Plan_Review_process_instructions.pdf OEC Plan Review process instructions.pdf]''' has been temporarily posted while the information is converted to wiki format.
 
 
 
===[[#8.3.1 Package Submittal|8.3.1 Package Submittal]]===
 
<span style="color: red"> -Reserved- </span>
 
 
 
====[[#State: OEC Plan - Pending Submittal|State: OEC Plan - Pending Submittal]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: OEC Plan - Review|State: OEC Plan - Review]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
===[[#8.3.2 Review|8.3.2 Review]]===
 
<span style="color: red"> -Reserved- </span>
 
====[[#State: OEC Plan Review - Pending|State: OEC Plan Review - Pending]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: OEC Review – Ready for Region Approval|State: OEC Review – Ready for Region Approval]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: OEC Review – Region Approved for Meeting|State: OEC Review – Region Approved for Meeting]]====
 
'''PPMS Task:''' 
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: OEC Plan Review – Meeting Scheduled and Ready for Review|State: OEC Plan Review – Meeting Scheduled and Ready for Review]]====
 
'''PPMS Task:'''  3870 – OEC Plan Review (NOTE: 15 work days for review)
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: OEC Plan Review – PM Review in Progress|State: OEC Plan Review – PM Review in Progress]]====
 
'''PPMS Task:'''  3885 – Project Manager OEC Plan Review (5 work days for review)
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
====[[#State: OEC Plan Review - Design Team Response|State: OEC Plan Review - Design Team Response]]====
 
'''PPMS Task:'''  Design Team (5 work days for review)
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
===[[#8.3.3 RID Review|8.3.3 RID Review]]===
 
The [//{{SERVERNAME}}/images_design/f/f0/RID_Review_process_instructions.pdf RID_Review_process_instructions.pdf] has been temporarily posted while the information is converted to wiki format.  This file contains the RID Review process for each milestone.
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
==[[#8.4 Letting Plan Review ProjectWise Process|8.4 Letting Plan Review ProjectWise Process]]==
 
'''put temporary link to Letting Plan and Proposal Review process instructions.docx'''
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 
 
 
==[[#8.5 Design Exception ProjectWise Process|8.5 Design Exception ProjectWise Process]]==
 
'''put temporary link to Design Exception Review process instructions.docx'''
 
 
 
<span style="color: red"> -Reserved- </span>
 
{{top}}
 

Latest revision as of 11:43, 10 January 2024