Difference between revisions of "Chapter 2 - Data Requirements"

From MediaWiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
{{Navbox DSR|Chapter_1_-_ProjectWise_Pre-Bid_Processes|Chapter_3_-_Standard_Naming_Conventions}}
 
{{Navbox DSR|Chapter_1_-_ProjectWise_Pre-Bid_Processes|Chapter_3_-_Standard_Naming_Conventions}}
  
−
The Development Guide has moved to a Sharepoint site. [https://stateofmichigan.sharepoint.com/sites/MDOT-SPC-DevelopmentGuide New Development Guide]
+
The Development Guide has moved to a Sharepoint site.  
  
−
If you haven't visited the new site yet, click the link, then click Request Access. You will be added to the Sharepoint Visitors group, and will receive an email with a link to the Development Guide. If you still have access issues, contact [email protected]
+
If you haven't visited the new site yet contact [email protected] to request access to the Development Guide.
−
 
 
−
 
 
−
==[[#2.4 Guidelines for Plan Preparation|2.4 Guidelines for Plan Preparation]]==
 
−
{{move|Content Type=Section|New Location=[[Chapter 7 - Plan and Proposal Preparation]]}}
 
−
{{top}}
 
−
 
 
−
[[CATEGORY: RID]]
 

Latest revision as of 12:00, 24 January 2025