User contributions
Jump to navigation
Jump to search
- 10:32, 4 April 2019 diff hist +912 m Chapter 3 - Standard Naming Conventions Reverted edits by HightB (talk) to last revision by Lacrossd1
- 10:30, 4 April 2019 diff hist -9 Chapter 3 - Standard Naming Conventions →MDOT_02 Model Files:: Clarification of DGN files - correction of labeling of 2D vs 3D by changing to DGN
- 10:08, 28 March 2019 diff hist -8 Chapter 5 - RID Process →RID Index: Updated RID Index Location picture
- 09:57, 28 March 2019 diff hist -5 Chapter 5 - RID Process →FPC: OEC to FPC transition - updated illustration
- 09:53, 28 March 2019 diff hist 0 Chapter 5 - RID Process OEC to FPC transition and updated email addresses to reflect 2019 DTMB style guide
- 14:48, 27 March 2019 diff hist 0 Help:Contents →Support Resources
- 14:47, 27 March 2019 diff hist 0 Help:Contents →Support Resources: Updated email addresses to reflect 2019 DTMB style guidelines
- 10:33, 11 March 2019 diff hist -903 Chapter 3 - Standard Naming Conventions Updated language for linestring and XML deliverables to clarify the number of files required as we have progressed.
- 14:49, 1 March 2019 diff hist +36 Chapter 3 - Standard Naming Conventions →3.3 Sheet File and Non-File Naming Standards: Changed from CADD File to reduce ambiguity per discussion with Dave Geyer and Andrew Block - BH
- 10:35, 4 December 2018 diff hist 0 m Collaborative Milestone Review Process →Introduction to Bluebeam: minor typo and spelling cleanup
- 17:24, 29 November 2018 diff hist +240 1.2 The Plan Review ProjectWise Process →State: Preliminary RID Review - Pending: Edited to include Chapter 5 requirement for RID Index submittal.
- 17:15, 29 November 2018 diff hist +16 1.2 The Plan Review ProjectWise Process →State: Plan Review – Scheduling and Distribution: Updated Reminder to reflect location of RID Checklist and RID Index per Chapter 5 details
- 09:58, 31 May 2018 diff hist +25 m 1.4 Letting Plan Review ProjectWise Process →State: E-Proposal RID Pending: Updated link to point directly to Final stage of RID Review process
- 09:55, 31 May 2018 diff hist +9 m 1.3 FPC Plan Review ProjectWise Process →State: OEC RID Review - Pending: Updated link to point directly to OEC section for Chapter 5
- 09:51, 31 May 2018 diff hist +61 1.2 The Plan Review ProjectWise Process →State: Preliminary RID Review - Pending: Added link to Chapter 5 for necessary RID Submittal deliverables
- 09:26, 31 May 2018 diff hist +32 m Chapter 5 - RID Process →RID Index
- 16:49, 30 May 2018 diff hist +83 Chapter 6 - Quality Management of Electronic Data →6.1 Design Model Quality Control: Updated information on when and where the RID Review Checklist should be submitted
- 10:39, 30 May 2018 diff hist +17 m Chapter 5 - RID Process Cleanup of title and wording
- 13:31, 29 May 2018 diff hist -32 m Chapter 5 - RID Process →RID Changes: Fixed link to E-Proposal_RID_Publish
- 13:23, 29 May 2018 diff hist +120 Chapter 5 - RID Process →RID Review Checklist: Added link to RID Review Checklist
- 11:51, 29 May 2018 diff hist +180 Chapter 5 - RID Process 5.1.1 and 5.1.2 - Created separate screenshots for RID Review Checklist and RID_Index within Supporting Documents, renumbered Reference Attached Settings to 5.1.3
- 09:44, 29 May 2018 diff hist -5 m Chapter 5 - RID Process Standardization of formatting for references to RID Review.dgn
- 09:40, 29 May 2018 diff hist +5 m Chapter 5 - RID Process →Preliminary: Formatting cleanup and typo corrections.
- 16:04, 25 May 2018 diff hist -317 m Chapter 5 - RID Process Removed "Coming Soon" textbox template
- 16:01, 25 May 2018 diff hist +31 Main Page →Recent Major Changes to the Design Submittal Requirements: Updated Chapter 5
- 14:51, 25 May 2018 diff hist +24 m Chapter 5 - RID Process
- 14:36, 25 May 2018 diff hist -155 m Chapter 5 - RID Process →RID Additions: Removed link to E-Proposal wiki page
- 14:31, 25 May 2018 diff hist +280 Chapter 5 - RID Process 5.3 RID Additions and Changes
- 14:21, 25 May 2018 diff hist -777 Chapter 5 - RID Process Revised Section 5.2 RID Submittals
- 13:39, 25 May 2018 diff hist +1,750 Chapter 5 - RID Process Chapter 5: Added introductory section
- 11:15, 25 May 2018 diff hist +1,145 Chapter 5 - RID Process 5.1 Brought in Main Section from Dev Guide Version for further refinement.
- 11:04, 25 May 2018 diff hist +317 m Chapter 5 - RID Process
- 16:06, 27 March 2018 diff hist -520 Chapter 3 - Standard Naming Conventions Added description of SignCAD files
- 13:26, 27 March 2018 diff hist -1 m Chapter 3 - Standard Naming Conventions →Bridge Files:: Edited B_XXX to B-XXX as part of conformity with other standards.
- 13:10, 27 March 2018 diff hist -49 m Chapter 3 - Standard Naming Conventions →3.1 Prefixes:: Removed language listing Bridge design information as "upcoming"
- 15:30, 19 January 2018 diff hist +2,156 Main Page Addition of AG-approved Preamble
- 15:07, 19 January 2018 diff hist +2 m Main Page →Forward
- 11:57, 11 January 2018 diff hist +224 Help:Contents →Support Resources: Added Survey Research Request email
- 10:10, 11 January 2018 diff hist +278 Help:Contents →Support Resources: Added MDOT-Survey-Equipment-Support email link and description to list of Support Resources
- 17:07, 29 November 2017 diff hist +1,583 Chapter 3 - Standard Naming Conventions →3.2 RID: Added Naming Conventions for Bridge files based on input from Bureau of Bridges team
- 16:59, 21 November 2017 diff hist -159 Help:Contents →Support Resources: Removed obsolete link to MDOT-SupportServices email as it is no longer supported.
- 17:58, 17 November 2017 diff hist -1,467 Chapter 2 - Data Requirements →2.2.3 MDOT Bridge Design Software Requirements: deleted table of Software Requirements as it matches Road Requirements
- 09:57, 17 November 2017 diff hist -505 Chapter 4 - Developing Electronic Data →4.3 3D Modeling Recommendations: Bridge and 3D Modeling for Bridge Sections removed pending new guidance from BOB
- 12:40, 7 November 2017 diff hist +194 Chapter 3 - Standard Naming Conventions →Alignment Files:: New link for Workflow-Creating LandXML Files
- 12:37, 7 November 2017 diff hist +439 Chapter 3 - Standard Naming Conventions →MDOT_01 and MDOT_02 Model Output Files:: Revised LandXML and PrLineString file descriptions
- 11:55, 22 September 2017 diff hist -1 Chapter 3 - Standard Naming Conventions Undo revision 2174 by HightB (talk)
- 11:38, 22 September 2017 diff hist +1 Chapter 3 - Standard Naming Conventions →MDOT_01 and MDOT_02 Model Output Files:
- 11:37, 22 September 2017 diff hist +1 Chapter 3 - Standard Naming Conventions →MDOT_01 and MDOT_02 Model Output Files:
- 11:37, 14 September 2017 diff hist -270 Chapter 2 - Data Requirements →2.2.3 MDOT Bridge Design Software Requirements: Removed converting models .pdf guidance documents
- 11:28, 14 September 2017 diff hist -436 Chapter 3 - Standard Naming Conventions →Design Files:: Removed D-XXXXXX Bridge due to reorganization of Bridge naming conventions