Difference between revisions of "Chapter 1 - ProjectWise Pre-Bid Processes"

From MediaWiki
Jump to navigation Jump to search
m
 
Line 1: Line 1:
 
{{Navbox PW}}
 
{{Navbox PW}}
 
{{Navbox DSR|Chapter 1 - ProjectWise Pre-Bid Processes|Chapter 2 - Data Requirements}}
 
{{Navbox DSR|Chapter 1 - ProjectWise Pre-Bid Processes|Chapter 2 - Data Requirements}}
This chapter outlines the MDOT ProjectWise Workflows used for Milestone Submittals and other MDOT processes that have been incorporated into ProjectWise.  Please use the Navigation Box (Navbox) on the right to find the appropriate Milestone/Process (Heading) and the subsequent ProjectWise Workflow (Subheading). Once you are on the Milestone/Process page you can navigate to the specific Workflow State in the Contents at the top of page.
+
'''The Development Guide has moved to a Sharepoint site.'''
 +
[https://stateofmichigan.sharepoint.com/sites/MDOT-SPC-DevelopmentGuide/ New Development Guide]
 +
 
 +
If you haven't visited the new site yet, click the link, then click Request Access. You will be added to the Sharepoint Visitors group, and will receive an email with a link to the Development Guide. If you still have access issues, contact [http://mailto:Mdot-EngineeringSupportTraining@michigan.gov MDOT-EngineeringSupportTraining@michigan.gov]
  
  
 
[[CATEGORY:RID]]
 
[[CATEGORY:RID]]

Latest revision as of 11:43, 10 January 2024