Chapter 1 - ProjectWise Pre-Bid Processes

From MediaWiki
Revision as of 16:32, 8 October 2015 by Wilkersonj1 (talk | contribs)
Jump to navigation Jump to search

ProjectWise Pre-Bid Processes

8.4 Letting Plan Review ProjectWise Process

put temporary link to Letting Plan and Proposal Review process instructions.docx

-Reserved-

8.4.1 Letting - Package Submittal

-Reserved-

State: E-Proposal Pending

PPMS Task: -Reserved-

[top of page]


State: E-Proposal Complete

PPMS Task: -Reserved-

[top of page]


State: E-Prop Initiate Final Project Review

PPMS Task: -Reserved-

[top of page]


State: E-Prop Workflow Assign

PPMS Task: -Reserved-

[top of page]


8.4.2 Letting - Review

-Reserved-

State: QA Tech - Pending

PPMS Task: -Reserved-

[top of page]


State: QA Tech - Complete

PPMS Task: -Reserved-

[top of page]


State: QA Tech - Assign to Reviewer

PPMS Task: -Reserved-

[top of page]


State: QA SE - Pending

PPMS Task: -Reserved-

[top of page]


State: QA SE - Complete

PPMS Task: -Reserved-

[top of page]


State: QA SE - Assign to Estimator

PPMS Task: -Reserved-

[top of page]


State: QA Est - Pending

PPMS Task: -Reserved-

[top of page]


State: QA Est - Complete

PPMS Task: -Reserved-

[top of page]


State: QA Final - Pending

PPMS Task: -Reserved-

[top of page]


State: QA Final - Complete

PPMS Task: -Reserved-

[top of page]


State: QA Final - Ready for Finance

PPMS Task: -Reserved-

[top of page]


State: Finance PQ - Pending

PPMS Task: -Reserved-

[top of page]


State: Finance BLU - Pending

PPMS Task: -Reserved-

[top of page]


State: Final

PPMS Task: -Reserved-

[top of page]


8.4.3 Letting - RID Review

State: E-Proposal RID Pending

PPMS Task:

Step Action
1 Design Team – Create RID Submittal during the State: E-Proposal Complete:
2 Project Manager – Make sure the RID files are ready for review prior to completing the State: E-Prop Initiate Final Project Review.
3 Project Manager – Include MDOT RID Support on the email generated during the State: E-Prop Initiate Final Project Review.

[top of page]


State: E-Proposal RID Complete

PPMS Task:

Step Action
1 MDOT-RIDSupport Reviewers – Perform review of the RID files and document comments in the RID Review Checklist. Reference saved views in the RID Comments column.

NOTE: During this state the ‘RID’ folder will remain accessible for easy corrections of RID files during the MDOT-RIDSupport review.

2 MDOT-RIDSupport Reviewers – Prior to the State: QA Final – Ready for Finance:
  • Single Left click on the files in located in the ‘RID’ folder.
  • Then right click and select Change State.
  • Select Next.
3 MDOT-RIDSupport Reviewers – Click on OK in the ‘Change Document to State’ window.

[top of page]


State: E-Proposal RID Publish

PPMS Task:

Step Action
1 Finance – During the Final State:
  • Single Left click on the files in located in the ‘RID’ folder.
  • Then right click and select Change State.
  • Select Next.

Note: The RID must be in the State: E-Proposal Complete before they can be changed to the State: E-Proposal RID Publish. If the RID is not in the State: E-Proposal Complete at the time of Publishing please contact MDOT RID Support

2 If RID files are added after advertisement:
  • Project Manager - Email MDOT RID Support and include 'Added RID', 'RID File Name Change', or 'Post Award RID' in the Subject Line. Please also include a link to the Added RID. See RID_Changes for more information.
  • MDOT RID Support - Confirm that added RID is in conformance with Standards, and then Change State twice to Publish.

[top of page]


8.5 Design Exception ProjectWise Process

put temporary link to Design Exception Review process instructions.docx

-Reserved-

[top of page]