Difference between revisions of "Chapter 6 - Quality Management of Electronic Data"

From MediaWiki
Jump to navigation Jump to search
(→‎6.1 Design Model Quality Control: Updated information on when and where the RID Review Checklist should be submitted)
Line 2: Line 2:
  
 
==[[#6.1 Design Model Quality Control|6.1 Design Model Quality Control]]==
 
==[[#6.1 Design Model Quality Control|6.1 Design Model Quality Control]]==
The Designers and Project Managers are responsible for using the [http://mdotjboss.state.mi.us/SpecProv/getDocumentById.htm?docGuid=71536ffa-6a51-4e45-b38b-da310526378b&fileName=%22RID%20Review%20Checklist.xlsm%22 RID Review Checklist.xlsm] as a tool during the development of the design.  A copy of the [http://mdotjboss.state.mi.us/SpecProv/getDocumentById.htm?docGuid=71536ffa-6a51-4e45-b38b-da310526378b&fileName=%22RID%20Review%20Checklist.xlsm%22 RID Review Checklist.xlsm] should be submitted by the Project Manager into the respective RID folder at the milestones identified in [[Chapter_4_-_Developing_3D_Models#4.1_Milestone_Submittals|Section 4.1]]. The Designers and Project Managers should also check for spikes, gaps, content, and constructability.
+
Designers and Project Managers are responsible for using the [http://mdotjboss.state.mi.us/SpecProv/getDocumentById.htm?docGuid=71536ffa-6a51-4e45-b38b-da310526378b&fileName=%22RID%20Review%20Checklist.xlsm%22 RID Review Checklist.xlsm] as a tool during the development of the design.  A copy of the [http://mdotjboss.state.mi.us/SpecProv/getDocumentById.htm?docGuid=71536ffa-6a51-4e45-b38b-da310526378b&fileName=%22RID%20Review%20Checklist.xlsm%22 RID Review Checklist.xlsm] should be submitted by the Project Manager into the <i>Supporting Documents>RID Preparation</i> folder in accordance with the RID Process outlined in [[Chapter_5_-_RID_Process#RID_Review_Checklist|Chapter 5]].   Designers and Project Managers should also check for spikes, gaps, content, and constructability, which will also be considered during the RID Review process.
 
{{top}}
 
{{top}}
  

Revision as of 16:49, 30 May 2018

6.1 Design Model Quality Control

Designers and Project Managers are responsible for using the RID Review Checklist.xlsm as a tool during the development of the design. A copy of the RID Review Checklist.xlsm should be submitted by the Project Manager into the Supporting Documents>RID Preparation folder in accordance with the RID Process outlined in Chapter 5. Designers and Project Managers should also check for spikes, gaps, content, and constructability, which will also be considered during the RID Review process.

[top of page]


6.2 Design Quality Assurance and Model Review

Each model will be checked for spikes, gaps, content, and constructability. A review checklist is available at the following link: RID Review Checklist.xlsm

[top of page]


6.3 Accuracy

-Reserved-

[top of page]


6.3.1 Design Tolerances

-Reserved-

[top of page]


6.3.2 Design Ride Quality

-Reserved-

[top of page]


6.3.3 Drafting Tolerances

-Reserved-