Difference between revisions of "Chapter 6 - Quality Management of Electronic Data"
Jump to navigation
Jump to search
Wilkersonj1 (talk | contribs) (Created page with "==6.1 Design Model Quality Control== The Designers and Project Managers are responsible for using the [http://hct591jbosds790:90/design/i...") |
Wilkersonj1 (talk | contribs) |
||
Line 1: | Line 1: | ||
==[[#6.1 Design Model Quality Control|6.1 Design Model Quality Control]]== | ==[[#6.1 Design Model Quality Control|6.1 Design Model Quality Control]]== | ||
− | The Designers and Project Managers are responsible for using the [http://hct591jbosds790:90/design/images/8/8c/RID_Review_Checklist.xlsm RID Review Checklist.xlsm] as a tool during the development of the design. A copy of the [http://hct591jbosds790:90/design/images/8/8c/RID_Review_Checklist.xlsm RID Review Checklist.xlsm] should be submitted by the Project Manager into the respective RID folder at the milestones identified in [[ | + | The Designers and Project Managers are responsible for using the [http://hct591jbosds790:90/design/images/8/8c/RID_Review_Checklist.xlsm RID Review Checklist.xlsm] as a tool during the development of the design. A copy of the [http://hct591jbosds790:90/design/images/8/8c/RID_Review_Checklist.xlsm RID Review Checklist.xlsm] should be submitted by the Project Manager into the respective RID folder at the milestones identified in [[Chapter_4_-_Developing_3D_Models#4.1_Milestone_Submittals|Section 4.1]]. The Designers and Project Managers should also check for spikes, gaps, content, and constructability. |
{{top}} | {{top}} | ||
Revision as of 15:47, 17 September 2014
6.1 Design Model Quality Control
The Designers and Project Managers are responsible for using the RID Review Checklist.xlsm as a tool during the development of the design. A copy of the RID Review Checklist.xlsm should be submitted by the Project Manager into the respective RID folder at the milestones identified in Section 4.1. The Designers and Project Managers should also check for spikes, gaps, content, and constructability.
6.2 Design Quality Assurance and Model Review
Each model will be checked for spikes, gaps, content, and constructability. A review checklist is available at the following link: RID Review Checklist.xlsm
6.3 Accuracy
-Reserved-
6.3.1 Design Tolerances
-Reserved-
6.3.2 Design Ride Quality
-Reserved-
6.3.3 Drafting Tolerances
-Reserved-