Difference between revisions of "Chapter 6 - Quality Management of Electronic Data"

From MediaWiki
Jump to navigation Jump to search
(→‎6.1 Design Model Quality Control: Updated information on when and where the RID Review Checklist should be submitted)
(→‎6.1 Design Model Quality Control: Updated link to RID Review Checklist and Index)
Line 2: Line 2:
  
 
==[[#6.1 Design Model Quality Control|6.1 Design Model Quality Control]]==
 
==[[#6.1 Design Model Quality Control|6.1 Design Model Quality Control]]==
Designers and Project Managers are responsible for using the [http://mdotjboss.state.mi.us/SpecProv/getDocumentById.htm?docGuid=71536ffa-6a51-4e45-b38b-da310526378b&fileName=%22RID%20Review%20Checklist.xlsm%22 RID Review Checklist.xlsm] as a tool during the development of the design.  A copy of the [http://mdotjboss.state.mi.us/SpecProv/getDocumentById.htm?docGuid=71536ffa-6a51-4e45-b38b-da310526378b&fileName=%22RID%20Review%20Checklist.xlsm%22 RID Review Checklist.xlsm] should be submitted by the Project Manager into the <i>Supporting Documents>RID Preparation</i> folder in accordance with the RID Process outlined in [[Chapter_5_-_RID_Process#RID_Review_Checklist|Chapter 5]].  Designers and Project Managers should also check for spikes, gaps, content, and constructability, which will also be considered during the RID Review process.
+
Designers and Project Managers are responsible for using the [https://mdotjboss.state.mi.us/SpecProv/getDocumentById.htm?docGuid=71536ffa-6a51-4e45-b38b-da310526378b&fileName=%22 Joint RID Review Checklist and Index.xlsm] as a tool during the development of the design.  A copy of the [https://mdotjboss.state.mi.us/SpecProv/getDocumentById.htm?docGuid=71536ffa-6a51-4e45-b38b-da310526378b&fileName=%22 Joint RID Review Checklist and Index.xlsm] should be submitted by the Project Manager into the <i>Supporting Documents>RID Preparation</i> folder in accordance with the RID Process outlined in [[Chapter_5_-_RID_Process#RID_Review_Checklist|Chapter 5]].  Designers and Project Managers should also check for spikes, gaps, content, constructability, and conformity to the Plan Set submittal, which will also be considered during the RID Review process.
 
{{top}}
 
{{top}}
  

Revision as of 10:55, 1 April 2021

6.1 Design Model Quality Control

Designers and Project Managers are responsible for using the Joint RID Review Checklist and Index.xlsm as a tool during the development of the design. A copy of the Joint RID Review Checklist and Index.xlsm should be submitted by the Project Manager into the Supporting Documents>RID Preparation folder in accordance with the RID Process outlined in Chapter 5. Designers and Project Managers should also check for spikes, gaps, content, constructability, and conformity to the Plan Set submittal, which will also be considered during the RID Review process.

[top of page]


6.2 Design Quality Assurance and Model Review

Each model will be checked for spikes, gaps, content, and constructability. A review checklist is available at the following link: RID Review Checklist.xlsm

[top of page]


6.3 Accuracy

-Reserved-

[top of page]


6.3.1 Design Tolerances

-Reserved-

[top of page]


6.3.2 Design Ride Quality

-Reserved-

[top of page]


6.3.3 Drafting Tolerances

-Reserved-

[top of page]