Chapter 6 - Quality Management of Electronic Data
Revision as of 11:00, 11 October 2016 by Campbellw2 (talk | contribs) (→6.2 Design Quality Assurance and Model Review)
By Chapter
6.1 Design Model Quality Control
The Designers and Project Managers are responsible for using the RID Review Checklist.xlsm as a tool during the development of the design. A copy of the RID Review Checklist.xlsm should be submitted by the Project Manager into the respective RID folder at the milestones identified in Section 4.1. The Designers and Project Managers should also check for spikes, gaps, content, and constructability.
6.2 Design Quality Assurance and Model Review
Each model will be checked for spikes, gaps, content, and constructability. A review checklist is available at the following link: RID Review Checklist.xlsm
6.3 Accuracy
-Reserved-
6.3.1 Design Tolerances
-Reserved-
6.3.2 Design Ride Quality
-Reserved-
6.3.3 Drafting Tolerances
-Reserved-