Chapter 6 - Quality Management of Electronic Data

From MediaWiki
Revision as of 09:04, 17 October 2016 by Lacrossd1 (talk | contribs)
Jump to navigation Jump to search

6.1 Design Model Quality Control

The Designers and Project Managers are responsible for using the RID Review Checklist.xlsm as a tool during the development of the design. A copy of the RID Review Checklist.xlsm should be submitted by the Project Manager into the respective RID folder at the milestones identified in Section 4.1. The Designers and Project Managers should also check for spikes, gaps, content, and constructability.

[top of page]


6.2 Design Quality Assurance and Model Review

Each model will be checked for spikes, gaps, content, and constructability. A review checklist is available at the following link: RID Review Checklist.xlsm

[top of page]


6.3 Accuracy

-Reserved-

[top of page]


6.3.1 Design Tolerances

-Reserved-

[top of page]


6.3.2 Design Ride Quality

-Reserved-

[top of page]


6.3.3 Drafting Tolerances

-Reserved-

[top of page]