6.1 Design Model Quality Control

Designers and Project Managers are responsible for using the RID Review Checklist.xlsm as a tool during the development of the design. A copy of the RID Review Checklist.xlsm should be submitted by the Project Manager into the Supporting Documents>RID Preparation folder in accordance with the RID Process outlined in Chapter 5. Designers and Project Managers should also check for spikes, gaps, content, and constructability, which will also be considered during the RID Review process.

[top of page]


6.2 Design Quality Assurance and Model Review

Each model will be checked for spikes, gaps, content, and constructability. A review checklist is available at the following link: RID Review Checklist.xlsm

[top of page]


6.3 Accuracy

-Reserved-

[top of page]


6.3.1 Design Tolerances

-Reserved-

[top of page]


6.3.2 Design Ride Quality

-Reserved-

[top of page]


6.3.3 Drafting Tolerances

-Reserved-

[top of page]