Chapter 6 - Quality Management of Electronic Data
By Chapter
6.1 Design Model Quality Control
Designers and Project Managers are responsible for using the Joint RID Review Checklist and Index.xlsm as a tool during the development of the design. A copy of the Joint RID Review Checklist and Index.xlsm should be submitted by the Project Manager into the Supporting Documents>RID Preparation folder in accordance with the RID Process outlined in Chapter 5. Designers and Project Managers should also check for spikes, gaps, content, constructability, and conformity to the Plan Set submittal, which will also be considered during the RID Review process.
6.2 Design Quality Assurance and Model Review
Each model will be checked for spikes, gaps, content, and constructability. A review checklist is available at the following link: Joint RID Review Checklist and Index.xlsm
6.3 Accuracy
-Reserved-
6.3.1 Design Tolerances
-Reserved-
6.3.2 Design Ride Quality
-Reserved-
6.3.3 Drafting Tolerances
-Reserved-