Content Management Resources
For Long Chapters Use this navbox
By Chapter
Recent Major Changes
The table below is a list of Major changes.
Chapter | Summary |
---|---|
All New Content | |
All New Content | |
All New Content | |
All New Content | |
All New Content | |
All New Content | |
All New Content | |
All New Content |
Sample Content Format
Page Image code: [[File:Image.jpg|500px|left('\r\n!', next)]] OR [[File:Example.jpg|thumb|none|220px|Caption 1]]
- Page Title
If auto-numbering use:
<div style="display:none">__NUMBEREDHEADINGS__</div>
<div class="yesautonum">__TOC__</div>
Heading
Content Left Justify Images using code: [[File:imagename.jpg|none|500px|]] unless wrapping text.
Left or Center Justify Tables depending on text wrapping.
Left Justify Figures.
Bullets use:
Indent use:
: Single indent
:: Double indent
::::: Multiple indent
Numbering follows the Manual otherwise use auto numbering:
# Start each line
# with a [[Wikipedia:Number_sign|number sign]] (#).
## More number signs give deeper
### and deeper
### levels.
Links:
or
Chapter_1_-_Creating_the_DOT_Matrix_Set
Setting up Links to ProjectWise
From the go-between page select the tab for a resource and locate the file you want to link to. Copy and paste the address into the wiki.
http://mdotcfdev.state.mi.us/dev_public/specprov/devguidancedocs.cfm?syFR=936999#1122d883-f3df-49db-9e17-80be5893eaf5
Then delete the # and replace it with the &id=.
http://mdotcfdev.state.mi.us/dev_public/specprov/devguidancedocs.cfm?syFR=936999&id=cec8c017-94ac-4556-8dda-b3a42c360636
Add the name of the link to shorten it up.
Test it by clicking the link. It should have opened the file.
Contacts
Fist and Last Name at (000)000-0000 or @michigan.gov
Tables
Step | Action |
---|---|
1 | Design Team – Create RID Submittal during The Plan Review – Pending Submittal State: |
* Place RID files in the ‘RID-Preliminary’ folder per Chapter_5_-_RID_Process | |
· Copy the latest version of the RID_Review_Checklist.xlsm into the ‘- Supporting Documents’ folder. | |
· Complete the preliminary column of the RID_Review_Checklist.xlsm. If files or categories that are identified with an “R†in the Project_Data_Requirements_Table.pdf are not included please document the reason in the Preliminary Comments Column of the RID_Review_Checklist.xlsm. | |
2 | Project Manager – Copy the RID_Review_Checklist.xlsm file, located in ‘- Supporting Documents’ folder to ‘RID_Preliminary’ folder. |
NOTE: This is a “living†form. The Project Manager will update this form at each milestone. | |
3 | Project Manager – Make sure the RID files are ready for review prior to completing The Plan Review - Pending State. |
4 | Project Manager – Once you ready to initiate the meeting appointment during The Plan Review – Scheduling and Distribution State: |
· Single Left click on the files in located in the ‘RID-Preliminary’ folder. | |
· Then right click and select Change State. | |
· Select Next. | |
5 | Project Manager – Click on OK in the ‘Change Document to State’ window |
6 | Project Manager – Include MDOT-RIDSupport@michigan.gov on the email generated during the state change from The Plan Review – Scheduling and Distribution to The Plan Review-Ready for Review. |