Search results

Jump to navigation Jump to search
  • ==[[#10.1 Portfolio Requirements|10.1 Portfolio Requirements]]== ...ng convention and file format. Also covered in this chapter is the Survey Submittal Process.
    21 KB (3,108 words) - 10:05, 20 November 2024
  • This section of the manual sets forth the process and requirements for acquisitions of permanent Right-of-Way (R.O.W.) by MDOT, comprised of t *Accurate parcel locations relative to project coordinates for use in the design process
    18 KB (2,626 words) - 08:24, 13 October 2015
  • ...F project. These recommendations may be modified on a project basis at the design team's discretion. The bridge plans, proposal, and supporting document deli Different scales may be used at the design teams discretion.
    15 KB (2,303 words) - 12:03, 24 January 2025
  • ...There are specialty surveys which may not fall into these categories. The requirements for specialty surveys will be determined on a project-by-project basis and ...ngs, Eastings, and Elevations) in strategic locations that will govern any design survey work and construction survey work to follow. See [[Chapter_4_-_Surv
    88 KB (13,158 words) - 08:19, 23 January 2025