Search results
Jump to navigation
Jump to search
- {{Navbox DSR|Chapter 1 - ProjectWise Pre-Bid Processes|Chapter 2 - Data Requirements}} ==[[#1.1.1 Base Plan - Package Submittal|1.1.1 Base Plan - Package Submittal]]==10 KB (1,402 words) - 12:04, 16 April 2021
- {{Navbox DSR|Chapter 1 - ProjectWise Pre-Bid Processes|Chapter 2 - Data Requirements}} ==[[#1.3.1 Package Submittal|1.3.1 Package Submittal]]==18 KB (2,607 words) - 14:46, 20 April 2021
- {{Navbox DSR|Chapter 1 - ProjectWise Pre-Bid Processes|Chapter 2 - Data Requirements}} ==[[#1.4.1 Letting - Package Submittal|1.4.1 Letting - Package Submittal]]==14 KB (2,009 words) - 12:05, 28 July 2023
- {{Navbox DSR|Chapter 1 - ProjectWise Pre-Bid Processes|Chapter 2 - Data Requirements}} ==[[#1.2.1 Package Submittal|1.2.1 Package Submittal]]==23 KB (3,283 words) - 15:34, 16 April 2021
- ==[[#10.1 Portfolio Requirements|10.1 Portfolio Requirements]]== ...ng convention and file format. Also covered in this chapter is the Survey Submittal Process.21 KB (3,109 words) - 10:40, 4 March 2024
- This section of the manual sets forth the process and requirements for acquisitions of permanent Right-of-Way (R.O.W.) by MDOT, comprised of t *Accurate parcel locations relative to project coordinates for use in the design process18 KB (2,626 words) - 08:24, 13 October 2015
- ...F project. These recommendations may be modified on a project basis at the design team's discretion. The bridge plans, proposal, and supporting document deli Different scales may be used at the design teams discretion.15 KB (2,339 words) - 13:17, 24 April 2024
- ...There are specialty surveys which may not fall into these categories. The requirements for specialty surveys will be determined on a project-by-project basis and ...ngs, Eastings, and Elevations) in strategic locations that will govern any design survey work and construction survey work to follow. See [[Chapter_4_-_Surv88 KB (13,205 words) - 11:57, 8 May 2024