Search results

Jump to navigation Jump to search

Page title matches

  • ...e of Survey for a project, must be completed with the approval of the MDOT Survey Consultant Project Manager for the project or the MDOT Region Surveyor. An ...onflict exists between a specific scope and this document, contact an MDOT Survey Consultant Project Manager or MDOT Region Surveyor for clarification.
    2 KB (274 words) - 07:19, 9 May 2018
  • ...bles are prepared to represent existing site conditions at the time of the survey. See [[Chapter_10_-_Deliverables|Chapter 10]] for the deliverable requirem ...ness. An existing conditions model of the site will be produced from this survey data. The surveyor must certify the accuracy of the existing conditions mo
    26 KB (3,729 words) - 14:55, 4 December 2023

Page text matches

  • [[Chapter 1 - Survey Standards Introduction|Survey Standards of Practice]] [[Survey Training|Survey Training]]
    2 KB (233 words) - 08:31, 6 July 2016
  • ...e of Survey for a project, must be completed with the approval of the MDOT Survey Consultant Project Manager for the project or the MDOT Region Surveyor. An ...onflict exists between a specific scope and this document, contact an MDOT Survey Consultant Project Manager or MDOT Region Surveyor for clarification.
    2 KB (274 words) - 07:19, 9 May 2018
  • ...e of Survey for a project, must be completed with the approval of the MDOT Survey Consultant Project Manager for the project or the MDOT Region Surveyor. An ...onflict exists between a specific scope and this document, contact an MDOT Survey Consultant Project Manager or MDOT Region Surveyor for clarification.
    2 KB (274 words) - 13:17, 14 June 2016
  • The intent of this document is to provide standards and guidelines to promote consistent, uniform, and useable deliverables for :#Collection and development of geospatially located survey data for an accurate existing conditions model to be used for design, and a
    2 KB (338 words) - 15:03, 3 September 2014
  • ...ield operations must adhere to all applicable '''OSHA and MIOSHA''' safety standards, including the appropriate traffic signs for the activities and conditions ...re work commences or a price proposal is submitted. On projects for which survey activities are consulted out, MDOT does not reimburse additional traffic co
    3 KB (475 words) - 11:37, 16 April 2024
  • ...ments and calculations relating property monuments found or set during the survey and tied to the coordinate system of the project. ...s and other previous surveys within the project area must be tied into the survey coordinate system by measurements and their positions computed on the proje
    5 KB (781 words) - 10:33, 30 April 2021
  • ==[[#9.1 Static Laser Scanning Standards|9.1 Static Laser Scanning Standards]]== ...with the MDOT Survey Consultant Project Manager for the project or Region Survey Manager before work begins.
    26 KB (4,040 words) - 12:42, 30 May 2023
  • ...1995&fileName=%22S-117602_Survey_2D_2020-03-02.dgn%22 Training Reference - Survey 2D.dgn] ...sis. The workspace configuration has been customized to meet MDOT drainage standards.
    5 KB (714 words) - 08:22, 7 April 2023
  • ...bles are prepared to represent existing site conditions at the time of the survey. See [[Chapter_10_-_Deliverables|Chapter 10]] for the deliverable requirem ...ness. An existing conditions model of the site will be produced from this survey data. The surveyor must certify the accuracy of the existing conditions mo
    26 KB (3,729 words) - 14:55, 4 December 2023
  • *The following survey types are the most commonly performed by MDOT. There are specialty surveys ==[[#4.1 Control Survey|4.1 Control Survey]]==
    88 KB (13,201 words) - 17:48, 24 April 2024