Uploads by Greenes2
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
10:37, 2 July 2014 | Progress on the M-231 bridge over the Grand River in Ottawa County.jpg (file) | 64 KB | Progress on the M-231 bridge over the Grand River in Ottawa County | 1 | |
09:51, 2 July 2014 | ExCMpg3.png (file) | 53 KB | Example Contract Modification Page 3 | 1 | |
09:50, 2 July 2014 | ExCMpg2.png (file) | 68 KB | Example Contract Modification Page 2 | 1 | |
09:50, 2 July 2014 | ExCMpg1.png (file) | 55 KB | Example Contract Modification Page 1 | 1 | |
08:51, 25 June 2014 | Crews recently removed bridge beams from M-47 over US-10 near Midland.png (file) | 230 KB | Crews recently removed bridge beams from M-47 over US-10 near Midland | 1 | |
14:17, 17 June 2014 | Appendix B - Sample Contract Modification.pdf (file) | 229 KB | Sample Contract Modification | 1 | |
14:16, 17 June 2014 | Appendix A - Approval Path Flow Chart.pdf (file) | 90 KB | Approval Path Flow Chart | 1 | |
15:26, 30 May 2014 | DownTown Detroit Panorama.png (file) | 280 KB | Downtown Detorit Panorama at the Monument to Joe Louis | 1 | |
08:57, 29 May 2014 | I-96 Livonia.png (file) | 1.07 MB | Concrete Paving I-96 in Livonia | 1 | |
12:59, 12 May 2014 | Fig 708-11.png (file) | 226 KB | Figure 708-11 Crack comparator for measuring crack width | 1 | |
12:58, 12 May 2014 | Fig 708.10.png (file) | 400 KB | Figure 708.10 – Major deficiency – improper consolidation of concrete and expose prestressing strands and steel reinforcement | 1 | |
12:58, 12 May 2014 | Fig 708.9.png (file) | 318 KB | Figure 708.9 – Major deficiency – spalled bottom corner and exposed prestressing strands at the end of a box beam | 1 | |
12:57, 12 May 2014 | Fig 708.8.png (file) | 416 KB | Figure 708.8 – Minor damage – spalled bottom corner at the end of a box beam | 1 | |
12:57, 12 May 2014 | Fig 708.7.png (file) | 324 KB | Figure 708.7 – Minor damage – broken corner at end of PCI girder | 1 | |
12:56, 12 May 2014 | Fig 708.6.png (file) | 342 KB | Figure 708.6 – Minor surface defect – honeycombing of PCI girder | 1 | |
12:55, 12 May 2014 | Fig 708.5.png (file) | 350 KB | Figure 708.5 – Minor surface defect – rubber gasket crease | 1 | |
12:55, 12 May 2014 | Fig 708.4.png (file) | 325 KB | Figure 708.4 – Minor surface defect – air holes greater than 1” in any direction | 1 | |
12:54, 12 May 2014 | Fig 708.3.png (file) | 870 KB | Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart | 1 | |
12:54, 12 May 2014 | Fig 708.2.png (file) | 147 KB | Figure 708.2 | 1 | |
12:53, 12 May 2014 | Fig 708.2-1.png (file) | 255 KB | Figure 708.2-1 – Shop Drawing Review Process | 1 | |
12:52, 12 May 2014 | Fig 708.1-1.png (file) | 223 KB | Figure 708.1-1 – Shop Drawing Review Process | 1 | |
08:57, 9 May 2014 | Petosky US31.png (file) | 1.07 MB | Construction of US-31 in Petosky. | 1 | |
08:52, 9 May 2014 | Mackinac Bridge.png (file) | 926 KB | Construction began 60 years ago this month on the "Mighty Mac" | 1 | |
09:48, 2 May 2014 | Table707.6.png (file) | 4 KB | Table 707.6 - Minimum Preheat Temperatures | 1 | |
09:48, 2 May 2014 | Fig707.13.png (file) | 75 KB | Figure 707.13 Hotboxes for Electrode Storage | 1 | |
09:46, 2 May 2014 | Fig707.11.png (file) | 102 KB | Figure 707.11 Drying and Storage Oven | 1 | |
09:46, 2 May 2014 | Fig707.10.png (file) | 213 KB | Figure 707.10 Sample Approved Weld Procedure Specification (WPS) | 1 | |
09:45, 2 May 2014 | Table707.5.png (file) | 11 KB | Table 707.5 Welder Qualification Type and Position Limitations | 1 | |
09:44, 2 May 2014 | Fig707.9.png (file) | 96 KB | Figure 707.9 - Groove Weld (G) Position | 1 | |
09:40, 2 May 2014 | Fig707.8.png (file) | 10 KB | Figure 707.8 - Fillet Weld (F) Positions | 1 | |
15:06, 1 May 2014 | Fig707.6.png (file) | 141 KB | Figure 707.6 Typical Turn of Nut Marking System | 1 | |
15:05, 1 May 2014 | Table707.4.png (file) | 21 KB | Nut Rotation from Snug Tight Condition | 1 | |
14:50, 1 May 2014 | Table707.2.png (file) | 74 KB | Brief description of high strength bolts, nuts and washers used for structural applications. | 1 | |
14:38, 1 May 2014 | Fig707.5.png (file) | 261 KB | Figure 707.5 Offset Dimension for Rocker Tilt | 1 | |
13:30, 1 May 2014 | Fig707.3.png (file) | 260 KB | Figure 707.3 - Steel Fabrication Inspection Flowchart | 1 | |
13:29, 1 May 2014 | Fig707.2.png (file) | 147 KB | Figure 707.2 Approved For Use Stamp (MDOT) | 1 | |
13:27, 1 May 2014 | Fig707.1-2.png (file) | 255 KB | Figure 707.1-2 Shop Drawing Review Process | 1 | |
13:24, 1 May 2014 | Fig707.1-1.png (file) | 223 KB | Figure 707.1-1 – Shop Drawing Review Process | 1 | |
11:18, 1 May 2014 | Fig604-03.png (file) | 37 KB | Figure 604-3: Quality Assurance Mix Design Review | 1 | |
11:11, 1 May 2014 | Fig604-02.png (file) | 64 KB | MDOT Checklist For Concrete Paving With Warranty | 1 | |
12:22, 29 April 2014 | Table603-01.png (file) | 26 KB | Table 1: Modulus of Rupture Factors (F) | 1 | |
12:17, 29 April 2014 | EQ 603-02.png (file) | 2 KB | Simplified Center Point Flexural Strength Equation | 1 | |
12:15, 29 April 2014 | FIG603-01.png (file) | 10 KB | Beam Measurements | 1 | |
12:11, 29 April 2014 | EQ603-01.png (file) | 1 KB | Flexural Strength of Concrete (Using Simple Beam With Center Point Loading): | 1 | |
08:17, 29 April 2014 | %Ret Table Check 4-24-13.xls (file) | 132 KB | Percent Retained Table Check 04-24-13 | 1 | |
08:15, 29 April 2014 | Concrete JMF Yield Calculator.v3.4-17-13.xls (file) | 30 KB | Concrete JMF Yield Calculator v3 04-17-13 | 1 | |
08:21, 9 April 2014 | Fig717-01.png (file) | 154 KB | Drain Casting Assembly Details from Standard Plan Series B101 | 1 | |
08:20, 9 April 2014 | Fig711-07.png (file) | 110 KB | Bridge Barrier Railing, Aesthetic Parapet Tube | 1 | |
08:19, 9 April 2014 | Fig711-06.png (file) | 28 KB | Bridge Barrier Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Railing) | 1 | |
08:18, 9 April 2014 | Fig711-05.png (file) | 17 KB | Bridge Barrier Railing, Thrie Beam REtorfit (R4 Type Bridge Railing) | 1 |