Search results

Jump to navigation Jump to search
  • <center><span STYLE="font: 60pt arial;">'''305'''</span></center> ...generation of material. If additional material is required to obtain the section required, make sure that a well graded homogeneous material results.
    4 KB (552 words) - 16:44, 12 January 2022
  • ...he pavement surface, in one or more passes, to the required grade or cross section. ..., dried-out surfaces must be re-compacted and restored to the proper cross section. Saturated areas must be allowed to dry prior to placing mixture. The agg
    139 KB (21,114 words) - 15:08, 30 January 2024