Section 101
►
Section 101
101 - Terms, Format, and Conditions
▼
Section 102
►
Section 102
102.01 Prequalification of Bidders
102.02 Contents of Proposal - Progress Clause
102.03 Interpretation of Bid Items in the Proposal
102.04 Examination of Plans, Specifications, and Work Site
102.05 Preparation of Bid Items in the Proposal
102.06 Irregular Bids
102.07 Delivery of Bid
102.08 Withdrawal or Revision of Bid
102.09 Downloading of Bids
102.10 Bid Review
102.11 Bid Rejection
102.12 Bid Rejection Appeal
102.13 Consideration of Bids
102.14 Execution and Award of Contract
102.15 Requirements of Contract Bonds
102.16 Bid Guaranty Payment
102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)
102.18 - OJT Program
102.19 Evaluation of Contractor Performance and Contract Non-Compliance
Civil Rights Programs
Contract Administration and Oversight Guidelines for Projects Containing Warranty Work
▼
Section 103
►
Section 103
103.01 Intent of the Contract
103.02 Contract Revisions
103.03 Contractor Engineer Communication
Construction Contract Modification Process Overview
Extending Project Limits
Quality Initiatives and Adjustments
Work Order
▼
Section 104
►
Section 104
104.01 Authority of the Department
104.02 Plans and Working Drawings
104.03 Deviations from the Plans
104.04 Conformity with the Contrat
104.05 Removal of Unauthorized Work
104.06 Coordination of Drawing Dimensions and Contract Documentation
104.07 Contractor Obligations
104.08 Cooperation by the Contractor
104.09 Lines, Grades, and Elevations
104.10 Claim for Extra Compensation or Extension of Time
104.11 Work Zone Safety and Mobility
104.12 Approval for Use of the Right of Way
Construction Value Engineering Change Proposal (VECP)
Contractor's Equipment and Traffic Control
Digital Calculations for Payment
Dispute Review Board (DRB)
Processing Sewage/Storm Water Damage Claims
Weight Limit Waivers
▼
Section 105
►
Section 105
105.01 Quality and Scope of Supply
105.02 Natural Material Sources Found Within the Excavation Limits
105.03 Borrow Materials
105.04 Miscellameous Quantities
105.05 Approval of Materials Incorporated into the Work
105.06 Storage of Materials
105.07 Handling and Transporting Materials
105.08 Nonconforming Materials
105.09 Materials not Incorporated into the Work
105.10 Buy America Source of Steel and Iron
Materials Quality Assurance Procedures Manual
Process for Documenting Certified Materials in FieldManager
Structural Fabrication Quality Manual
▼
Section 106
►
Section 106
106 - Quality Assurance Acceptance Program
▼
Section 107
►
Section 107
107.01 Laws to be Observed
107.02 Permits and Licenses
107.03 Patented Process and Materials
107.04 Federal Aid Participation
107.05 Sanitary Provisions
107.06 Furnishing Right-of-Way
107.07 Protection and Restoration of Property
107.08 Land Monuments and Property Corners
107.09 Archeological and Historical Findings
107.10 Indemnification, Damage Liability, and Insurance
107.11 Contractor's Responsibility for the Work
107.12 Contractor's Responsibility for Utility Property and Services
107.13 Personal Liability of Public Officials
107.14 No Waiver of Legal Rights
107.15 Compliance with Laws; Environmental Protection
107.16 Forest Protection
107.17 Use of Explosives
107.18 Work over Navigable Waters
107.19 Hauling on Local Roads and Streets
107.20 Private Railroad Crossing for Haul Purposes
107.21 Open to Traffic
Prevailing Wage
▼
Section 108
►
Section 108
108.01 Subcontracting of Contract Work
108.02 Limitations of Operations
108.03 Competence of Workers
108.04 Adequacy of Methods and Equipment
108.05 Progress Schedule
108.06 Determination of Contract Time for Work Day Contracts
108.07 Extension of Time on Work Day Contracts
108.08 Extension of Time on Calendar Day Contracts
108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
108.10 Liquidated Damages
108.11 Default of Contract
108.12 Termination of Contract
Holiday Traffic Safety Provisions
Project Delays Due to a Utility Company
▼
Section 109
►
Section 109
109.01 Measurement of Quantities
109.02 Scope of Payment
109.03 Payments for Increased or Decreased Quantities
109.04 Progress and Partial Payments
109.05 Payment for Contract Revisions
109.06 Source of Supply and Carrier Rates on Materials
109.07 Final Inspection, Acceptance, and Final Payment
109.08 Prompt Payment
Force Account Work
▼
Section 150
►
Section 150
▼
Division 1 Supplemental
Certified Engineer Process
Certified Office Technician Process
Construction Field Services Indirect Testing Charges
Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects
Dispute Review Board (DRB)
E-Construction
E-Signature
FHWA CAP Action Plans
FieldManager
Final Project Review
Final Project Review Report
FPR Frequently Asked Questions
Frequently Searched Items
Hot Mix Asphalt Production Manual
Information Sharing About Construction Contractors and Consultants
Inspector’s Daily Work Report (DWR)
Interim File Review
Letter to File
Local Agency Program (LAP)
MDOT DENSITY TESTING AND INSPECTION MANUAL
Mobile Inspector
Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System
Pavement Historical Database
Plans, Proposal, Input, Review and Evaluation
Preconstruction Meeting
Prevailing Wage
Project Closeout Escalation of Accountability
Project with Consultant Oversight
Projects with Incentive Provisions
Railroad Highway Projects
Standard Naming Convention
Standard Rounding Convention Guidance
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
Main page
Table of Contents
Recent changes
Construction Manual Content Revision Procedures
Frequently Searched Items
AASHTOWare Project Construction & Materials Software Manual
Documentation Guide
Division 1
Division 1 Table of Contents
Division 1 Supplemental Information
Division 2 - Earthwork
Division 2 Table of Contents
201 - Clearing
202 - Removing Trees, Stumps, and Corduroy
203 - Removing Drainage Structures, Culverts, and Sewers
204 - Removing Miscellaneous Structures and Materials
205 - Roadway Earthwork
206 - Excavation and Backfill for Structures
207 - Obliterating Roadway
208 - Soil Erosion and Sedimentation Control (NPDES)
209 - Project Cleanup
Division 2 Supplemental Information
Division 3 - Base Courses
Division 3 Table of Contents
301 - Subbase
302 - Aggregate Base Courses
303 - Open Graded Drainage Course
304 - Rubbilizing Existing PCC Pavement
305 - HMA Base Crushing and Shaping
306 - Aggregate Surface Course
307 - Aggregate Shoulders and Approaches
308 - Geotextiles for Base
Division 3 Supplemental Information
Division 4 - Drainage Features
Division 4 Table of Contents
401 - Culverts
402 - Storm Sewers
403 - Drainage Structures
404 - Underdrain
405 - Pump Station Construction
406 - Precast Three-Sided, Arch, and Box Culverts
Division 4 Supplemental Information
Division 5 - HMA Pavements and Surface Treatments
Division 5 Table of Contents
501 - Plant Produced Hot Mix Asphalt
502 - HMA Crack Treatment
503 - Paver Placed Surface Seal
504 - Micro-Surfacing
505 - Chip Seals
506 - Slurry Seal
Division 6 - PCC Pavement Mixtures
Division 6 Table of Contents
602 - Concrete Pavement Construction
603 - Concrete Pavement Restoration
Division 7 - Structures
Division 7 Table of Contents
700 - Closure of Unsafe Structures
701 - Portland Cement Concrete for Structures
702 - Mortar and Grout
703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
704 - Steel Sheet Piling and Cofferdams
705 - Foundation Piling
706 - Structural Concrete
707 - Structural Steel
708 - Prestressed Concrete
709 - Timber Structures
710 - Waterproofing and Protective Covers
711 - Bridge Railings
712 - Bridge Rehabilitation, Concrete
713 - Bridge Rehabilitation, Steel
714 - Temporary Structures and Approaches
715 - Cleaning and Coating Existing Structural Steel
716 - Shop Cleaning and Coating Structural Steel
717 - Downspouts and Drains
718 - Drilled Shafts
719 - Earth Retaining Structures
Division 7 Supplemental Information
Division 8 - Incidental Construction
Division 8 Table of Contents
801 - Concrete Driveways
802 - Concrete Curb, Gutter, and Dividers
803 - Concrete Sidewalk, Ramps, and Steps
804 - Concrete Barriers and Glare Screens
805 - Hot Mix Asphalt Curb
806 - Bicycle Paths
807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts
808 - Fencing
809 - Field Office
810 - Permanent Traffic Signs and Supports
811 - Permanent Pavement Markings
812 - Temporary Traffic Control for Construction Zone Operations
813 - Slope Protection
814 - Paved Ditches
815 - Landscaping
816 - Turf Establishment
817 - Landscape Mowing
818 - Dune Grass Planting
819 - Electrical and Lighting
820 - Traffic Signals
821 - Preservation of Land Monuments and Property Corners
822 - Ground or Cut Centerline and Shoulder Corrugations
823 - Water Mains
824 - Contractor Staking
825 - Sanitary Sewer Systems
826 – Intelligent Transportation Systems
Division 9 - Materials
900 - Materials
Division 10 - Concrete Mixtures
Division 10 Table of Contents
1001 - Concrete Production Equipment and Facilities
1002 - Contractor Quality Control for Concrete
1003 - Quality Assurance (Acceptance) for Concrete
1004 - Portland Cement Concrete Mixtures
1005 - Mortar and Grout Mixtures
1006 - Patching, Repair, & Overlay Mixtures
Tools