Difference between revisions of "110 Mobilization"

From MediaWiki
Jump to navigation Jump to search
(Created page with " <center><span STYLE="font: 60pt arial;">'''110'''</span></center> <center><span STYLE="font: 40pt arial;">'''Mobilization'''</span></center> ==GENERAL== <span style="col...")
 
Line 1: Line 1:
  
 +
<center><span STYLE="font: 60pt arial;">'''CONSTRUCTION MANUAL CONTENT TEMPLATE - WIKI CODE'''</span></center>
 +
<center><span STYLE="font: 60pt arial;">'''110'''</span></center>
 +
 +
<center><span STYLE="font: 40pt arial;">'''Mobilization'''</span></center>
 +
 +
 +
 +
 +
{{top}}
 +
 +
 +
==[[#GENERAL DESCRIPTION|'''GENERAL DESCRIPTION''']]==
 +
<span style="color: red"> -Reserved- </span>
 +
 +
{{top}}
 +
===Definitions and Terms===
 +
 +
===General Overview===
 +
 +
===Contractor Prequalification===
 +
 +
===Code of Federal Regulation (CFR) / FHWA Regulations=== 
 +
 +
 +
{{top}}
 +
 +
==[[#MATERIALS|'''MATERIALS''']]==
 +
 +
===Description of Materials Used===
 +
 +
===Pictures of Materials===
 +
 +
==[[#EQUIPMENT|'''EQUIPMENT''']]==
 +
 +
===Description of Equipment Used===
 +
 +
===Equipment Specifications===
 +
 +
===Pictures of Equipment===
 +
 +
 +
{{top}}
 +
 +
==[[#PRECONSTRUCTION|'''PRECONSTRUCTION''']]==
 +
 +
===Submittals and Shop Drawings===
 +
 +
 +
===Permits===
 +
 +
 +
===Qualified Products List (QPL)===
 +
 +
 +
===Plant Inspections===
 +
 +
 +
===Contractor Submitted Plans/Procedures===
 +
 +
 +
{{top}}
 +
 +
==[[#CONSTRUCTION|'''CONSTRUCTION''']]==
 +
 +
===Construction Requirements/Procedures/Installation Methods===
 +
 +
===Safety===
 +
 +
===Productivity information/charts===
 +
 +
===Items of Note===
 +
 +
 +
===Layout / Survey===
 +
 +
{{top}}
 +
 +
==[[#INSPECTION & TESTING|'''INSPECTION & TESTING''']]==
 +
 +
===Inspection Procedures===
 +
 +
===Special Attention Areas===
 +
 +
===QA/QC Tests===
 +
 +
===Lab Testing / Field Testing===
 +
 +
===Rejection/Remedial Actions===
 +
 +
 +
{{top}}
 +
 +
==[[#MEASUREMENT, DOCMENTATION & PAYMENT|'''MEASUREMENT, DOCMENTATION & PAYMENT''']]==
 +
 +
===Measurement===
 +
 +
===Documentation Requirements===
 +
 +
===Basis of Payment===
 +
 +
{{top}}
 +
 +
==[[#LOCAL AGENCY PROJECTS|'''LOCAL AGENCY PROJECTS''']]==
 +
 +
 +
{{top}}
 +
 +
==[[#RAIL PROJECTS|'''RAIL PROJECTS''']]==
 +
 +
 +
 +
{{top}}
 +
 +
[[Category:Construction Manual]]
 +
[[Category:Local Agency Projects]]
 +
[[Category:Rail Projects]]
 +
[[Category:New CM Format]]
 
<center><span STYLE="font: 60pt arial;">'''110'''</span></center>
 
<center><span STYLE="font: 60pt arial;">'''110'''</span></center>
  

Revision as of 11:53, 23 October 2024

CONSTRUCTION MANUAL CONTENT TEMPLATE - WIKI CODE
110
Mobilization



[top of page]



GENERAL DESCRIPTION

-Reserved-

[top of page]


Definitions and Terms

General Overview

Contractor Prequalification

Code of Federal Regulation (CFR) / FHWA Regulations

[top of page]


MATERIALS

Description of Materials Used

Pictures of Materials

EQUIPMENT

Description of Equipment Used

Equipment Specifications

Pictures of Equipment

[top of page]


PRECONSTRUCTION

Submittals and Shop Drawings

Permits

Qualified Products List (QPL)

Plant Inspections

Contractor Submitted Plans/Procedures

[top of page]


CONSTRUCTION

Construction Requirements/Procedures/Installation Methods

Safety

Productivity information/charts

Items of Note

Layout / Survey

[top of page]


INSPECTION & TESTING

Inspection Procedures

Special Attention Areas

QA/QC Tests

Lab Testing / Field Testing

Rejection/Remedial Actions

[top of page]


MEASUREMENT, DOCMENTATION & PAYMENT

Measurement

Documentation Requirements

Basis of Payment

[top of page]


LOCAL AGENCY PROJECTS

[top of page]


RAIL PROJECTS

[top of page]


110
Mobilization


GENERAL

-Reserved-

[top of page]


MATERIALS

-Reserved-

[top of page]


CONSTRUCTION

-Reserved-

[top of page]


MEASUREMENT AND PAYMENT

Mobilization Payment

The prime contractor is to be paid for Mobilization, Max ___ per Section 110, Table 110-1, of the Standard Specifications for Construction. The supporting documentation for this pay item is to be an DWR posted by the engineer (or their representative) and placed in the project file. The IDR is to be generated when the contract value earned reaches 5, 10, and 25 percent value of the original contract amount. The notation of contract value earned and a statement that payment is being made per Section 110 of the Standard Specifications for Construction are to be documented on the IDR.

It must be noted that mobilization is to be paid based on the contract amount and not on any subset of projects within the contract ID. As an example, when the original contract amount earned reaches 5 percent, all projects within the contract are to be paid at 50 percent of their mobilization values. This payment value should be checked against 50 percent of the as bid mobilization amount for verification of proper payment.