<center><span STYLE="font: 60pt arial;">'''708'''</span></center>
 
<center><span STYLE="font: 60pt arial;">'''708'''</span></center>
  
 
<center><span STYLE="font: 40pt arial;">'''Prestressed Concrete'''</span></center>
 
<center><span STYLE="font: 40pt arial;">'''Prestressed Concrete'''</span></center>
  
<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/708%20Prest%20Concrete%20Beams.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 708]</center>
 
  
<span style="color: red"> -This section currently undergoing substantial revision- </span>
 
  
==[[#GENERAL|GENERAL]]==
+
==[[#GENERAL DESCRIPTION|'''GENERAL DESCRIPTION''']]==
  
Structural precast concrete members are cast in forms at a facility certified by the Prestressed Concrete Institute (PCI) that is typically a location other than their final position in the structure. Precast concrete beams are also longitudinally prestressed (bonded pre-tensioned strands) and in the case of side-by-side box beams, are transversely prestressed (post-tensioned strands) as well.  Prestressing and post-tensioning of precast concrete elements allows for longer, more efficient spans than traditionally reinforced concrete members by introducing pre-compression into the concrete members. The pre-compression force is typically designed to be larger than the effect of applied loads on the element, and therefore, stresses are well controlled.
+
Structural prestressed concrete members (also known as elements) are cast in forms at a Fabricator certified by the Prestressed Concrete Institute (PCI). A Fabricator supplying prestressed concrete bridge beams for MDOT use must also be an approved Supplier per MDOT’s Supplier Qualification Standard (SQS). A list of approved prestressed concrete beam Suppliers for MDOT projects can be found on the [https://www.michigan.gov/mdot/programs/bridges-and-structures/structure-construction/structural-fabrication-unit Structural Fabrication Unit (SFU) Website]
  
Other structural elements that are prestressed include concrete spun poles and in some cases, Prefabricated Bridge Elements and Systems (PBES) other than beams, and sound wall posts and/or panels.  
+
Prestressing (pre-tensioning and post-tensioning) of precast concrete members allow for longer, more efficient spans than traditionally reinforced concrete members by introducing compressive forces into the concrete members. These compressive forces are achieved by using a high grade of steel or carbon fiber strands that are pre or post-tensioned to a predetermined load based on design requirements, temperature of steel and concrete, Contractor/Fabricator equipment, and other factors. Most prestressed concrete beams are longitudinally prestressed and some may also be transversely prestressed, such as side-by-side box beams that are post-tensioned.
  
Structural precast concrete elements that are not prestressed include, but may not be limited to, sound wall posts and panels, culverts, and some PBES.  Although structural precast concrete elements are typically fabricated off-site, they require on-site inspection to ensure successful forming, casting, transport, handling, and placement into their final position in the structure.
+
Structural members that are prestressed include, but not limited to:
 +
* Prestressed concrete beams
 +
* Spun Poles
 +
* Prefabricated Bridge Elements and Systems (PBES)
 +
* Sound Wall Panels and Posts
  
{{top}}
+
Structural members that are not prestressed include, but not limited to:
 +
* Culverts
 +
* PBES
 +
* Sound Wall Panels and Posts
  
===[[#Shop Drawing Submittal|Shop Drawing Submittal]]===
+
MDOT requires on-site quality assurance (QA) shop inspection for the fabrication of prestressed concrete members. This inspection program is managed by MDOT’s Structural Fabrication Unit (SFU).
  
Shop drawings with complete detailed dimensions are submitted to MDOT for review and approval.  Approved shop drawings are required prior to the start of fabrication, but MDOT does not check every dimension for accuracy.  The submission is reviewed to ensure it is complete and in general conformance with the contract plans.  The Contractor is solely responsible for the correctness of shop drawings.  Errors found during the review of the shop drawings will be pointed out by MDOT but undiscovered errors are the Contractor's responsibility.
+
The SFU is responsible for implementing the Departments QA program for fabricated materials required to be accepted based on “Fabrication Inspection” per the [https://www.michigan.gov/mdot/business/construction/materials-quality-assurance-procedures Materials Quality Assurance Procedures (MQAP) manual] or project special provision. The SFU also serves as the Departments structural fabrication expert and provides recommendation to design and construction staff regarding plan details, specifications, shop drawings, shop inspection, and field inspection.  
  
It is the responsibility of the MDOT Design Project Manager (PM) to ensure their project’s shop drawings are being reviewed by all applicable technical reviewers.  This process is outlined in [http://mdotcf.state.mi.us/public/design/files/englishbridgemanual/ebdm10.pdf Chapter 10 of the MDOT Bridge Design Manual].  Figure 708.1-1 and Figure 708.1-2 below summarize MDOT’s electronic shop drawing review process and provides a listing of shop drawings to be reviewed with annotations indicating which MDOT Review Areas need to be involved in their review.  Note that this shop drawing listing is general in nature and is applicable for most projects; however, exceptions may apply on a case by case basis and it is the responsibility of the PM to ensure the shop drawings are being reviewed by all applicable parties.
+
In general, MDOT utilizes consultants to provide fabrication inspection and project management; however, the Structural Fabrication Unit will randomly perform fabrication inspection and project management on select projects for various reasons. The consultant provides weekly updates for active fabrication projects to the SFU and other important information such as program changes, overall quality, communication with Fabricator, and key performance indicators (KPIs) are discussed.
  
 +
The SFU adheres to [https://www.michigan.gov/mdot/programs/bridges-and-structures/structure-construction/structural-fabrication-unit/structural-fabrication-quality-manual MDOT’s Structural Fabrication Quality Manual (SFQM)]. The purpose of the SFQM is to provide the SFU and their consultants with information on implementing MDOT’s QA program for fabricated materials required to be accepted based on “Fabrication Inspection”.
  
[[File:Fig 708.1-1.png|600px|thumbnail|center|Figure 708.1-1 – Shop Drawing Review Process]]
+
The SFQM can be found on the [https://www.michigan.gov/mdot/programs/bridges-and-structures/structure-construction/structural-fabrication-unit SFU Website.]
  
 +
{{top}}
  
[[File:Fig 708.2-1.png|600px|thumbnail|center|Figure 708.2-1 – Shop Drawing Review Process]]
+
==[[#MATERIALS|'''MATERIALS''']]==
  
Allow the fabricator or supplier to work directly with MDOT Technical Review Areas to expedite the review of the shop drawings.  Contact the Bridge Field Services [http://www.michigan.gov/mdot/0,4616,7-151-9623_26663_56139_56173-278981--,00.html Structural Fabrication Unit] with questions.
+
<span style="color: red"> -Reserved- </span>
  
The contractor/fabricator shall submit to the Engineer the shop drawings in electronic format according to [http://mdotcf.state.mi.us/public/specbook/files/2012/104%20Control%20of%20Work.pdf subsection 104.02] of the Standard Specifications for Construction.  The Bridge Design Engineer will coordinate review of the drawings and stamp “Approved.”  The approved drawings will be distributed according to the Bridge Design Manual. 
+
{{top}}
 +
 
 +
==[[#EQUIPMENT|'''EQUIPMENT''']]==
 +
 
 +
<span style="color: red"> -Reserved- </span>
  
 
{{top}}
 
{{top}}
  
===[[#Approved Shop Drawing Distribution|Approved Shop Drawing Distribution]]===
+
==[[#PRECONSTRUCTION|'''PRECONSTRUCTION''']]==
 +
 
 +
===Submittals and Shop Drawings===
 +
 
 +
The Shop Drawing Review Process document summarizes the process for reviewing shop drawings for permanent structural elements, temporary bridges, and other temporary works. It is important for MDOT to respond quickly to shop drawing submittals in order to keep the project moving forward.
  
Upon receipt of the approved shop drawings from the Bridge Design Engineer, the Engineer shall forward them to the Contractor.
+
[https://www.michigan.gov/mdot/-/media/Project/Websites/MDOT/Programs/Bridges-and-Structures/Structure-Construction/Structural-Fabrication-Unit/Shop-Drawing-Review-Process.pdf?rev=ebcd092327c4493295b254f8d3ea7a6c&hash=ACBDB51A5A9FF29CDAB435FF5B614C4D Shop Drawing Review Process can be found on the SFU website].  
  
Upon receipt of the shop fabrication and erection drawings at the project office, the inspector will check each sheet against MDOT’s general plans.  Particular attention should be directed to span lengths.
+
Shop detail drawings, commonly called shop drawings, are a type of working drawing that the Contractor (Supplier/Fabricator) develops prior to fabrication. The Contractor is responsible for providing drawings that accurately show the appropriate details, dimensions, material requirements, fabrication procedures, and other requirements necessary to fabricate and erect structural members in accordance with the contract drawings.
  
Upon completion of the work, the contractor shall furnish the Department one set of complete set of shop drawings on a medium approved by the Department.  
+
Note, some Contractor submittals may be labelled as a shop drawing in ProjectWise but don’t follow the shop detail drawing requirements listed above. These types of submittals are typically working drawings, construction submittals, manufacturing drawings, or product information sheets. These are not shop detail drawings and do not follow the Shop Drawing Review Process.  
  
{{top}}
+
The Contractor must submit for review all shop drawings and calculations (when applicable) not furnished by MDOT for all parts of the work as required by the contract in Portable Document Format (PDF) into ProjectWise. The Contractor is responsible for the correctness of the shop drawings and calculations (when applicable) and ensuring their design (when applicable) complies with any permit and design requirements.
  
===[[#PRESTRESSED CONCRETE ELEMENTS|PRESTRESSED CONCRETE ELEMENTS]]===
+
If revisions are necessary after the shop drawing set is approved, the Contractor is required to submit a complete shop drawing set (proposed new sheets, revised sheets, and remaining sheets that are already stamped approved) for review to ensure each submittal is a standalone set.
  
Prestressing, refers to the process of pulling steel tendons in the beam into tension before the concrete is placed in the forms. After the concrete has hardened, the stressed tendons are released and transmit a compressive stress to the concrete. This offsets tension forces on the concrete and increases the load-carrying capacity of the beam. The result is similar to pressing on the ends of a set of books in order to pick up the whole set of books at once.
+
The MDOT Bridge Design PM (or their delegate) is responsible for coordinating the shop drawing review process for all shop drawings required for pay items on bridge plan sheets. The coordinator is responsible for distributing shop drawings to the appropriate MDOT technical review areas (structural fabrication, load rating, ancillary structures, etc.) for review and comment. Once all comments have been addressed, the Bridge Design PM (or their delegate) stamps the drawing according to the following three stamp designations:
 +
# '''Approved''' – This stamp is used when the shop drawings appear to be in general conformance with the contract plans. All sheets are required to be stamped.
 +
# '''Approved Subject to Correction''' – This stamp is used when the shop drawings appear to be in general conformance with the contract plans, but there are very minor corrections needed for historical records that will not affect fabrication of the elements. Only the first sheet is stamped.
 +
# '''Revise and Resubmit''' – This stamp is used when the shop drawings are not in general conformance with the contract plans and approval could result in elements being incorrectly fabricated. Only the first sheet is stamped.
 +
 +
[[File:708.2.jpg|thumbnail|500px|center|'''Figure 708.2 MDOT Shop Drawing Stamps''']]
  
{{top}}
 
  
====[[#Beams|Beams]]====
 
  
The Department uses four general kinds of prestressed concrete beams:
+
===Shop Inspections===
  
* Side by side box beams
+
==== Fabrication Notification ====
* Spread  box beams
+
The Contractor (or the Fabricator/Supplier) must provide the Engineer with a fabrication start date at least 7 days before beginning fabrication per 708.03.B.1 of the MDOT Standard Specifications for Construction (MDOT SSC).
* AASHTO I-girders (Types I-IV)
+
* Bulb-tee girders (e.g. Michigan 1800 girders)
+
  
Prestressed concrete beams vary in width, length, and depth. In general, deeper beams will span longer distances for the same loading conditions. Likewise, deeper beams used for the same span length may have wider beam spacing, and thus carry larger loads.
+
==== Prefabrication Meeting ====
 +
SFU (or the consultant PM on behalf of the SFU) will conduct a prefabrication meeting for all design-build and design-bid-build projects. Exceptions are listed below:
 +
*The frequency of prefabrication meetings can be reduced to an average of one meeting per month for Suppliers that perform continuous work for MDOT.
 +
*The SFU PM approves the deviation in writing.  
  
Another beam type that has occasionally been used is the bulb-T beam.  This beam shape can be a more effective section due to its larger bottom flange that allows more prestressing strands to be used.  It also features a wider top flange that makes the shape more stable during handling, transport and erection.
+
Some prefabrication meetings may be combined with other projects provided both projects have the same suppler (Fabricator) and Contractor, each Engineer for the different projects is okay with the meetings being combined, and the projects will be fabricated back-to-back with no excessive downtime between production.  
  
{{top}}
+
Prefabrication meeting minutes are recorded to document topics that were discussed and to follow up on action items including who is responsible for the follow up. Draft meeting minutes are typically sent out 3-5 business days before production, but this can vary depending on when the fabrication unit was notified of the work or project schedules.
 +
Prefabrication meeting minutes are recorded to document topics that were discussed and to follow up on action items including who is responsible for the follow up. Draft meeting minutes are typically sent out 3-5 business days before production, but this can vary depending on when the fabrication unit was notified of work or expedited project schedules. Final meeting minutes are typically sent out within 1 business day of the comment due date established in the prefabrication meeting.
  
=====[[#Prestressing|Prestressing]]=====
+
The following individuals are typically invited to the prefabrication meeting:
 +
* Contractor
 +
* Supplier (Fabricator)
 +
* Quality Control Inspector (QCI)
 +
* SFU:
 +
** Consultant PM
 +
** Consultant Quality Assurance Inspector (QAI)
 +
** MDOT Structural Fabrication Engineer
 +
** MDOT Transportation Engineer
 +
** MDOT Structural Precast Concrete Specialist
 +
* Engineer
 +
* Bridge Design PM
  
Prestressing is generally defined as the preloading of a structure, before application of service loads, to improve its performance in specific ways. Precast concrete elements can be prestressed by pre-tensioning or post-tensioning. Pre-tensioning and post-tensioning are subcategories of prestressing and refer to whether the strands are tensioned before concrete placement or after concrete placement, respectively.  
+
The Contractor, Supplier (Fabricator), QCI, consultant PM, QAI, and MDOT Structural Precast Concrete Specialist must attend prefabrication meetings whereas the MDOT Structural Fabrication Engineer, Transportation Engineer, Engineer, and Bridge Design PM may choose to attend prefabrication meetings. MDOT encourages all individuals listed above to attend prefabrication meetings. Note that some unique projects may require the invitation of Supplier (Fabricator) specialty subcontractors (NDT, galvanizing, metalizing, etc.) to prefabrication meetings.
  
:# Pre-tensioning: Is typically performed at the fabrication facility by using hydraulic jacks to tension seven-wire steel strands in the beam casting bed before the concrete is placed. After the concrete has reached its minimum required release strength, the tensioned strands are released by cutting at each end, which transmits a compressive force to the concrete via bond between the strands and concrete. This offsets tensile stresses in the concrete from dead load and live load and increases the load-carrying capacity of the beam.
+
==== Inspection Facilities ====
 +
The SFU is responsible for implementing the Departments QA program for fabricated materials required to be accepted based on “Fabrication Inspection” (also known as shop or QA inspection) per the MQAP manual or project special provision. Most prestressed members require QA inspection, and this inspection is performed by a qualified Quality Assurance Inspector (QAI) representing the SFU. Prestressed concrete Suppliers (Fabricators) are located nationwide and the SFU coordinates inspection at these Suppliers when MDOT work is occurring.
  
Pre-tensioning is typically used with beams and girders, although it can be used with other elements such as soundwall posts and panels, and other types of PBES such as precast pier caps, precast deck panels, etc.  Concrete spun poles are also prestressed.
+
Fabrication Inspection: SFU Website (see section 2.2 of SFQM)
  
:# Post-Tensioning: Is performed similarly to pre-tensioning but the tensioning of the strands takes place after the concrete has been placed and cured, and the post-tensioning force is distributed to the concrete via mechanical anchorages.  The most common application for post-tensioning in the Department is with side by side box beams. After side by side box beams are erected the grouted keyways between the beams are filled with non-shrink grout and cured. Typically the same seven wire strand used in pre-tensioning is grouped to make a tendon and then placed transverse to the beams centerline through ducts in the intermediate diaphragms. In some cases, more rigid steel rods are used for post-tensioning instead of seven wire strands.  The quantity of ducts and the number of strands per duct are proportional to the beam length and depth. After hydraulic jacks are used to tension the tendons to the proper load, the force is locked in and the ducts are filled with non-shrink grout.  Post-tensioning side by side box beams reduces differential deflection between adjacent beams and allows more effective live load distribution.  Post-tensioning can also be used to transmit a compressive load in pier caps, decks, and PBES in order to offset tensile forces in the element.
+
==== QAI Authority ====
 +
Throughout the fabrication process, the QAI will inspect the materials and fabricated elements for conformance to MDOT specifications and project special provisions (SPs) in accordance with the Structural Fabrication Quality Manual (SFQM) and supplemental Inspection Test Plans (ITPs). In addition, the QAI will collect all documentation regarding fabrication and verify Buy America (BA) provisions were met. If problems arise during the fabrication, the QAI will contact their PM for resolution and the PM may seek additional guidance from the SFU. Once fabrication is complete and the members inspected for conformance to project specifications, the members will be stored for shipping.
  
{{top}}
+
QAI Requirements: SFU Website (see section 2.2.4 of SFQM)
  
====[[#Concrete Spun Poles|Concrete Spun Poles]]====
+
==== Acceptance ====
Prestressed concrete spun poles are used to mount cameras and other Intelligent Transportation System (ITS) equipment at high elevations in order to provide the proper vantage point.  Similar to beams, strands are pre-tensioned and then the forms are rotated at a high speed to create a pole that is hollow in the middle.
 
  
 +
Acceptance of prestressed members consists of the following two-part process per the SFQM:
  
{{top}}
+
# QA (Fabrication) Inspection Acceptance: After the structural members are inspected to verify conformance to project specifications, the QAI will stamp each main member “Approved for Use”. The approval stamp indicates that the QAI has inspected the members and found that they appear to meet project requirements; however, it does not relieve the Contractor of their responsibility to meet contract requirements. Some secondary members and miscellaneous components will not be individually stamped.
  
===[[#PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS (PBES)|PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS (PBES)]]===
+
# Visual Inspection (VI) Acceptance: the Engineer must collect one copy of the stamped Bill of Lading and use it to verify the delivered structural products. Additionally, the Engineer must verify that the products are stamped and VI them for signs of damage that may have occurred due to shipping and handling. This VI should be documented in the field inspector’s daily report.
 
PBES can refer to either singular precast elements such as deck panels, footings, columns, pier caps, abutments, etc., or a system that contains multiple elements such as beams with a portion of the deck already attached.  The connections between PBES elements or between PBES elements and cast in place elements are of utmost importance.  One of the primary advantages of prefabricated elements is the speed at which they can be constructed which minimizes disruption to traffic.  If the connections are not properly laid out or constructed, significant delays can result. Therefore, it is important for connection details to be checked by both the Contractor and the Inspector on-site prior to concrete placement or connection of elements, to ensure proper fit-up. All the necessary connection details should be in the design plans.  
 
  
The use of templates by the Contractor and fabricator is encouraged. At the fabricator’s plant the dimensions should be checked by both the fabricator’s quality control (QC) personnel and the department’s (QA) quality assurance personnel. The Contractor and Inspector are also encouraged to work closely with the fabricator’s QC and the department’s QA to ensure construction goes as smooth as possible.  
+
[[File:708-10.jpg|thumbnail|500px|center|'''Figure 708.10 “APPROVED FOR USE” Stamp''']]
 +
Figure 708.10 – “APPROVED FOR USE” Stamp
  
Connection methods for PBES include, but are not limited to:
+
Acceptance: [https://www.michigan.gov/mdot/programs/bridges-and-structures/structure-construction/structural-fabrication-unit/structural-fabrication-quality-manual SFU Website] (See section 2.2.7B of SFQM)
  
* Grouted keyways or pockets
 
* Grouted mechanical splice sleeves
 
* Post-tensioning
 
  
 
{{top}}
 
{{top}}
 
 
===[[#SOUNDWALLS|SOUNDWALLS]]===
 
  
Sound walls, or noise abatement walls, can be detailed differently but typically are constructed of two types of elements, panels and posts.  Both the panels and posts may be precast and prestressed or precast with conventional steel reinforcement.
 
  
 +
==== Furnishing and Fabricating ====
 +
 +
=====Equipment=====
 +
<span style="color: red"> -Reserved- </span>
  
 
{{top}}
 
{{top}}
  
===[[#FABRICATION OF PRESTRESSED CONCRETE|FABRICATION OF PRESTRESSED CONCRETE]]===
+
===== Void Boxes, Inserts and Attachments =====
 +
<span style="color: red"> -Reserved- </span>
  
 
{{top}}
 
{{top}}
  
====[[#Shop Inspection|Shop Inspection]]====
+
===== Design and Proportioning of Concrete Mixtures =====
 +
<span style="color: red"> -Reserved- </span>
  
The Structural Fabrication Unit will conduct a prefabrication meeting with the fabricator when deemed necessary.  Prefabrication meetings are generally scheduled when the fabrication is more complex in nature or the fabricator is new to working with the Department but can be held for any project.
+
{{top}}
  
The Engineer should be notified at least one week prior to the beginning of fabrication.
+
===== Concrete Strength =====
+
<span style="color: red"> -Reserved- </span>
Quality assurance inspection is performed on most structural precast concrete elements such as prestressed beams, culverts over 10’, sound wall posts and panels, MSE wall panels, concrete spun poles, and other prefabricated bridge elements for accelerated bridge construction.  The Department’s quality assurance program is implemented by Bridge Field Service’s Structural Fabrication Unit to perform shop inspection at structural precast concrete fabrication facilities nationwide.
 
  
Throughout the fabrication process the shop inspector will inspect the materials and fabricated elements for conformance to Department specifications, collect all documentation regarding the fabrication, and verify Buy America provisions were met.  If problems arise during the fabrication, the shop inspector will contact the Structural Fabrication Unit for resolution.  Once fabrication is complete and the elements are ready to be shipped to the project site, the shop inspector will stamp the elements as well as the shipping documents “Approved for Use”.  See Figure 708.2.  The inspector then submits all fabrication documentation to the Bridge Field Services Structural Fabrication engineer for placement into the corresponding ProjectWise folder.  See Figure 708.3 for more information on the fabrication inspection process.
+
{{top}}
  
 +
===== Steel Reinforcement and Prestressing Strand =====
 +
<span style="color: red"> -Reserved- </span>
  
[[File:Fig_708.2.png|600px|thumbnail|center|Figure 708.2 - Approved for Use stamp]]
+
{{top}}
  
 
+
===== Miscellaneous Steel =====
[[File:Fig_708.3.png|600px|thumbnail|center|Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart]]
+
<span style="color: red"> -Reserved- </span>
  
 
{{top}}
 
{{top}}
  
====[[#Addressing Deficiencies|Addressing Deficiencies]]====
+
===== Welding =====
 +
<span style="color: red"> -Reserved- </span>
  
As part of the shop inspection process, the MDOT shop inspector will note the condition of structural precast elements as they are removed from the forms, and note if corrective repairs are required prior to approving the element for use on MDOT projects.  These repairs are typically done prior to being shipped to the project site, however, there are some circumstances where repairs will be required on site, so the construction inspector should be familiar with common deficiencies.
+
{{top}}
The Structural Fabrication Unit has developed, with the assistance of the Materials Section, repair procedures to assist with evaluating fabricator proposed concrete repairs to fabricated structural precast concrete elements for MDOT projects.
 
  
Fabricated structural precast concrete elements may contain defects from the fabrication process or can be damaged from the removal of formwork, handling, and shipping. The fabricator is required to notify the MDOT QA shop inspector of all defects and/or damages to fabricated elements and propose a repair procedure to MDOT for acceptance. MDOT will thoroughly evaluate the proposed procedure and provide a response.  The repair procedure will be either be approved, rejected or approved as noted. The fabricator must receive MDOT approval before performing the repair. Structural precast concrete repairs can be generalized into the following categories:
+
===== Strand Debonding =====
+
<span style="color: red"> -Reserved- </span>
* Minor Surface Defects (air holes, minor honeycombing, gouges etc.)  See Figure 708.4 through Figure 708.06 for minor surface defects
 
  
 +
{{top}}
  
[[File:Fig_708.4.png|600px|thumbnail|center|Figure 708.4 – Minor surface defect – air holes greater than 1” in any direction]]
+
===== Placing Concrete =====
 +
<span style="color: red"> -Reserved- </span>
  
 +
{{top}}
  
[[File:Fig_708.5.png|600px|thumbnail|center|Figure 708.5 – Minor surface defect – rubber gasket crease]]
+
===== Cold Weather Precautions =====
 +
<span style="color: red"> -Reserved- </span>
  
 +
{{top}}
  
[[File:Fig_708.6.png|600px|thumbnail|center|Figure 708.6 – Minor surface defect – honeycombing of PCI girder]]
+
===== Curing Elements =====
 +
<span style="color: red"> -Reserved- </span>
  
 +
{{top}}
  
* Major Surface Defects (moderate honeycombing, etc.)
+
===== Workmanship =====
 +
The QAI will inspect prestressed members after QC has performed their inspection and note any deficiencies or nonconformances (NCRs) caught by QC or observed by QA. The Supplier (Fabricator) is required to notify the MDOT QAI of all observed defects, damage, and potential NCRs and submit a proposed repair procedure to SFU for approval. The Supplier (Fabricator) must receive written approval from MDOT prior to performing any repairs.
  
* Minor Damages (spalls, cracks, broken corners, etc.) See Figure 708.7 through Figure 708.8 for examples of minor damages
+
Approved repairs are typically completed at the Supplier’s (Fabricator’s) facility prior to the member shipping to the project site; however, there may be some circumstances where approved repairs are conducted at the project site due to project schedules. In both cases, the Supplier (Fabricator) typically performs the repairs. Repairs conducted at the Supplier’s (Fabricator’s) facility will be witnessed by the QAI and repairs conducted at the project site will be witnessed by the MDOT Construction Inspector.
  
 +
* NCR Process: [https://www.michigan.gov/mdot/programs/bridges-and-structures/structure-construction/structural-fabrication-unit SFU Website] (See section 8 of SFQM)
  
[[File:Fig_708.7.png|600px|thumbnail|center|Figure 708.7 – Minor damage – broken corner at end of PCI girder]]
+
The SFU has developed standard repair procedures for common defects observed on fabricated prestressed members. These repair procedures have been reviewed by industry and should be used by the Supplier (Fabricator) when applicable to expedite the review process. The QAI or Construction Inspector should be familiar with these standard repair procedures for common deficiencies.
  
 +
MDOT Standard Repair Procedures: [https://www.michigan.gov/mdot/programs/bridges-and-structures/structure-construction/structural-fabrication-unit SFU Website] (See Appendix A4 of SFQM)
  
[[File:Fig_708.8.png|600px|thumbnail|center|Figure 708.8 – Minor damage – spalled bottom corner at the end of a box beam]]
+
===== Tolerances =====
 +
<span style="color: red"> -Reserved- </span>
  
 +
{{top}}
  
* Other, which includes major damage and elements subject to rejection.  See Figure 708.9 and Figure 708.10 for example of major deficiencies.
+
===== Stress Transfer =====
 
+
<span style="color: red"> -Reserved- </span>
[[File:Fig_708.9.png|600px|thumbnail|center|Figure 708.9 – Major deficiency – spalled bottom corner and exposed prestressing strands at the end of a box beam]]
 
  
 +
{{top}}
  
[[File:Fig_708.10.png|600px|thumbnail|center|Figure 708.10 – Major deficiency – improper consolidation of concrete and expose prestressing strands and steel reinforcement]]
+
==== Handling, Storage, and Transporting ====
 +
When loading and shipping occurs, the Supplier (Fabricator) will load the members on a truck and the QAI inspects all members again for conformance to specifications since handling damage can occur when members are transported and loaded for shipping.
  
 +
The Supplier (Fabricator) is required to provide the QAI with a minimum of five (5) copies of the Bill of Lading for each proposed shipment per the SFQM. Each Bill of Lading will be stamped “Approved for Use” (see Acceptance process below). One copy of the Bill of Lading is retained by the QAI and the other four copies are distributed to the Contractor, Supplier (Fabricator), Engineer, and Trucking Company.
  
The repair of deficiencies to the satisfaction of the Structural Fabrication Unit, or rejection of elements for major deficiencies will occur at the fabrication facility prior to shipment to the site. It is important to note the Approved for Use stamp on all structural precast elements prior to incorporation into the project.
+
Once the structural prestressed member has been visually inspected and accepted by the Engineer, the construction inspector should verify the products are stored properly prior to erection. The method of stockpiling and transporting members is covered in detail in subsection 708.03 of the Standard Specifications for Construction. Below is a list of items the inspector should check regarding the storage of structural prestressed members:
 +
* Support beams off the ground to prevent moisture and deleterious material intrusion.
 +
* Support beams across the full width on two battens, each greater than 4 inches wide.
 +
* Support beams on two battens, no more than 3 feet from the ends of the beams.
 +
* Support stacked beams, one above the other along the same vertical plane at each end of the beams.
 +
* Support the beams on level, stable ground, avoid storing beams near side slopes, or areas near heavy construction traffic.
 +
* Do not support the beam at more than two points.
 +
* Prestressed I-beam shapes may need to be laterally braced on site.
 +
* Members are to be stored in an upright position and should be thoroughly braced to avoid overturning, which may damage the member itself, adjacent members or material, or injure personnel in the immediate vicinity.
 +
* Related items such as bearings and bridge railing should also be protected from damage, dirt, and corrosion.
  
 +
===== Loading and Shipping =====
 +
[https://www.michigan.gov/mdot/programs/bridges-and-structures/structure-construction/structural-fabrication-unit SFU Website] (See section 2.2.7A of SFQM)
  
  
 
{{top}}
 
{{top}}
  
===[[#Construction Inspection|Construction Inspection]]===
+
==[[#CONSTRUCTION|'''CONSTRUCTION''']]==
  
When the beams arrive on the job site, inspect the beams before they are unloaded.  Check one end of each beam for a stamp or tag stating “approved for use.”  If the beams are approved for use, a memorandum will be sent to the TSC from Construction and Technology stating the approval of each beam and verification of all certification and test results.  Look for damage to the concrete surfaces in either the form of cracks, particularly in the area near the bearing plate (diagonal or radiating), and fine tension cracks near mid-span, or spalled off pieces.  Bring any damage to the attention of the Engineer and make a record of the damage in the daily report.  Also note in the daily report when the beams arrive in good condition.
+
===Erection of Prestressed Beams===
  
Considerable care should be exercised when handling prestressed members. Usually there is no way to repair a damaged member, short of refabrication. Beams should be kept in an upright position at all times. The method of stockpiling and transporting members is covered in detail in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/708%20Prest%20Concrete%20Beams.pdf 708.03] of the Standard Specifications for Construction.  Beams shall be supported at two points no more than 3 feet (1 m) from the ends of the beams.
+
Considerable care should be exercised when handling structural precast concrete elements. In many cases, there is no way to repair a damaged element short of re-fabrication. Below is a list of items the inspector should check regarding the erection of structural prestressed members.
 +
* Prestressed beams should be always kept in an upright position, as the beam’s own dead weight counter acts the internal prestressing force to keep the beam stable.
 +
* Verify lifting devices, usually loops of seven wire steel strand, are the only attachment used when moving a beam. The beam must not be lifted at the beams center in any way or undesirable stresses may develop and the beam may crack.
 +
* Ensure the lifting devices are removed once the beam has been placed in its final position on the substructure.
 +
* Per Section 105 of the Standard Specifications for Construction, the Engineer reserves the right to reject any shipped product that shows visual signs of damage or does not meet specification requirements.
  
{{top}}
+
Check beam markings and compare to the beam layout sheet in the plans. Make sure the beams are placed in the right location and direction. They may fit in more than one place but there is only one correct location and direction for each beam.
  
===[[#I-Beam and 1800 Beams|I-Beam and 1800 Beams]]===
+
==== Box Beams ====
 +
Below is a list of items the inspector should check regarding the erection of structural prestressed Box Beams:
 +
*Verify box beam widths will fit properly on the substructure units.
 +
*Verify box beam bearing pads are shimmed (when necessary) on each beam in an approved manner during erection to provide full bearing contact with the bottoms of the beams.
 +
*Box beams may camber more than anticipated or may experience transverse rotation such that they do not sit flush on the sole plates, which are typically beveled to accommodate camber and vertical alignment angles.
 +
*(Expansion Bearings Only) Verify the beams line up with the position dowel holes, and ensure the holes are filled with hot poured rubber sealant type filler at least 3 inches above the position dowels. Ensure the remainder of the hole is filled with Type H-1 grout.
 +
*(Fixed Bearings Only) Verify the holes are filled with Type H-1 grout.
 +
*(Side-by-Side Box Beams Only) Verify beams are set with spaces as specified on the contract plans or shop drawings and that seal washers are placed around the transverse post-tensioning conduit holes.
 +
*Note in the Daily Work Report (DWR) when erection has been completed.
  
Check beam markings and compare to the beam layout sheet in the plans. Make sure the beams are placed in the right location and direction. They may fit in more than one place but there is only one correct location and direction for each beam.
+
Below is a list of items the inspector should check regarding the post-tensioning of side-by-side box beams after erection:
 +
*Verify the space between the box beams is completely filled, full depth, with R-2 grout mortar and cured for at least 48 hours.
 +
*Ensure the contractor does not grout when temperatures are below 40° F.
 +
*The deck width should be measured by the Contractor as soon as the beams are set to ensure the post tensioning rods or strand will be fabricated to the proper length.
 +
*All hardware dimensions must be as shown on the plans or shop drawings.
 +
*Tendons or rods for post-tensioning should be tensioned with calibrated jacks according to a Contractor-supplied calibration chart showing the corresponding jack pressures and elongations necessary to gradually build up to the required post-tensioning force.
 +
*After the post-tensioning is complete, ensure the conduit is flushed with water, then compressed air.
 +
*The tendon or rod holes will be grouted under pressure with Type E-1 grout for steel tendons or rods as specified in subsection 708.03B of the Standard Specifications for Construction.
  
Lifting devices, usually loops of cable, are cast into the member and these should be the only attachment used when moving a beam.  The lifting device must have adequate capacity to lift the beams and set them in place.  Never lift the beam near the center. If the beam has to be set down before being placed, never allow it to be supported at the center.  Crib it under the ends.  The prestressing forces pulling in on the ends of the beam hold up the dead weight of the beam and there is no top reinforcement.  If the beam is supported or lifted at the center, the prestressing forces will cause the beam to crack.
+
'''Do not stand behind the jacking machine or rod holes during jacking procedures. If a tendon or rod snaps, it can cause serious injury'''
  
The beams in a structure may also be different widths.  When setting the beams, be sure to have the right size neoprene bearing pad is used and is centered under the bearing plate of the beam.
+
==== I-Beams, 1800 Beams, and Bulb-Tee Beams ====
  
{{top}}
+
Below is a list of items the inspector should check regarding the erection of structural prestressed beams and girders:
 +
*After the first and second member (beam or girder) are erected, the second member must be attached to first through the diaphragm connection(s). In addition, each subsequent member must be attached to the previously erected member through the diaphragm connection(s).
 +
*Prestressed beams and girders, especially taller and longer members, can be more prone to sweep, transverse deflection, or even rotation. For this reason, they should be rigidly blocked in place via diaphragm connections to ensure proper spacing between members and to avoid beam rotation during construction.
 +
*Verify member (beam or girder) bearing pads are shimmed (when necessary) on each member in an approved manner during erection to provide full bearing contact with the bottoms of the beam/girder.
 +
*(1800 Girder only) Verify use of beveled sole plates on each girder and note in the Daily Work Report (DWR).
 +
*Note in the Daily Work Report (DWR) when erection has been completed.
  
===[[#Box Beams|Box Beams]]===
+
==== Spun Pole ====
  
To ensure that box beams will fit properly on the substructure units, the beam widths should be checked.  Beam bearing pads must be shimmed in an approved manner during erection to provide full bearing contact with the bottoms of the beams. This needs to be checked on every box beam.  Note in the daily report when the beam erection has been completed.
+
Below is a list of items the inspector should check regarding the erection of prestressed spun poles:
 +
*During installation, the poles must only be lifted and stored using the locations and methods shown on the approved shop drawings or manufacturer’s instructions.
 +
*Visually inspect spun pole for any damage, cracks, or spalls and notify the Engineer if present.
 +
*Note, the concrete clear cover for spun poles is typically less than a prestressed beam so cracks or spalls may increase the members susceptibility to steel corrosion.  
 +
*Spun concrete poles must be safely secured after being placed in the drilled shaft installation before the concrete foundation is poured and cured
  
The beams should be set with spaces between the beams as specified on the plans or shop drawings and with the seal washers placed in the duct holes.  The space between the beams should be completely filled, full depth, with R-2 mortar and cured for at least 48 hours.  The deck width should be measured by the Contractor as soon as the beams are set to assure that post tensioning rods or tendons will be fabricated to the proper length.
+
==== Sound Wall ====
  
All hardware dimensions must be as shown on the plans or shop drawings. Tendons or rods should be tensioned with calibrated jacks according to a Contractor-supplied calibration chart showing the corresponding jack pressures and rod elongations necessary to gradually build up to the required stressing force. After the tensioning is complete, the tendon or rod holes will be grouted as described in the standard specifications.
+
Below is a list of items the inspector should check regarding the erection of sound walls:
 +
*In most cases the sound wall panels are attached to the posts using tongue and groove joints. It is important during erection that the panels are lowered slowly into position and do not crack or spall the posts.
 +
*If the sound wall posts contain grout pockets (prestressed sound walls only), then the grout pockets at the ends of the posts must be filled with non-shrink grout and should be free of cracks.
 +
*Note, a ladder should be used to visually inspect the tops of soundwall posts.
 +
*Visually inspect sound wall posts for damage, shrinkage, cracks, or spalls and notify the Engineer if present.
 +
*Note, cracks and other deficiencies will be subject to moisture and chloride intrusion which can lead to rapid deterioration of the posts.
 +
  
'''Do not stand behind the jacking machine or rod holes during jacking procedures.  If a tendon or rod snaps, it will cause serious injury.'''
 
  
 
{{top}}
 
{{top}}
  
==[[#MATERIALS|MATERIALS]]==
+
==[[#INSPECTION & TESTING|'''INSPECTION & TESTING''']]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
Line 208: Line 299:
 
{{top}}
 
{{top}}
  
==[[#CONSTRUCTION|CONSTRUCTION]]==
+
==[[#MEASUREMENT, DOCMENTATION & PAYMENT|'''MEASUREMENT, DOCMENTATION & PAYMENT''']]==
 +
 
  
<span style="color: red"> -Reserved- </span>
+
===Basis of Payment===
 +
 
 +
There are three methods of payment for structural precast concrete members: Stockpile payment, partial shipment payment, and final shipment payment. No method of payment relieves the Contractor (or Fabricator) from damage due to transporting, storing on the project site, or erecting the elements. Additional information on payment can be found in Section 109 of the MDOT Standard Specifications for Construction.
  
{{top}}
+
The Engineer will make stockpile payments for fabricated structural steel products in accordance with section 109 of the MDOT SSC. See subsection 2.2.6 of the SFQM for SFUs responsibilities with stockpile payment. These materials can be stored at the fabrication facility or at the construction site. If stored at the construction site, the materials must be inspected by the Engineer as stockpiling occurs since the approval stamp ink could wash away over time. If the approval stamp(s) appear to be fading away, the Engineer must mark the accepted structural steel products in a more permanent method.
  
==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]==
+
After the Supplier (Fabricator) has shipped a portion of the structural concrete elements to the project site, visually inspect the members and verify they are stamped “Approved For Use” according to the sections above. If all the documentation is provided and there are no deficiencies, then partial shipment payment may be made. The Engineer must follow section 109.04 of the MDOT Standard Specifications for Construction.
  
<span style="color: red"> -Reserved- </span>
+
After the Supplier (Fabricator) has shipped all of the structural concrete elements to the project site, visually inspect the members and verify they are stamped “Approved For Use” according to the sections above. If all the documentation is provided and there are no deficiencies, then final shipment payment may be made. The Engineer must follow section 109.04 of the MDOT Standard Specifications for Construction.
  
 
{{top}}
 
{{top}}
 +
  
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]
 +
[[Category: Division 7]]
 +
[[Category: Section 708]]
 +
[[Category:New CM Format]]

Latest revision as of 12:02, 23 October 2024

708
Prestressed Concrete


GENERAL DESCRIPTION

Structural prestressed concrete members (also known as elements) are cast in forms at a Fabricator certified by the Prestressed Concrete Institute (PCI). A Fabricator supplying prestressed concrete bridge beams for MDOT use must also be an approved Supplier per MDOT’s Supplier Qualification Standard (SQS). A list of approved prestressed concrete beam Suppliers for MDOT projects can be found on the Structural Fabrication Unit (SFU) Website

Prestressing (pre-tensioning and post-tensioning) of precast concrete members allow for longer, more efficient spans than traditionally reinforced concrete members by introducing compressive forces into the concrete members. These compressive forces are achieved by using a high grade of steel or carbon fiber strands that are pre or post-tensioned to a predetermined load based on design requirements, temperature of steel and concrete, Contractor/Fabricator equipment, and other factors. Most prestressed concrete beams are longitudinally prestressed and some may also be transversely prestressed, such as side-by-side box beams that are post-tensioned.

Structural members that are prestressed include, but not limited to:

  • Prestressed concrete beams
  • Spun Poles
  • Prefabricated Bridge Elements and Systems (PBES)
  • Sound Wall Panels and Posts

Structural members that are not prestressed include, but not limited to:

  • Culverts
  • PBES
  • Sound Wall Panels and Posts

MDOT requires on-site quality assurance (QA) shop inspection for the fabrication of prestressed concrete members. This inspection program is managed by MDOT’s Structural Fabrication Unit (SFU).

The SFU is responsible for implementing the Departments QA program for fabricated materials required to be accepted based on “Fabrication Inspection” per the Materials Quality Assurance Procedures (MQAP) manual or project special provision. The SFU also serves as the Departments structural fabrication expert and provides recommendation to design and construction staff regarding plan details, specifications, shop drawings, shop inspection, and field inspection.

In general, MDOT utilizes consultants to provide fabrication inspection and project management; however, the Structural Fabrication Unit will randomly perform fabrication inspection and project management on select projects for various reasons. The consultant provides weekly updates for active fabrication projects to the SFU and other important information such as program changes, overall quality, communication with Fabricator, and key performance indicators (KPIs) are discussed.

The SFU adheres to MDOT’s Structural Fabrication Quality Manual (SFQM). The purpose of the SFQM is to provide the SFU and their consultants with information on implementing MDOT’s QA program for fabricated materials required to be accepted based on “Fabrication Inspection”.

The SFQM can be found on the SFU Website.

[top of page]


MATERIALS

-Reserved-

[top of page]


EQUIPMENT

-Reserved-

[top of page]


PRECONSTRUCTION

Submittals and Shop Drawings

The Shop Drawing Review Process document summarizes the process for reviewing shop drawings for permanent structural elements, temporary bridges, and other temporary works. It is important for MDOT to respond quickly to shop drawing submittals in order to keep the project moving forward.

Shop Drawing Review Process can be found on the SFU website.

Shop detail drawings, commonly called shop drawings, are a type of working drawing that the Contractor (Supplier/Fabricator) develops prior to fabrication. The Contractor is responsible for providing drawings that accurately show the appropriate details, dimensions, material requirements, fabrication procedures, and other requirements necessary to fabricate and erect structural members in accordance with the contract drawings.

Note, some Contractor submittals may be labelled as a shop drawing in ProjectWise but don’t follow the shop detail drawing requirements listed above. These types of submittals are typically working drawings, construction submittals, manufacturing drawings, or product information sheets. These are not shop detail drawings and do not follow the Shop Drawing Review Process.

The Contractor must submit for review all shop drawings and calculations (when applicable) not furnished by MDOT for all parts of the work as required by the contract in Portable Document Format (PDF) into ProjectWise. The Contractor is responsible for the correctness of the shop drawings and calculations (when applicable) and ensuring their design (when applicable) complies with any permit and design requirements.

If revisions are necessary after the shop drawing set is approved, the Contractor is required to submit a complete shop drawing set (proposed new sheets, revised sheets, and remaining sheets that are already stamped approved) for review to ensure each submittal is a standalone set.

The MDOT Bridge Design PM (or their delegate) is responsible for coordinating the shop drawing review process for all shop drawings required for pay items on bridge plan sheets. The coordinator is responsible for distributing shop drawings to the appropriate MDOT technical review areas (structural fabrication, load rating, ancillary structures, etc.) for review and comment. Once all comments have been addressed, the Bridge Design PM (or their delegate) stamps the drawing according to the following three stamp designations:

  1. Approved – This stamp is used when the shop drawings appear to be in general conformance with the contract plans. All sheets are required to be stamped.
  2. Approved Subject to Correction – This stamp is used when the shop drawings appear to be in general conformance with the contract plans, but there are very minor corrections needed for historical records that will not affect fabrication of the elements. Only the first sheet is stamped.
  3. Revise and Resubmit – This stamp is used when the shop drawings are not in general conformance with the contract plans and approval could result in elements being incorrectly fabricated. Only the first sheet is stamped.
Figure 708.2 MDOT Shop Drawing Stamps


Shop Inspections

Fabrication Notification

The Contractor (or the Fabricator/Supplier) must provide the Engineer with a fabrication start date at least 7 days before beginning fabrication per 708.03.B.1 of the MDOT Standard Specifications for Construction (MDOT SSC).


Prefabrication Meeting

SFU (or the consultant PM on behalf of the SFU) will conduct a prefabrication meeting for all design-build and design-bid-build projects. Exceptions are listed below:

  • The frequency of prefabrication meetings can be reduced to an average of one meeting per month for Suppliers that perform continuous work for MDOT.
  • The SFU PM approves the deviation in writing.

Some prefabrication meetings may be combined with other projects provided both projects have the same suppler (Fabricator) and Contractor, each Engineer for the different projects is okay with the meetings being combined, and the projects will be fabricated back-to-back with no excessive downtime between production.

Prefabrication meeting minutes are recorded to document topics that were discussed and to follow up on action items including who is responsible for the follow up. Draft meeting minutes are typically sent out 3-5 business days before production, but this can vary depending on when the fabrication unit was notified of the work or project schedules. Prefabrication meeting minutes are recorded to document topics that were discussed and to follow up on action items including who is responsible for the follow up. Draft meeting minutes are typically sent out 3-5 business days before production, but this can vary depending on when the fabrication unit was notified of work or expedited project schedules. Final meeting minutes are typically sent out within 1 business day of the comment due date established in the prefabrication meeting.

The following individuals are typically invited to the prefabrication meeting:

  • Contractor
  • Supplier (Fabricator)
  • Quality Control Inspector (QCI)
  • SFU:
    • Consultant PM
    • Consultant Quality Assurance Inspector (QAI)
    • MDOT Structural Fabrication Engineer
    • MDOT Transportation Engineer
    • MDOT Structural Precast Concrete Specialist
  • Engineer
  • Bridge Design PM

The Contractor, Supplier (Fabricator), QCI, consultant PM, QAI, and MDOT Structural Precast Concrete Specialist must attend prefabrication meetings whereas the MDOT Structural Fabrication Engineer, Transportation Engineer, Engineer, and Bridge Design PM may choose to attend prefabrication meetings. MDOT encourages all individuals listed above to attend prefabrication meetings. Note that some unique projects may require the invitation of Supplier (Fabricator) specialty subcontractors (NDT, galvanizing, metalizing, etc.) to prefabrication meetings.

Inspection Facilities

The SFU is responsible for implementing the Departments QA program for fabricated materials required to be accepted based on “Fabrication Inspection” (also known as shop or QA inspection) per the MQAP manual or project special provision. Most prestressed members require QA inspection, and this inspection is performed by a qualified Quality Assurance Inspector (QAI) representing the SFU. Prestressed concrete Suppliers (Fabricators) are located nationwide and the SFU coordinates inspection at these Suppliers when MDOT work is occurring.

Fabrication Inspection: SFU Website (see section 2.2 of SFQM)

QAI Authority

Throughout the fabrication process, the QAI will inspect the materials and fabricated elements for conformance to MDOT specifications and project special provisions (SPs) in accordance with the Structural Fabrication Quality Manual (SFQM) and supplemental Inspection Test Plans (ITPs). In addition, the QAI will collect all documentation regarding fabrication and verify Buy America (BA) provisions were met. If problems arise during the fabrication, the QAI will contact their PM for resolution and the PM may seek additional guidance from the SFU. Once fabrication is complete and the members inspected for conformance to project specifications, the members will be stored for shipping.

QAI Requirements: SFU Website (see section 2.2.4 of SFQM)

Acceptance

Acceptance of prestressed members consists of the following two-part process per the SFQM:

  1. QA (Fabrication) Inspection Acceptance: After the structural members are inspected to verify conformance to project specifications, the QAI will stamp each main member “Approved for Use”. The approval stamp indicates that the QAI has inspected the members and found that they appear to meet project requirements; however, it does not relieve the Contractor of their responsibility to meet contract requirements. Some secondary members and miscellaneous components will not be individually stamped.
  1. Visual Inspection (VI) Acceptance: the Engineer must collect one copy of the stamped Bill of Lading and use it to verify the delivered structural products. Additionally, the Engineer must verify that the products are stamped and VI them for signs of damage that may have occurred due to shipping and handling. This VI should be documented in the field inspector’s daily report.
Figure 708.10 “APPROVED FOR USE” Stamp

Figure 708.10 – “APPROVED FOR USE” Stamp

Acceptance: SFU Website (See section 2.2.7B of SFQM)


[top of page]



Furnishing and Fabricating

Equipment

-Reserved-

[top of page]


Void Boxes, Inserts and Attachments

-Reserved-

[top of page]


Design and Proportioning of Concrete Mixtures

-Reserved-

[top of page]


Concrete Strength

-Reserved-

[top of page]


Steel Reinforcement and Prestressing Strand

-Reserved-

[top of page]


Miscellaneous Steel

-Reserved-

[top of page]


Welding

-Reserved-

[top of page]


Strand Debonding

-Reserved-

[top of page]


Placing Concrete

-Reserved-

[top of page]


Cold Weather Precautions

-Reserved-

[top of page]


Curing Elements

-Reserved-

[top of page]


Workmanship

The QAI will inspect prestressed members after QC has performed their inspection and note any deficiencies or nonconformances (NCRs) caught by QC or observed by QA. The Supplier (Fabricator) is required to notify the MDOT QAI of all observed defects, damage, and potential NCRs and submit a proposed repair procedure to SFU for approval. The Supplier (Fabricator) must receive written approval from MDOT prior to performing any repairs.

Approved repairs are typically completed at the Supplier’s (Fabricator’s) facility prior to the member shipping to the project site; however, there may be some circumstances where approved repairs are conducted at the project site due to project schedules. In both cases, the Supplier (Fabricator) typically performs the repairs. Repairs conducted at the Supplier’s (Fabricator’s) facility will be witnessed by the QAI and repairs conducted at the project site will be witnessed by the MDOT Construction Inspector.

The SFU has developed standard repair procedures for common defects observed on fabricated prestressed members. These repair procedures have been reviewed by industry and should be used by the Supplier (Fabricator) when applicable to expedite the review process. The QAI or Construction Inspector should be familiar with these standard repair procedures for common deficiencies.

MDOT Standard Repair Procedures: SFU Website (See Appendix A4 of SFQM)

Tolerances

-Reserved-

[top of page]


Stress Transfer

-Reserved-

[top of page]


Handling, Storage, and Transporting

When loading and shipping occurs, the Supplier (Fabricator) will load the members on a truck and the QAI inspects all members again for conformance to specifications since handling damage can occur when members are transported and loaded for shipping.

The Supplier (Fabricator) is required to provide the QAI with a minimum of five (5) copies of the Bill of Lading for each proposed shipment per the SFQM. Each Bill of Lading will be stamped “Approved for Use” (see Acceptance process below). One copy of the Bill of Lading is retained by the QAI and the other four copies are distributed to the Contractor, Supplier (Fabricator), Engineer, and Trucking Company.

Once the structural prestressed member has been visually inspected and accepted by the Engineer, the construction inspector should verify the products are stored properly prior to erection. The method of stockpiling and transporting members is covered in detail in subsection 708.03 of the Standard Specifications for Construction. Below is a list of items the inspector should check regarding the storage of structural prestressed members:

  • Support beams off the ground to prevent moisture and deleterious material intrusion.
  • Support beams across the full width on two battens, each greater than 4 inches wide.
  • Support beams on two battens, no more than 3 feet from the ends of the beams.
  • Support stacked beams, one above the other along the same vertical plane at each end of the beams.
  • Support the beams on level, stable ground, avoid storing beams near side slopes, or areas near heavy construction traffic.
  • Do not support the beam at more than two points.
  • Prestressed I-beam shapes may need to be laterally braced on site.
  • Members are to be stored in an upright position and should be thoroughly braced to avoid overturning, which may damage the member itself, adjacent members or material, or injure personnel in the immediate vicinity.
  • Related items such as bearings and bridge railing should also be protected from damage, dirt, and corrosion.
Loading and Shipping

SFU Website (See section 2.2.7A of SFQM)


[top of page]


CONSTRUCTION

Erection of Prestressed Beams

Considerable care should be exercised when handling structural precast concrete elements. In many cases, there is no way to repair a damaged element short of re-fabrication. Below is a list of items the inspector should check regarding the erection of structural prestressed members.

  • Prestressed beams should be always kept in an upright position, as the beam’s own dead weight counter acts the internal prestressing force to keep the beam stable.
  • Verify lifting devices, usually loops of seven wire steel strand, are the only attachment used when moving a beam. The beam must not be lifted at the beams center in any way or undesirable stresses may develop and the beam may crack.
  • Ensure the lifting devices are removed once the beam has been placed in its final position on the substructure.
  • Per Section 105 of the Standard Specifications for Construction, the Engineer reserves the right to reject any shipped product that shows visual signs of damage or does not meet specification requirements.

Check beam markings and compare to the beam layout sheet in the plans. Make sure the beams are placed in the right location and direction. They may fit in more than one place but there is only one correct location and direction for each beam.

Box Beams

Below is a list of items the inspector should check regarding the erection of structural prestressed Box Beams:

  • Verify box beam widths will fit properly on the substructure units.
  • Verify box beam bearing pads are shimmed (when necessary) on each beam in an approved manner during erection to provide full bearing contact with the bottoms of the beams.
  • Box beams may camber more than anticipated or may experience transverse rotation such that they do not sit flush on the sole plates, which are typically beveled to accommodate camber and vertical alignment angles.
  • (Expansion Bearings Only) Verify the beams line up with the position dowel holes, and ensure the holes are filled with hot poured rubber sealant type filler at least 3 inches above the position dowels. Ensure the remainder of the hole is filled with Type H-1 grout.
  • (Fixed Bearings Only) Verify the holes are filled with Type H-1 grout.
  • (Side-by-Side Box Beams Only) Verify beams are set with spaces as specified on the contract plans or shop drawings and that seal washers are placed around the transverse post-tensioning conduit holes.
  • Note in the Daily Work Report (DWR) when erection has been completed.

Below is a list of items the inspector should check regarding the post-tensioning of side-by-side box beams after erection:

  • Verify the space between the box beams is completely filled, full depth, with R-2 grout mortar and cured for at least 48 hours.
  • Ensure the contractor does not grout when temperatures are below 40° F.
  • The deck width should be measured by the Contractor as soon as the beams are set to ensure the post tensioning rods or strand will be fabricated to the proper length.
  • All hardware dimensions must be as shown on the plans or shop drawings.
  • Tendons or rods for post-tensioning should be tensioned with calibrated jacks according to a Contractor-supplied calibration chart showing the corresponding jack pressures and elongations necessary to gradually build up to the required post-tensioning force.
  • After the post-tensioning is complete, ensure the conduit is flushed with water, then compressed air.
  • The tendon or rod holes will be grouted under pressure with Type E-1 grout for steel tendons or rods as specified in subsection 708.03B of the Standard Specifications for Construction.

Do not stand behind the jacking machine or rod holes during jacking procedures. If a tendon or rod snaps, it can cause serious injury

I-Beams, 1800 Beams, and Bulb-Tee Beams

Below is a list of items the inspector should check regarding the erection of structural prestressed beams and girders:

  • After the first and second member (beam or girder) are erected, the second member must be attached to first through the diaphragm connection(s). In addition, each subsequent member must be attached to the previously erected member through the diaphragm connection(s).
  • Prestressed beams and girders, especially taller and longer members, can be more prone to sweep, transverse deflection, or even rotation. For this reason, they should be rigidly blocked in place via diaphragm connections to ensure proper spacing between members and to avoid beam rotation during construction.
  • Verify member (beam or girder) bearing pads are shimmed (when necessary) on each member in an approved manner during erection to provide full bearing contact with the bottoms of the beam/girder.
  • (1800 Girder only) Verify use of beveled sole plates on each girder and note in the Daily Work Report (DWR).
  • Note in the Daily Work Report (DWR) when erection has been completed.

Spun Pole

Below is a list of items the inspector should check regarding the erection of prestressed spun poles:

  • During installation, the poles must only be lifted and stored using the locations and methods shown on the approved shop drawings or manufacturer’s instructions.
  • Visually inspect spun pole for any damage, cracks, or spalls and notify the Engineer if present.
  • Note, the concrete clear cover for spun poles is typically less than a prestressed beam so cracks or spalls may increase the members susceptibility to steel corrosion.
  • Spun concrete poles must be safely secured after being placed in the drilled shaft installation before the concrete foundation is poured and cured

Sound Wall

Below is a list of items the inspector should check regarding the erection of sound walls:

  • In most cases the sound wall panels are attached to the posts using tongue and groove joints. It is important during erection that the panels are lowered slowly into position and do not crack or spall the posts.
  • If the sound wall posts contain grout pockets (prestressed sound walls only), then the grout pockets at the ends of the posts must be filled with non-shrink grout and should be free of cracks.
  • Note, a ladder should be used to visually inspect the tops of soundwall posts.
  • Visually inspect sound wall posts for damage, shrinkage, cracks, or spalls and notify the Engineer if present.
  • Note, cracks and other deficiencies will be subject to moisture and chloride intrusion which can lead to rapid deterioration of the posts.


[top of page]


INSPECTION & TESTING

-Reserved-

[top of page]


MEASUREMENT, DOCMENTATION & PAYMENT

Basis of Payment

There are three methods of payment for structural precast concrete members: Stockpile payment, partial shipment payment, and final shipment payment. No method of payment relieves the Contractor (or Fabricator) from damage due to transporting, storing on the project site, or erecting the elements. Additional information on payment can be found in Section 109 of the MDOT Standard Specifications for Construction.

The Engineer will make stockpile payments for fabricated structural steel products in accordance with section 109 of the MDOT SSC. See subsection 2.2.6 of the SFQM for SFUs responsibilities with stockpile payment. These materials can be stored at the fabrication facility or at the construction site. If stored at the construction site, the materials must be inspected by the Engineer as stockpiling occurs since the approval stamp ink could wash away over time. If the approval stamp(s) appear to be fading away, the Engineer must mark the accepted structural steel products in a more permanent method.

After the Supplier (Fabricator) has shipped a portion of the structural concrete elements to the project site, visually inspect the members and verify they are stamped “Approved For Use” according to the sections above. If all the documentation is provided and there are no deficiencies, then partial shipment payment may be made. The Engineer must follow section 109.04 of the MDOT Standard Specifications for Construction.

After the Supplier (Fabricator) has shipped all of the structural concrete elements to the project site, visually inspect the members and verify they are stamped “Approved For Use” according to the sections above. If all the documentation is provided and there are no deficiencies, then final shipment payment may be made. The Engineer must follow section 109.04 of the MDOT Standard Specifications for Construction.