==[[#Construction Manual Update Process|'''Construction Manual Update Process''']]==
+
=Construction Manual Change Process=
  
−
Suggested revisions to the MDOT Construction Manual are welcome from all users.  The more users help improve the content, the more it improves the guidance for all other users.
+
Suggested revisions will come from various users of the Wiki Construction Manual; these could be MDOT employees, Consultants, and Contractor’s.  The key item is that they must be registered users of the system if the suggested change comes from outside of the Content Managers review team.
  
−
To make a revision suggestion to the '''Construction Manual please email [mailto:[email protected] [email protected]] '''
+
To make a revison suggestion to the Construction Manual please email the appropriate division Content Manager found at this link to the [[Help:Contents#Content_Suggestions|Help page]].
−
{{top}}
 
−
 
 
−
===[[#Content Changes/Submissions|'''Content Changes/Submissions''']]===
 
−
 
 
−
Changes or suggestions should be submitted to the [mailto:[email protected] [email protected]] resource email.
 
−
 
 
−
New content submissions should be drafted per the [[MDOT_Construction_Manual_Style_Guide|'''MDOT Construction Manual Style Guide''']] and formatted to match the standard [[CONSTRUCTION_MANUAL_CONTENT_TEMPLATE|'''Construction Manual Content Template''']].  This will help all sections of the Construction Manual have a familiar format and structure for the users.
 
−
 
 
−
* [[CONSTRUCTION_MANUAL_CONTENT_TEMPLATE|'''Construction Manual Content Template''']]
 
−
 
 
−
* [[MDOT_Construction_Manual_Style_Guide|'''MDOT Construction Manual Style Guide''']]
 
−
 
 
−
* MDOT Construction Manual ADA Compliance Requirements for Pictures/Images:
 
−
 
 
−
[[File:MDOT Image Accessibility Handout.pdf||thumb|center|600px|'''[https://mdotwiki.state.mi.us/images_construction/c/c2/MDOT_Image_Accessibility_Handout.pdf MDOT Construction Manual ADA Compliance Requirements for Pictures/Images]''']]
 
  
 +
=Types of Changes=
  
 +
Typically there are three types of changes:
  
 +
Type 1: Spelling/Grammatical/Error Correction/Clarification Changes– These types of changes will not require additional approval processes or assembly of review teams. 
  
 +
::By clarification the intent is best described in the following example:
 +
:::''The use of the acronym ITS throughout an article in the Wiki Constructional Manual.  Shortly after publishing the article numerous calls come in asking what does ITS mean.  The clarification would be a revision to the first occurrence of ITS in the article to appear as Intelligent Transportation System (ITS).''
  
 +
Type 2: Minor Process Changes – These could be updates in a form required for inspection with instructions on how to complete the form.  Items to be aware of during inspection of an item of work etc.
  
 +
Type 3: Major Changes – Changes that will have a statewide impact to the delivery of the program either monetarily, staffing, equipment, procedural, material and documentation requirements.
 
{{top}}
 
{{top}}
  
−
==[[#Construction Manual Updates|'''Construction Manual Updates''']]==
+
=Content Managers Review Team=
−
 
 
−
===[[#Types of Changes|'''Types of Changes''']]===
 
−
Typically there are three types of Construction Manual update changes:
 
−
 
 
−
* '''Type 1''': '''Minor Clerical Updates'''.
 
−
**Fixing the Spelling, Correcting Errors, Broken Links, etc.
 
  
−
* '''Type 2''': '''Minor Process Changes'''
+
The Content Manager will typically set up a review team, consisting of subject matter experts to review the validity of suggested changes.  The team can be made up of direct reports, industry partners, FHWA, etc. Essentially the team can be made up of anyone who the Content Manager feels will be able to provide the best review and input for the suggested change.
−
**These might include Form updates, contact information changes, new routing of forms, etc.
 
−
**Minor items that require approval of the Division Content Manager
 
−
**Typically published in the [[Main_Page#Recent_Minor_Changes|Minor Changes Table]] or sometimes in the [[Main_Page#Recent_Major_Changes|Major Change Table]] on the main page. 
 
−
 
 
−
* '''Type 3''': '''Major Changes'''
 
−
**Changes that will have a statewide impact to the delivery of the program either monetarily, staffing, equipment, procedural, material and documentation requirements. 
 
−
**Changes passed down from Federal or State oversight agencies
 
−
**Typically published in the [[Main_Page#Recent_Major_Changes|Major Changes Table]] on the main page.  
 
 
{{top}}
 
{{top}}
  
−
===[[#Construction Manual Update Review Process|'''Construction Manual Update Review Process''']]===
+
=Review Process=
 +
As of October 19, 2015, the Construction Field Services (CFS) Division stopped issuing new Bureau of Highway Instructional Memorandums (BOHIMs).  CFS has been communicating information on new and/or updated procedures and processes through Construction Manual Updates (CMU).  Similar to the BOHIM approval process, CMU’s that effect procedure and policy are still being submitted for region review prior to incorporation into the Construction Manual.  The Wiki format Construction Manual can be found online at the link below:
 +
[[Main_Page|http://mdotwiki.state.mi.us/construction/index.php/Main_Page]]
  
−
====[[#Division Content Managers Review Team|'''Division Content Managers Review Team''']]====
 
  
−
The proposed changes will be reviewed by CFS and the Division Content Managers.  The Content Manager will then set up a review team consisting of subject matter experts to review the validity of suggested changes.  The team can be made up of direct reports, industry partners, FHWA, and anyone who the Content Manager feels will be able to provide the best review and input for the suggested change.
+
The Wiki format allows for the Construction Manual to be continuously updated monthly to remain current with changing practice.  The process for revising the Construction Manual is based on the impact that the change will have and is defined below:
  
−
====[[#Construction Manual Update Approval Process|'''Construction Manual Update Approval Process''']]====
 
  
−
The Wiki format allows for the Construction Manual to be continuously updated to remain current with changing practice.  CFS has been communicating information on new and/or updated procedures and processes through Construction Manual Updates (CMU).  The process for revising the Construction Manual is based on the impact that the change will have and is defined below:
+
'''Type 1: Spelling/Grammatical/Clarification Change'''
−
 
 
−
 
 
−
===== '''Type 1: Minor Clerical Updates''' =====
 
 
*These changes do not require additional approval processes.
 
*These changes do not require additional approval processes.
−
*Updates will be made in the Construction Manual and updates of note may also be listed in the [[Main_Page#Recent_Minor_Changes|Minor Changes Table]] on the main page.
 
  
  
−
====='''Type 2: Minor Process Changes'''=====
+
'''Type 2: Minor Process Changes'''
 
*This may require assembly of a team of subject matter experts to review the wording and create any supporting information for the change.
 
*This may require assembly of a team of subject matter experts to review the wording and create any supporting information for the change.
−
*Final approval by the Division Content Manager for that Section.
+
*An independent review by another content manager or other unit within the department should be conducted as a check for understandability of the revision and to verify that the revision is not a major change.
−
*Updates will be published and the changes noted in the [[Main_Page#Recent_Minor_Changes|Minor Changes Table]] or sometimes in the [[Main_Page#Recent_Major_Changes|Major Change Table]] on the main page.
+
*Approval by the Engineer of CFS is required prior to publishing a type 2 change to the Wiki Construction Manual.  The Engineer of CFS will determine if the change should be coordinated with the FHWA and discuss with an FHWA representative before approval if necessary.
 +
 
  
−
====='''Type 3: Major Changes'''=====
+
'''Type 3: Major changes that have a statewide impact to the delivery of the program.'''
−
*Once a suggested major change is submitted to the content manager, the content manager shall assemble a team for subject matter experts to review the suggested change for technical merit, economic impact, staffing impact, industry impacts, etc.  This same team will provide comments on the content of the update.
+
*Once a suggested major change is submitted to the content manager, a team of subject matter experts is assembled to review the suggested change for technical merit, economic impact, staffing impact, industry impacts, etc.  This same team will provide comments on the content of the update.
−
*If it is deemed that the change is beneficial or required of the department then the content manager will copy that section of the Construction Manual into a word document, enable track changes and draft the revision.  This document will be submitted to the Construction Administration Engineer for review.
+
*If it is deemed that the change is beneficial or required of the department then the content manager will format the revision following a style that is similar for that section of the Construction Manual.
−
*Once approved the CFS Construction Administration Section will then submit the update for a two week region review & comment period.  
+
*The CFS Construction Administration Section will then submit the update for a two week region review period.  
−
*Once all comments are received they will be addressed by the author and provided back to the Construction Administration Engineer
+
*Once all comments are received they will be addressed by the author and provided to the Region Engineer Liaisons to the Bureau of Field Services (BFS), BFS leadership (Bureau Director, Deputy Bureau Director, Engineer of Operations Field Services and Engineer of Construction Field Services), and the Federal Highway Administration (FHWA) for review and approval. The addressed comment document and the revised construction manual update will also be sent to the Statewide Alignment Construction Team for region knowledge.  After approval is received from the Region Engineer Liaisons to BFS, BFS leadership and the FHWA the change is published in the Wiki Construction Manual.
−
*The Federal Highway Administration (FHWA) will then review and approve the proposed changes.
 
−
*Final Approval will come from the Region Engineer Liaisons to the Bureau of Field Services (BFS), and BFS Leadership (Bureau Director, Engineer of Construction Field Services and TSMO Division Administrator)
 
−
*Final changes will then be published in the Construction Manual, and logged in the [[Main_Page#Recent_Major_Changes|Major Change Table]].
 
−
*For major changes a GovDelivery email will also be sent to CFS listserv users.   
 
 
{{top}}
 
{{top}}
  
  
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]

Revision as of 12:04, 19 May 2026

Construction Manual Change Process

Suggested revisions will come from various users of the Wiki Construction Manual; these could be MDOT employees, Consultants, and Contractor’s. The key item is that they must be registered users of the system if the suggested change comes from outside of the Content Managers review team.

To make a revison suggestion to the Construction Manual please email the appropriate division Content Manager found at this link to the Help page.

Types of Changes

Typically there are three types of changes:

Type 1: Spelling/Grammatical/Error Correction/Clarification Changes– These types of changes will not require additional approval processes or assembly of review teams.

By clarification the intent is best described in the following example:
The use of the acronym ITS throughout an article in the Wiki Constructional Manual. Shortly after publishing the article numerous calls come in asking what does ITS mean. The clarification would be a revision to the first occurrence of ITS in the article to appear as Intelligent Transportation System (ITS).

Type 2: Minor Process Changes – These could be updates in a form required for inspection with instructions on how to complete the form. Items to be aware of during inspection of an item of work etc.

Type 3: Major Changes – Changes that will have a statewide impact to the delivery of the program either monetarily, staffing, equipment, procedural, material and documentation requirements.

[top of page]


Content Managers Review Team

The Content Manager will typically set up a review team, consisting of subject matter experts to review the validity of suggested changes. The team can be made up of direct reports, industry partners, FHWA, etc. Essentially the team can be made up of anyone who the Content Manager feels will be able to provide the best review and input for the suggested change.

[top of page]


Review Process

As of October 19, 2015, the Construction Field Services (CFS) Division stopped issuing new Bureau of Highway Instructional Memorandums (BOHIMs). CFS has been communicating information on new and/or updated procedures and processes through Construction Manual Updates (CMU). Similar to the BOHIM approval process, CMU’s that effect procedure and policy are still being submitted for region review prior to incorporation into the Construction Manual. The Wiki format Construction Manual can be found online at the link below: http://mdotwiki.state.mi.us/construction/index.php/Main_Page


The Wiki format allows for the Construction Manual to be continuously updated monthly to remain current with changing practice. The process for revising the Construction Manual is based on the impact that the change will have and is defined below:


Type 1: Spelling/Grammatical/Clarification Change

  • These changes do not require additional approval processes.


Type 2: Minor Process Changes

  • This may require assembly of a team of subject matter experts to review the wording and create any supporting information for the change.
  • An independent review by another content manager or other unit within the department should be conducted as a check for understandability of the revision and to verify that the revision is not a major change.
  • Approval by the Engineer of CFS is required prior to publishing a type 2 change to the Wiki Construction Manual. The Engineer of CFS will determine if the change should be coordinated with the FHWA and discuss with an FHWA representative before approval if necessary.


Type 3: Major changes that have a statewide impact to the delivery of the program.

  • Once a suggested major change is submitted to the content manager, a team of subject matter experts is assembled to review the suggested change for technical merit, economic impact, staffing impact, industry impacts, etc. This same team will provide comments on the content of the update.
  • If it is deemed that the change is beneficial or required of the department then the content manager will format the revision following a style that is similar for that section of the Construction Manual.
  • The CFS Construction Administration Section will then submit the update for a two week region review period.
  • Once all comments are received they will be addressed by the author and provided to the Region Engineer Liaisons to the Bureau of Field Services (BFS), BFS leadership (Bureau Director, Deputy Bureau Director, Engineer of Operations Field Services and Engineer of Construction Field Services), and the Federal Highway Administration (FHWA) for review and approval. The addressed comment document and the revised construction manual update will also be sent to the Statewide Alignment Construction Team for region knowledge. After approval is received from the Region Engineer Liaisons to BFS, BFS leadership and the FHWA the change is published in the Wiki Construction Manual.