Difference between revisions of "824 - Construction Surveying and Staking"

From MediaWiki
Jump to navigation Jump to search
Line 70: Line 70:
  
  
−
====[[#Quality Control Staff|Quality Control Staff]]====
+
^====[[#Quality Control Staff|Quality Control Staff]]====
 
*The licensed professional surveyor named in the quality control plan should be the individual responsible for providing professional oversight of the staking activities. This person does not need to serve as the plan manager or site contact, but may do so if appropriate.
 
*The licensed professional surveyor named in the quality control plan should be the individual responsible for providing professional oversight of the staking activities. This person does not need to serve as the plan manager or site contact, but may do so if appropriate.
  

Revision as of 17:19, 19 February 2026

824
Contractor Staking


CONSTRUCTION MANUAL CONTENT TEMPLATE - WIKI CODE

-Reserved-

[top of page]



GENERAL DESCRIPTION

Contractor Responsibilities If the contractor staking pay item is included in the project then the Contractor is responsible for work as defined in 824.03B - 824.03W.


[top of page]


Definitions and Terms

-Reserved-

[top of page]


General Overview

-Reserved-

[top of page]


Contractor Prequalification

-Reserved-

[top of page]



MATERIALS

-Reserved-

[top of page]


EQUIPMENT

-Reserved-

[top of page]


Description of Equipment Used

-Reserved-

[top of page]


Equipment Specifications

-Reserved-

[top of page]


Pictures of Equipment

-Reserved-

[top of page]


PRECONSTRUCTION

Submittals

Contractor Staking Quality Control Plan (CSQC)

The contractor quality control plan is an important communication tool that identifies key contacts, quality control procedures, documentation methods, equipment certification, staking tolerances, and field equipment check procedures.

CONTRACTOR STAKING QUALITY CONTROL PLAN

CONTRACTOR STAKING QUALITY CONTROL PLAN


^====Quality Control Staff====

  • The licensed professional surveyor named in the quality control plan should be the individual responsible for providing professional oversight of the staking activities. This person does not need to serve as the plan manager or site contact, but may do so if appropriate.

Equipment Calibration

  • Copies of equipment certification for levels, transits, lasers, and total stations should be provided to the Engineer. Equipment should be calibrated at a minimum on an annual basis and as needed throughout the project. Field checks should be performed and documented.
Certification

Provide equipment calibration certification documentation for levels, transits, lasers, and total stations. Calibration certifications must be completed by a third-party verifying that equipment meets the accuracy requirements as specified by the manufacturer.

doc lionks

Onsite Field Equipment Checks

Check and test equipment prior to use and per manufacturer’s specifications. Perform additional checks if equipment accuracy becomes questionable due to impacts, environmental conditions, or observed inconsistencies.

  1. Method of Field Verification Perform field checks in accordance with the Design Survey Manual and the Survey Standards of Practice procedures and manufacturer-recommended methods applicable for the equipment used. Document all verification activities, including the method, readings, and adjustments made during the project and provide to the Engineer.
  2. Documentation Submit field verification records to the Engineer. Records must include:
    1. Date of field verification
    2. Equipment type, model, and serial number
    3. Verification method used
    4. Recorded readings and any adjustments
    5. Confirmation of compliance with tolerance limits
Non-Compliant Equipment

Remove equipment immediately from service if it is found to be out of tolerance during checks. Recalibrate and recertify the equipment before returning to service. Notify the Engineer and provide recalibration and recertification documentation.


-Reserved-

[top of page]


Permits

-Reserved-

[top of page]


Qualified Products List (QPL)

-Reserved-

[top of page]


Plant Inspections

-Reserved-

[top of page]


Contractor Submitted Plans/Procedures

-Reserved-

[top of page]


CONSTRUCTION

Construction Requirements/Procedures/Installation Methods

-Reserved-

[top of page]


Safety

-Reserved-

[top of page]


Productivity information/charts

-Reserved-

[top of page]


Items of Note

-Reserved-

[top of page]



Layout / Survey

Use of Automated Machine Guidance (AMG)

The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process.

Automated Machine Guidance
AMG Sample Work Plan
AMG Verification Form


[top of page]



INSPECTION & TESTING

Inspection Procedures

-Reserved-

[top of page]


Special Attention Areas

-Reserved-

[top of page]


QA/QC Tests

-Reserved-

[top of page]


Lab Testing / Field Testing

-Reserved-

[top of page]


Rejection/Remedial Actions=

-Reserved-

[top of page]


MEASUREMENT, DOCMENTATION & PAYMENT

Measurement

-Reserved-

[top of page]


Documentation Requirements

-Reserved-

[top of page]


Basis of Payment

-Reserved-

[top of page]


LOCAL AGENCY PROJECTS

Only if applicable

[top of page]


RAIL PROJECTS

Only if applicable


[top of page]




CONSTRUCTION

[top of page]


Use of Automated Machine Guidance (AMG)

The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process.

Automated Machine Guidance
AMG Sample Work Plan
AMG Verification Form


[top of page]