==[[#EQUIPMENT|'''EQUIPMENT''']]==
 
==[[#EQUIPMENT|'''EQUIPMENT''']]==
 +
 +
 +
===[[#Asphalt Distributor|Asphalt Distributor]]===
 +
 +
Asphalt Distributor - the role of the asphalt distributor is to apply the binder uniformly and in specified quantities. The distributor consists of a truck- or trailer-mounted insulated tank ranging in capacity from 800 to 5,500 gallons (3,000-20,800 liters).
 +
 +
Distributors must be equipped with a heating system that will maintain the binder at the proper spraying temperature and has a system of spray bars with nozzles that apply the binder to the roadway surface.  These spray bars cover widths up to 30 feet (10 meters) in one pass.
 +
 +
The major components of a distributor are:
 +
*Asphalt tank - a distributor can consist of a truck- or trailer-mounted insulated tank ranging in capacity from 800 to 5,500 gallons (3,000-20,800 liters).  The tank should also have baffle or surge plates to stabilize the load while in motion.
 +
*Heating system - the tank should have one or two propane or diesel fired burners that direct heat into flues that pass through the tank. This allows the contents of the tank to be heated to the correct application temperature. A thermometer must be mounted in the side of the tank so that the correct temperature can be observed.
 +
*Circulating and pumping system - the asphalt pump, radar, control valve and strainer are important parts of the circulating and pumping system.  These parts must be checked to ensure they are set properly and there are no leaks. 
 +
*Spray bar and nozzles - ensure that the spray bar is at the correct height and that the proper sized nozzles are installed and at the correct angle.
 +
*Distributor controls and gauges - the distributor operator must be familar with the following controls and gauges to ensure that a uniform and precise amount of asphalt binder is applied onto the roadway.  They include: thermometer, volume gauge, strap stick pump pressure; and the control panel.
 +
Aggregate Spreader - the role of the aggregate spreader is to apply a uniform aggregate cover at a specified rate over the freshly sprayed binder. Aggregate spreaders must be self propelled and have a continuous feed feature. The major components of the aggregate spreader are:
 +
*Truck Hitch - visual check for anything broken or bent.  Ensure the locking mechanism is working properly.
 +
*Receiving Hopper - the role of the receiving hopper is to receive the aggregate from the haul truck. The receiving hopper must be visually checked for overall condition.
 +
**There should not be any holes or significant gaps that would allow aggregate to fall through to the road surface;
 +
**The conveyor belt system should have rubber, neoprene, or fabric cowling around it to prevent aggregate loss; and
 +
**There must be a flap on top of the receiving hopper to ensure tight fit against haul trucks as aggregate is being dumped into the receiving hopper.
 +
**A rubber shield prevents aggregate from piling up on the belt, being carried ahead of the receiving hopper and being spilled onto the ground. The rubber shield must be inspected to ensure it is not torn or missing.
 +
*Conveyor Belts - check to ensure they are in good condition and not frayed enough to allow aggregate to spill over the sides onto the roadway. Check to ensure belts are tight.  Excessive amount of slack will cause sagging and loss of aggregate off the sides.
 +
*Spreading Hopper - ensure the spreading hopper has no cracks or holes.
 +
*Discharge Gates and Roller - ensure that the discharge gates open and close correctly and that the roller is not warped.
 +
 +
{{top}}
 +
 +
Rollers - the functions of the roller are to:
 +
• Orient the aggregate to their flattest side
 +
• Embed the aggregate into the binder
 +
• Achieve mechanical interlock between the pieces of aggregate.
 +
MDOT requires the use of three rollers on chip seal projects.
 +
Sweeping Equipment - the functions of the sweeping equipment are to:
 +
• Clean the existing roadway of dust and/or foreign materials before chip seal construction
 +
• Removing excess aggregate from constructed chip seals
 +
There are three different types of sweeping equipment typically used in chip seal construction:
 +
1. Rotary Brooms - the commonly used type of broom on chip seal construction projects.  The downward pressure must be kept to a minimum to not dislodge the embedded aggregate.  The brush must be inspected to see that it can be raised/lowered and rotated horizontally.  Rotary brooms do generate dust, which can affect visibility for traffic.
 +
2. Pickup sweepers - generally used wherever dust must be minimized and it is desirable to remove all excess aggregate from the project limits.  A pickup sweeper features a broom that sweeps the aggregate to a suction head that deposits the material in a storage tank. Pickup sweepers are particularly useful in urban areas where aggregate accumulation in gutters or along the edge of the roadway is undesirable.
 +
3. Vacuum sweepers -  equipment that removes the excess aggregate through suction only. The lack of contact with the chip seal’s surface minimizes damage.
 +
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
  

Revision as of 16:02, 26 March 2026


505
Chip seal


GENERAL DESCRIPTION

-Reserved-

[top of page]


Definitions and Terms

-Reserved-

[top of page]


General Overview

Chip sealing is a common preventive maintenance activity across the State of Michigan. It involves spraying asphalt cement on the surface of an existing pavement followed by the application of a cover aggregate. The asphalt cement is emulsified (suspended in water) to allow for it to be applied without the addition of extreme heat. The cover aggregate is typically either naturally occurring gravel or crushed aggregate such as granite, quartzite, or trap rock (basalt), or limestone. Steel blast furnace slag is also used with great success.

[top of page]


Contractor Prequalification

-Reserved-

[top of page]


Code of Federal Regulation (CFR) / FHWA Regulations

-Reserved-

[top of page]


MATERIALS

The two main materials used in chip seal construction are the asphalt binder and the cover aggregate. The asphalt binder is typically an asphalt emulsion. The cover aggregate can be either natural or crushed. Asphalt Binder The most common asphalt binder used for chip seals in Michigan is an asphalt emulsion. MDOT has two Chip Seal Emulsions, CRS2M and CSEA.

[top of page]


Asphalt Emulsion

An asphalt emulsion consists of the following components:

  • Asphalt Cement
  • Water
  • Emulsifying Agent (surfactant)
  • Polymers

An asphalt emulsion is mostly asphalt cement, similar to that used in hot mix asphalt, with added latex or polymers for improved chip seal performance. Water is the second largest component and serves as the medium that suspends and transports asphalt particles. When the asphalt and water separate—changing the emulsion from brown to black—the emulsion is said to have “broken,” so aggregate chips must be applied and rolled quickly. A surfactant allows the asphalt to disperse into droplets by reducing surface tension and gives the emulsion its electrical charge. Because most aggregates in Michigan are negatively charged, cationic emulsions like CRS-2P and CSEA are used. After breaking, the asphalt settles to the pavement while the water rises and evaporates, leaving the asphalt behind.

CSEA vs CRS2M

CSEA is a more durable chip seal emulsion used on MDOT routes with higher volumes and in certain parts of the State. CSEA has higher residual asphalt content and higher toughness/tenacity with a higher elastic recovery which helps with repeated traffic loading. CSEA will contain higher polymer content than CRS-2M. CSEA will have a higher bond strength to the aggregate and will typically allow better results when opening to higher traffic.


[top of page]


Aggregate

Cover Aggregate The cover aggregate must be clean and dust free (≤2% retained on no. 200), uniform in size and hard so that it provides a tight, durable surface able to withstand the abuse of snowplows and vehicles. Aggregates used on MDOT Chip Seals are classified as either 34CS or CS-T. 34CS is a large gradation with some aggregate in the 3/8 with the majority being ¼ inch. CS-T is intended for the top course of double chip seals and has some ¼ inch stones but is mainly retained on the no. 4.


Pictures of Materials

-Reserved-

[top of page]


EQUIPMENT

Asphalt Distributor

Asphalt Distributor - the role of the asphalt distributor is to apply the binder uniformly and in specified quantities. The distributor consists of a truck- or trailer-mounted insulated tank ranging in capacity from 800 to 5,500 gallons (3,000-20,800 liters).

Distributors must be equipped with a heating system that will maintain the binder at the proper spraying temperature and has a system of spray bars with nozzles that apply the binder to the roadway surface. These spray bars cover widths up to 30 feet (10 meters) in one pass.

The major components of a distributor are:

  • Asphalt tank - a distributor can consist of a truck- or trailer-mounted insulated tank ranging in capacity from 800 to 5,500 gallons (3,000-20,800 liters). The tank should also have baffle or surge plates to stabilize the load while in motion.
  • Heating system - the tank should have one or two propane or diesel fired burners that direct heat into flues that pass through the tank. This allows the contents of the tank to be heated to the correct application temperature. A thermometer must be mounted in the side of the tank so that the correct temperature can be observed.
  • Circulating and pumping system - the asphalt pump, radar, control valve and strainer are important parts of the circulating and pumping system. These parts must be checked to ensure they are set properly and there are no leaks.
  • Spray bar and nozzles - ensure that the spray bar is at the correct height and that the proper sized nozzles are installed and at the correct angle.
  • Distributor controls and gauges - the distributor operator must be familar with the following controls and gauges to ensure that a uniform and precise amount of asphalt binder is applied onto the roadway. They include: thermometer, volume gauge, strap stick pump pressure; and the control panel.

Aggregate Spreader - the role of the aggregate spreader is to apply a uniform aggregate cover at a specified rate over the freshly sprayed binder. Aggregate spreaders must be self propelled and have a continuous feed feature. The major components of the aggregate spreader are:

  • Truck Hitch - visual check for anything broken or bent. Ensure the locking mechanism is working properly.
  • Receiving Hopper - the role of the receiving hopper is to receive the aggregate from the haul truck. The receiving hopper must be visually checked for overall condition.
    • There should not be any holes or significant gaps that would allow aggregate to fall through to the road surface;
    • The conveyor belt system should have rubber, neoprene, or fabric cowling around it to prevent aggregate loss; and
    • There must be a flap on top of the receiving hopper to ensure tight fit against haul trucks as aggregate is being dumped into the receiving hopper.
    • A rubber shield prevents aggregate from piling up on the belt, being carried ahead of the receiving hopper and being spilled onto the ground. The rubber shield must be inspected to ensure it is not torn or missing.
  • Conveyor Belts - check to ensure they are in good condition and not frayed enough to allow aggregate to spill over the sides onto the roadway. Check to ensure belts are tight. Excessive amount of slack will cause sagging and loss of aggregate off the sides.
  • Spreading Hopper - ensure the spreading hopper has no cracks or holes.
  • Discharge Gates and Roller - ensure that the discharge gates open and close correctly and that the roller is not warped.

[top of page]


Rollers - the functions of the roller are to: • Orient the aggregate to their flattest side • Embed the aggregate into the binder • Achieve mechanical interlock between the pieces of aggregate. MDOT requires the use of three rollers on chip seal projects. Sweeping Equipment - the functions of the sweeping equipment are to: • Clean the existing roadway of dust and/or foreign materials before chip seal construction • Removing excess aggregate from constructed chip seals There are three different types of sweeping equipment typically used in chip seal construction: 1. Rotary Brooms - the commonly used type of broom on chip seal construction projects. The downward pressure must be kept to a minimum to not dislodge the embedded aggregate. The brush must be inspected to see that it can be raised/lowered and rotated horizontally. Rotary brooms do generate dust, which can affect visibility for traffic. 2. Pickup sweepers - generally used wherever dust must be minimized and it is desirable to remove all excess aggregate from the project limits. A pickup sweeper features a broom that sweeps the aggregate to a suction head that deposits the material in a storage tank. Pickup sweepers are particularly useful in urban areas where aggregate accumulation in gutters or along the edge of the roadway is undesirable. 3. Vacuum sweepers - equipment that removes the excess aggregate through suction only. The lack of contact with the chip seal’s surface minimizes damage.

-Reserved-

[top of page]


Description of Equipment Used

-Reserved-

[top of page]


Equipment Specifications

-Reserved-

[top of page]


Pictures of Equipment

-Reserved-

[top of page]


PRECONSTRUCTION

Submittals and Shop Drawings

 -Reserved- 

[top of page]


Permits

-Reserved-

[top of page]


Qualified Products List (QPL)

-Reserved-

[top of page]


Plant Inspections

-Reserved-

[top of page]


Contractor Submitted Plans/Procedures

-Reserved-

[top of page]


CONSTRUCTION

Construction Requirements/Procedures/Installation Methods

-Reserved-

[top of page]


Safety

-Reserved-

[top of page]


Productivity information/charts

-Reserved-

[top of page]


Items of Note

-Reserved-

[top of page]



Layout / Survey

-Reserved-

[top of page]


INSPECTION & TESTING

Inspection Procedures

-Reserved-

[top of page]


Special Attention Areas

-Reserved-

[top of page]


QA/QC Tests

-Reserved-

[top of page]


Lab Testing / Field Testing

-Reserved-

[top of page]


Rejection/Remedial Actions=

-Reserved-

[top of page]


MEASUREMENT, DOCMENTATION & PAYMENT

Measurement

-Reserved-

[top of page]


Documentation Requirements

-Reserved-

[top of page]


Basis of Payment

-Reserved-

[top of page]


LOCAL AGENCY PROJECTS

Only if applicable

[top of page]


RAIL PROJECTS

Only if applicable


[top of page]




505
Chip seal


GENERAL

-Reserved-

[top of page]


MATERIALS

-Reserved-

[top of page]


CONSTRUCTION

Double Chip Seal Seasonal Limitation

a. From June 1 to August 1 in the Upper Peninsula b. From May 15 to August 15 in the Lower Peninsula north of M-46 c. From May 15 to August 31 in the Lower Peninsula south of M-46

[top of page]


Longitudinal Construction Joints

Longitudinal Construction Joints in Double Chip Seal – Concern has been raised that the double chip seals are filling in centerline corrugations too much. As a result the special provision 20SP505(B) Warranty Work Requirements for Double Chip Seals contains language specifying that the base course of the chip seal will go up to the corrugations but not cover them. The top course will be the only one that will cover the corrugations.

[top of page]


Fog Seals

Chip Seals with Fog Seal - Delay times

As per spec, complete application of the fog seal within 48 hours of the application of chip seal, but not on the same day as the application of chip seal.

Because the fog seal prevents stone loss and also the temporary raised markings have taken a beating (especially on a double chip seal) the first application of pavement markings after a fog seal may be placed the next day.

[top of page]


MEASUREMENT AND PAYMENT

-Reserved-

[top of page]