User contributions
Jump to navigation
Jump to search
- 13:20, 22 May 2013 diff hist +84 N 814 - Paved Ditches Created page with "814 - Paved Ditches * 814.01 - General * 814.02 - Checklist for Inspector's"
- 13:19, 22 May 2013 diff hist +135 N 813 - Slope Protection Created page with "813 - Slope Protection * 813.01 - Precast slope Protection * 813.02 - Concrete Slope Paving and Headers * 813.03 - Riprap"
- 13:18, 22 May 2013 diff hist +78 N 812 - Temporary Traffic Control for Construction Zone Operations Created page with "812 - Temporary Traffic Control for Construction Zone Operations - Reserved -"
- 13:17, 22 May 2013 diff hist +48 N 811 - Permanent Pavement Markings Created page with "811 - Permanent Pavement Markings - Reserved -"
- 13:17, 22 May 2013 diff hist +56 N 810 - Permanent Traffic Signs and Supports Created page with "810 - Permanent Traffic Signs and Supports - Reserved -"
- 13:16, 22 May 2013 diff hist -3 MediaWiki:Sidebar
- 13:10, 22 May 2013 diff hist -35 809 - Field Office
- 13:09, 22 May 2013 diff hist +14 808 - Fencing
- 13:09, 22 May 2013 diff hist +61 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts
- 13:08, 22 May 2013 diff hist +19 806 - Bicycle Paths
- 13:08, 22 May 2013 diff hist +41 N 805 - Hot Mix Asphalt Curb Created page with "805 - Hot Mix Asphalt Curb - Reserved -"
- 13:07, 22 May 2013 diff hist +81 804 - Concrete Barriers and Glare Screens
- 13:06, 22 May 2013 diff hist +17 803 - Concrete Sidewalk, Ramps, and Steps
- 13:06, 22 May 2013 diff hist -24 802 - Concrete Curb, Gutter, and Dividers
- 13:05, 22 May 2013 diff hist +116 N 809 - Field Office Created page with " * 801.01 - General * 801.02 - Materials * 801.03 - Construction * 801.04 - Measurement and Payment"
- 13:05, 22 May 2013 diff hist +116 N 808 - Fencing Created page with " * 801.01 - General * 801.02 - Materials * 801.03 - Construction * 801.04 - Measurement and Payment"
- 13:04, 22 May 2013 diff hist +116 N 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts Created page with " * 801.01 - General * 801.02 - Materials * 801.03 - Construction * 801.04 - Measurement and Payment"
- 13:04, 22 May 2013 diff hist +116 N 806 - Bicycle Paths Created page with " * 801.01 - General * 801.02 - Materials * 801.03 - Construction * 801.04 - Measurement and Payment"
- 13:04, 22 May 2013 diff hist +116 N 804 - Concrete Barriers and Glare Screens Created page with " * 801.01 - General * 801.02 - Materials * 801.03 - Construction * 801.04 - Measurement and Payment"
- 13:04, 22 May 2013 diff hist +116 N 803 - Concrete Sidewalk, Ramps, and Steps Created page with " * 801.01 - General * 801.02 - Materials * 801.03 - Construction * 801.04 - Measurement and Payment"
- 13:03, 22 May 2013 diff hist +158 N 802 - Concrete Curb, Gutter, and Dividers Created page with "802 - Concrete Curb, Gutter, and Dividers * 801.01 - General * 801.02 - Materials * 801.03 - Construction * 801.04 - Measurement and Payment"
- 13:03, 22 May 2013 diff hist +140 N 801 - Concrete Driveways Created page with "801 - Concrete Driveways * 801.01 - General * 801.02 - Materials * 801.03 - Construction * 801.04 - Measurement and Payment"
- 12:00, 22 May 2013 diff hist +499 N 603 - Concrete Pavement Restoration Created page with "603 - Concrete Pavement Restoration * 603.01 - General * 603.02 - Materials * 603.03 - Patch Layout * 603.04 - Removing Old Concrete * 603.05 - Joints * ..."
- 11:56, 22 May 2013 diff hist +518 N 602 - Concrete Pavement Construction Created page with "602 - Concrete Pavement Construction * 602.01 - Instructions to Concrete Mix Oeprations * 602.02 - Concrete Testing PRocedures * [[602.03 - Instructions to Concrete ..."
- 11:48, 22 May 2013 diff hist +164 N 506 - Slurry Seal Created page with "506 - Slurry Seal * 506.01 - Materials * 506.02 - Equipment * 506.03 - Pre-Paving Meeting * 506.04 - Construction * 506.05 - Delayed Acceptance"
- 11:46, 22 May 2013 diff hist +219 502 - HMA Crack Treatment
- 10:49, 22 May 2013 diff hist +437 N 502 - HMA Crack Treatment Created page with "502 - HMA Construction Practices * 501.01 - Materials * 501.02 - Equipment * 501.03 - Surface Preperation * 501.04 - Adjusting Drainage Structures * [[501.05 ..."
- 10:41, 22 May 2013 diff hist +235 N 501 - Plant Produced Hot Mix Asphalt Created page with "501 - HMA Mixtures * 501.01 - Safety * 501.02 - Materials * 501.03 - Hopt Mix Plants * 501.04 - Pre-Production Meeting * 501.05 - Plant Procedures * [[501..."
- 10:37, 22 May 2013 diff hist +56 N 405 - Pump Station Construction Created page with "405 - Pump Station Construction * 405.01 - General"
- 10:37, 22 May 2013 diff hist 0 404 - Underdrain
- 10:37, 22 May 2013 diff hist +93 N 404 - Underdrain Created page with "404 - Underdrain * 404.01 - General * 404.02 - Materials * 404.03 - MEasurement"
- 10:36, 22 May 2013 diff hist +177 N 403 - Drainage Structures Created page with "403 - Drainage Structures * 403.01 - General * 403.02 - Construction Methods * 403.03 - Backfilling Drainage Sturctures * 403.04 - Adjusting Drainage Sturctures"
- 10:35, 22 May 2013 diff hist +292 N 402 - Storm Sewers Created page with "402 - Storm Sewers * 402.01 - General * 402.02 - Materials Inspection * 402.03 - Installation * 402.04 - Backfilling Sewer Pipe * [[402.05 - Inspection After ..."
- 10:33, 22 May 2013 diff hist +229 N 401 - Culverts Created page with "401 - Culverts * 401.01 - General * 401.02 - Materials Inspection * 401.03 - Installation * 401.04 - Backfilling Culverts * [[401.05 - Inspection after Insta..."
- 10:31, 22 May 2013 diff hist +166 N 307 - Aggregate Shoulders and Approaches Created page with "307 - Aggregate Shoulders and Approaches * 307.01 - General * 307.02 - Construction * 307.03 - Measurement and Payment * 307.04 - Weighing Materials"
- 10:30, 22 May 2013 diff hist +54 N 306 - Aggregate Surface Course Created page with "306 - Aggregate Surface Course * 306.01 - General"
- 10:29, 22 May 2013 diff hist +60 N 305 - HMA Base Crushing and Shaping Created page with "305 - HMA Base Crushing and Shaping * 305.01 - General"
- 10:28, 22 May 2013 diff hist +144 N 304 - Rubbilizing Existing PCC Pavement Created page with "304 - Rubbilizing Existing PCC Pavement * 304.01 - Description * 304.02 - Equipment * 304.03 - Materials * 304.04 - Inspection"
- 10:27, 22 May 2013 diff hist +57 N 303 - Open Graded Drainage Course Created page with "303 - Open Graded Drainage Course * 303.01 - General"
- 10:27, 22 May 2013 diff hist +121 N 302 - Aggregate Base Courses Created page with "302 - Aggregate Base Courses * 302.01 - Materials * 302.02 - Construction * 302.03 - Measurement and Payment"
- 10:25, 22 May 2013 diff hist +107 N 301 - Subbase Created page with "301 - Subbase * 301.01 - Materials * 301.02 - Construction * 301.03 - Measurement and Payment"
- 10:21, 22 May 2013 diff hist +45 N 209 - Project Cleanup Created page with "209 - Project Cleanup * 209.01 - General"
- 10:21, 22 May 2013 diff hist +303 N 208 - Soil Erosion and Sedimentation Control (NPDES) Created page with "208 - Soil Erosion and Sedimentation Control (NPDES) * 208.01 - General * 208.02 - Soil Erosion and Sedimentation Control Guidelines * [[208.03 - National Polution D..."
- 10:19, 22 May 2013 diff hist +51 N 207 - Obliterating Roadway Created page with "207 - Obliterating Roadway * 207.01 - General"
- 10:19, 22 May 2013 diff hist +215 N 206 - Excavation and Backfill for Structures Created page with "206 - Excavation and Backfillfor Structures * 206.01 - Preparing Abutment Areas * 206.02 - Backfill for Structures * 206.03 - Excavation for Structures * [[206.0..."
- 10:17, 22 May 2013 diff hist +544 N 205 - Roadway Earthwork Created page with "205 - Roadway Earthwork * 205.01 - Earth Excavation * 205.02 - Preparing Roadway Foundation * 205.03 - Rock Excavation * 205.04 - Blasting * [[205.05 - Subgra..."
- 10:14, 22 May 2013 diff hist +215 N 204 - Removing Miscellaneous Structures and Materials Created page with "Editing 204 - Removing Miscellaneous Structures and Materials * 204.01 - Documentation * 204.02 - Structures * [[204.03 - Hot Mix Asphalt (HMA) Pavements and Drivewa..."
- 10:12, 22 May 2013 diff hist +124 N 203 - Removing Drainage Structures, Culverts, and Sewers Created page with "203 - Removing Drainage Structures, Culverts, and Sewers * 203.01 - Drainage Structures * 203.02 - Culvert of Sewer"
- 10:12, 22 May 2013 diff hist +151 N 202 - Removing Trees, Stumps, and Corduroy Created page with "202 - Removing Trees, Stumps, and Corduroy * 202.01 - Instructions for Removing Trees and Stumps * 202.02 - Instructions for Removing Corduroy"
- 10:11, 22 May 2013 diff hist +38 N 201 - Clearing Created page with "201 - Clearing * 201.01 - General"