All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 08:33, 23 May 2014 User account JestineKnoll talk contribs was created
- 05:46, 23 May 2014 User account JeanneWMTW talk contribs was created
- 05:05, 23 May 2014 User account LatriceClowers talk contribs was created
- 04:26, 23 May 2014 User account KimberAcker talk contribs was created
- 04:09, 23 May 2014 User account NadiaB87hk talk contribs was created
- 04:01, 23 May 2014 User account JarredHenslowe talk contribs was created
- 03:58, 23 May 2014 User account ChristeKinard talk contribs was created
- 01:49, 23 May 2014 User account Leigh69Byau talk contribs was created
- 01:38, 23 May 2014 User account GilbertJeppesen talk contribs was created
- 01:18, 23 May 2014 User account GregJagerousf talk contribs was created
- 00:52, 23 May 2014 User account AdolfoN37i talk contribs was created
- 23:26, 22 May 2014 User account JuniorSurratt talk contribs was created
- 23:02, 22 May 2014 User account Eugene94Hki talk contribs was created
- 22:52, 22 May 2014 User account CoryKeesler talk contribs was created
- 22:48, 22 May 2014 User account SusanneLamothe talk contribs was created
- 22:36, 22 May 2014 User account ColetteGAD talk contribs was created
- 21:23, 22 May 2014 User account Gretta7561 talk contribs was created
- 20:53, 22 May 2014 User account Louann06Onvlt talk contribs was created
- 19:23, 22 May 2014 User account KelleeQuam talk contribs was created
- 18:32, 22 May 2014 User account WilbertGodson talk contribs was created
- 00:28, 22 May 2014 User account MaricruBarksdal talk contribs was created
- 21:55, 21 May 2014 User account JanetteWhish talk contribs was created
- 19:11, 21 May 2014 User account ChristoDJNE talk contribs was created
- 16:04, 21 May 2014 Greenes2 talk contribs deleted page 110 - Programs Not Covered by Standard Specifications (Author request: content was: "110 - Programs not Covered by Standard Specification * 110.01 - Engineer Certification Program * 110.02 - Railroad Highway Projects * 110.03 - Delay of Project Due to Utility Conflict * [[110.04 - Final Financ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 204.04 - Demolition Contracts (Author request: content was: "===Demolition Contracts=== There is no reference to this work in the Standard Specifications for Construction. Requirements for demolition work are usually detailed in contracts prepared by the Real Estate Support Area. ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 502.03 - Surface Preperation (Author request: content was: "502 - HMA Construction Practices ==502.03 - SURFACE PREPARATION== ===502.03.1 Aggregate Base=== The ride quality of the surface depends, to a great degree, upon the conditioning and preparation of the aggregate ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 102.03 - Progress Clause (Author request: content was: "102 - PreConstruction Administration '''102.03 - PROGRESS CLAUSE''' The Engineer is responsible for providing the Progress Clause at the OEC meeting. The Progress Clause is an important part of the bidding proposal ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.04 - Final Financial Process (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.06 - FINAL FINANCIAL PROCESS''' After concurrence with the audit report is obtained, and if nec..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.03 - Delay of Project Due to Utility Conflict (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.03 - DELAY OF PROJECT DUE TO A UTILITY CONFLICT''' '''110.03.1 General Information''' When ..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.02 - Railroad Highway Projects (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.02 - RAILROAD HIGHWAY PROJECTS''' Safety deficiencies, evaluation of crossing/separation condit..." (and the only contributor was "[[Special:Contributions/...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 110.01 - Engineer Certification Program (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.01 - ENGINEER CERTIFICATION PROGRAM''' In order to be eligible for certification, the following criteria must be met: * Recommendation for certification b...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 109.09 - Final Estimate Review (Author request: content was: "109 - Measurement and Payment '''109.09 - FINAL ESTIMATE REVIEW''' When the Engineer has determined the final quantities of all pay items, the Region office should be advised that the project is ready for a final est...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.08 - Documents Necessary for Final Payment (Author request: content was: "109 - Measurement and Payment '''109.08 - DOCUMENTS NECESSARY FOR FINAL PAYMENT''' After review by the Region, forms and documents necessary for payment of the final estimate should be submitted as shown below. {| c...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.07 - Final Marked Plans (Author request: content was: "109 - Measurement and Payment '''109.07 - FINAL MARKED PLANS''' Marked plans showing "as constructed" changes should be submitted to the Lansing Design Support Area upon completion of a project. This information is ...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.06 - Final Estimates (Copyright violation: content was: "109 - Measurement and Payment '''109.06 - FINAL ESTIMATES''' The following procedure for processing final estimates will expedite the finalizing of projects and final payment to the Contractor for completed work...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.05 - Overruns (Author request: content was: "109 - Measurement and Payment '''109.05 - OVERRUNS''' '''109.05.1 Overrun Letters''' Overrun letters are usually prepared in Lansing by the Contract Administration Engineer. Overrun letters follow the same proce...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.04 - Reduction in Reserve (Author request: content was: "109 - Measurement and Payment '''109.04 - REDUCTION IN RESERVE''' The computer is programmed to reduce the reserve to 2 percent automatically upon payment of 90 percent of the contract amount. At that time, the cont...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.03 - Acceptance of Work (Author request: content was: "109 - Measurement and Payment '''109.03 - ACCEPTANCE OF WORK''' When the project is substantially completed, a post construction inspection of the project should be performed by the Engineer and senior technician. T...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.02 - Force Account Checklist (Author request: content was: "109 - Measurement and Payment '''109.02 - FORCE ACCOUNT CHECKLIST''' This checklist provides an overview of the documentation required for force account work. More detailed descriptions are provided on the following...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.01 - Force Account Work (Author request: content was: "109 - Measurement and Payment '''109.01 - FORCE ACCOUNT WORK''' Force account basis for payment should be used in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/109%20Measurement%20&...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.04 - Guidelines for Assessing Liquidated Damages (Author request: content was: "108 - Prosecution and Progress '''108.04 - GUIDELINES FOR ASSESSING LIQUIDATED DAMAGES''' The Contract Modifications, Form 1100, which follow or accompany the request for extension of contract time, should merely rev...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.03 - Extension of Time and Liquidated Damages (Author request: content was: "108 - Prosecution and Progress '''108.03 - EXTENSION OF TIME AND LIQUIDATED DAMAGES''' Conditions for granting additional time are discussed in subsections [http://mdotcf.state.mi.us/public/specbook/files/2012/108%20...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.02 - Biweekly Construction Progress Report (Author request: content was: "108 - Prosecution and Progress '''108.02 - BIWEEKLY CONSTRUCTION PROGRESS REPORT''' The ''Biweekly Construction Progress Report, Form 1102A'', is used to record progress of the work on a project. Its purpose is to a...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.01 - Payment for Delivered Materials (Author request: content was: "108 - Prosecution and Progress '''108.01 - PAYMENT FOR DELIVERED MATERIALS''' Materials specifically produced or purchased for the project and stockpiled for use on the project may be paid for on the biweekly/weekly ...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 105.04 - Statement of Material & Labor Used (Author request: content was: "105 - Control of Materials '''105.04 - STATEMENT OF MATERIALS AND LABOR USED''' The Statement of Materials and Labor Used, FHWA-47 report, is used to document total quantities and cost of all materials and supplies p...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.03 - Monthly Report on Material Inspection (Author request: content was: "105 - Control of Materials '''105.03 - MONTHLY REPORT ON MATERIAL INSPECTION''' VISUAL INSPECTION - All materials should be visually inspected (VI) prior to incorporation into the project. Materials may be accepted ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.02 - Transfer of Tested Materials (Author request: content was: "105 - Control of Materials '''105.02 - TRANSFER OF TESTED MATERIAL''' When transferring construction materials which were tested and accepted for a specific project but are to be used on another project, it is not ne...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.01 - General Information (Author request: content was: "105 - Control of Materials '''105.01 - GENERAL INFORMATION''' All materials incorporated into the project must be tested by MDOT, certified by the manufacturer as meeting the applicable specifications, selected from ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.12 - Supplies and Equipment Paint Colors (Author request: content was: "104 - Construction Surveying '''104.12 - SUPPLIES AND EQUIPMENT PAINT COLORS''' When painting removal items, grades, witness stakes, etc., only certain colors are to be used. The color that has been set aside for su...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.11 - Consultant/Contractor Staking Quality Assurance Guidelines (Author request: content was: "104 - Construction Surveying '''104.11 - CONSULTANT/CONTRACTOR STAKING QUALITY ASSURANCE GUIDELINES''' The number of checks noted below are considered to be the minimum to be taken over the life of the project. When...)