Search results

Jump to navigation Jump to search
  • ...gh the Construction Operations Engineer in the Construction Field Services Division. The VEDT membership will consist of the following individuals (or their de ::e. Administrator of the Development Services Division (if a local agency project)
    9 KB (1,297 words) - 14:57, 11 October 2022
  • * Depth - Taken after final trimming to the nearest 1/4 inch (6 mm), at a minimum of 400 linear feet (120 m) of traffic lane width ...n thickness will be considered as plan thickness. Depths greater than 1-3/4 inches(45 mm) deficiency will not be used for averaging. To be within spec
    6 KB (873 words) - 14:24, 16 February 2022
  • ...re, the thickness of the HMA pavement after cold-milling should range from 4 inches to 5 inches (100 mm to 125 mm). [[Category:Division 3]]
    4 KB (552 words) - 16:44, 12 January 2022
  • 4-1/2 percent air content permitted for slumps under 1.5 inches (37 mm). Che ...own on Standard Plan R-49 Series. Check depth of plane-of-weakness joint (4 inches (100 mm) required to control cracking). These joints may be formed
    6 KB (929 words) - 11:50, 19 January 2022
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    69 KB (8,953 words) - 15:17, 22 May 2024
  • ...s/construction/index.php/E-Construction#e-Construction.2FPaper_File_System Division 1 e-construction tables]. The element sequence and general format are as * Control+F can be used to search all 4 tables
    57 KB (6,792 words) - 16:49, 22 May 2024
  • Face forms are supported from the back form by use of division plates. See '''''Figure 802-3'''''. In addition to supporting the face fo [[File:Figure 802-3.JPG|center|thumb|600px|Figure 802-3 - Curb and Gutter Division Plates]]
    12 KB (1,916 words) - 11:49, 19 January 2022
  • ...reported. Timber is not required to be cut in lengths less than 8 feet (2.4 m). Any discussion with adjacent property owners should be reported. Type II - Stumps will be chipped or ground down to an elevation approximately 4 inches (100 mm) below the proposed ground level.
    8 KB (1,133 words) - 12:01, 28 March 2023
  • :4. Major Subcontractors^^ [[Category:Division 1]]
    7 KB (1,055 words) - 11:29, 14 July 2020
  • <center>4</center> [[Category: Division 8]]
    6 KB (797 words) - 17:08, 27 March 2023
  • ...surface is finished with a wood float and all edges are finished with a 1/4 inch (6 mm) radius. Curing compound is applied at a rate of 1 gallon per 2 [[Category: Division 8]]
    4 KB (644 words) - 17:17, 19 September 2023
  • ...ons-Construction.pdf?rev=df6ed714e5bb43b6814fb252b1ed2561#page=208 Section 4] of the Standard Specifications for Construction. [[Category:Division 3]]
    5 KB (803 words) - 11:16, 21 July 2022
  • !Updated!! Division !! Section !! Summary !! What Changed |<center>4/28/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engi
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...perations Environmental Engineer or the Supervising Engineer of the Design Division’s Utilities Drainage and Roadsides Section. ...receipt of the claim in accordance with the Act (ref: MCL 691.1416 Sec 19(4)). It is not necessary to wait until an actual claim is received to make t
    20 KB (3,034 words) - 15:47, 19 January 2022
  • [[Category:Division 4]]
    6 KB (843 words) - 17:47, 12 January 2022
  • ...red polyethylene mesh, with 2 inch (50 mm) diamond-shaped openings, and is 4 feet (1.2 m) in height. Installation, maintenance and removal requirements [[Category: Division 8]]
    6 KB (864 words) - 12:42, 19 January 2022
  • ...ned and field coated with a similar three-coat system, referred to as Type 4. The following guidelines should be strictly followed in inspecting these The Construction Field Services Division (CFS) maintains a recommended procedure guide for damaged coating repair th
    33 KB (4,797 words) - 11:46, 25 April 2023
  • [[Category:Division 4]]
    7 KB (999 words) - 17:47, 12 January 2022
  • ...oil, peat or muck, should be covered with a layer of topsoil approximately 4 inches (100 mm) thick, or as otherwise shown. After the spreading operatio ...side turf due to their high maintenance requirements. Remember that the 3/4 inch (20 mm) soil thickness and soil type must also apply to nursery grown
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the | [//{{SERVERNAME}}/images_construction/4/43/Procedures_for_e_Construction_Documents.pdf Procedure for E-construction
    12 KB (1,824 words) - 16:49, 18 April 2024

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)