Uploads by Greenes2
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
13:27, 1 May 2014 | Fig707.1-2.png (file) | 255 KB | Figure 707.1-2 Shop Drawing Review Process | 1 | |
13:24, 1 May 2014 | Fig707.1-1.png (file) | 223 KB | Figure 707.1-1 – Shop Drawing Review Process | 1 | |
11:18, 1 May 2014 | Fig604-03.png (file) | 37 KB | Figure 604-3: Quality Assurance Mix Design Review | 1 | |
11:11, 1 May 2014 | Fig604-02.png (file) | 64 KB | MDOT Checklist For Concrete Paving With Warranty | 1 | |
12:22, 29 April 2014 | Table603-01.png (file) | 26 KB | Table 1: Modulus of Rupture Factors (F) | 1 | |
12:17, 29 April 2014 | EQ 603-02.png (file) | 2 KB | Simplified Center Point Flexural Strength Equation | 1 | |
12:15, 29 April 2014 | FIG603-01.png (file) | 10 KB | Beam Measurements | 1 | |
12:11, 29 April 2014 | EQ603-01.png (file) | 1 KB | Flexural Strength of Concrete (Using Simple Beam With Center Point Loading): | 1 | |
08:17, 29 April 2014 | %Ret Table Check 4-24-13.xls (file) | 132 KB | Percent Retained Table Check 04-24-13 | 1 | |
08:15, 29 April 2014 | Concrete JMF Yield Calculator.v3.4-17-13.xls (file) | 30 KB | Concrete JMF Yield Calculator v3 04-17-13 | 1 | |
08:21, 9 April 2014 | Fig717-01.png (file) | 154 KB | Drain Casting Assembly Details from Standard Plan Series B101 | 1 | |
08:20, 9 April 2014 | Fig711-07.png (file) | 110 KB | Bridge Barrier Railing, Aesthetic Parapet Tube | 1 | |
08:19, 9 April 2014 | Fig711-06.png (file) | 28 KB | Bridge Barrier Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Railing) | 1 | |
08:18, 9 April 2014 | Fig711-05.png (file) | 17 KB | Bridge Barrier Railing, Thrie Beam REtorfit (R4 Type Bridge Railing) | 1 | |
08:17, 9 April 2014 | Fig711-04.png (file) | 41 KB | Bridge Barrier Railing, 4 Tube | 1 | |
08:16, 9 April 2014 | Fig711-03.png (file) | 52 KB | Bridge Barrier Railing, 2 Tube | 1 | |
08:16, 9 April 2014 | Fig711-02.png (file) | 28 KB | Bridge Barrier Railing Type 5 | 1 | |
08:15, 9 April 2014 | Fig711-01.png (file) | 30 KB | Bridge Barrier Railing Type 4 | 1 | |
08:14, 9 April 2014 | Fig709-05.png (file) | 161 KB | Table 912-10 Preservation retention requirements. MDOT 2012 Standard Specifications for Construction. | 1 | |
08:12, 9 April 2014 | Fig709-04.png (file) | 23 KB | Inspection Stamp for Glulam Lumber | 1 | |
08:11, 9 April 2014 | Fig709-03.png (file) | 518 KB | Stress laminated deck system showing typical components. USDA-FPL-GTR-125 | 1 | |
08:06, 9 April 2014 | Fig709-02.png (file) | 19 KB | Typical Lumber Grading Marks | 1 | |
08:06, 9 April 2014 | Fig709-01.png (file) | 40 KB | Timber and Lumber Terminology | 1 | |
16:58, 7 April 2014 | Letter - Procedures for Review of Contractor Claims.png (file) | 76 KB | Letter-Procedures for Review of Contractor Claims | 1 | |
16:57, 7 April 2014 | IM11-07 CPF.png (file) | 59 KB | Claims Process Flow Chart | 1 | |
14:24, 19 March 2014 | Flowchart 602-09.png (file) | 41 KB | Figure 602-9 Pavement Coring for Acceptance Flow Chart | 1 | |
14:12, 19 March 2014 | Table 602 % increase strength.png (file) | 27 KB | Table 602 % increase strength.png | 1 | |
13:37, 19 March 2014 | Fig 602-08.png (file) | 33 KB | Figure 602-8 Header Board Placement | 1 | |
13:36, 19 March 2014 | Fig 602-07.png (file) | 40 KB | Figure 602-7 Transverse Expansion Joints | 1 | |
13:36, 19 March 2014 | Fig 602-06.png (file) | 47 KB | Figure 602-6 Basket Pin and Basket Level | 1 | |
13:35, 19 March 2014 | Fig 602-05.png (file) | 39 KB | Figure 602-5 Positioning Dowel Basket Assemblies | 1 | |
09:56, 19 March 2014 | Fig 718-9.png (file) | 249 KB | Figure 9. Improper concrete placement | 1 | |
09:56, 19 March 2014 | Fig 718-8.png (file) | 298 KB | Figure 8. Rebar cage being lowered into complete shaft | 1 | |
09:55, 19 March 2014 | Fig 718-7.png (file) | 150 KB | Figure 7. Rebar cage spacers | 1 | |
09:55, 19 March 2014 | Fig 718-6.png (file) | 59 KB | Figure 6. Soft rock core barrel | 1 | |
09:55, 19 March 2014 | Fig 718-5.png (file) | 76 KB | Figure 5. Muck bucket bottom | 1 | |
09:54, 19 March 2014 | Fig 718-4.png (file) | 124 KB | Figure 4. Muck bucket | 1 | |
09:54, 19 March 2014 | Fig 718-3.png (file) | 98 KB | Figure 3. Single flight rock auger | 1 | |
09:54, 19 March 2014 | Fig 718-2.png (file) | 270 KB | Figure 2. Double flight earth auger | 1 | |
09:53, 19 March 2014 | Fig 718-1.png (file) | 189 KB | Figure 1. Typical drill rig set up | 1 | |
14:00, 18 March 2014 | 103 Figure 1.jpg (file) | 56 KB | Figure 1 – Approval Thresholds for contract revisions | 1 | |
12:16, 3 February 2014 | Fig 705-6.png (file) | 56 KB | Figure 6. Typical conical pile pile points | 1 | |
12:16, 3 February 2014 | Fig 705-5.png (file) | 21 KB | Figure 5. Typical HP section pile points | 1 | |
12:16, 3 February 2014 | Fig 705-4.png (file) | 77 KB | Figure 4. Typical helmet and cushion configuration | 1 | |
12:15, 3 February 2014 | Fig 705-3.png (file) | 30 KB | Figure 3. Typical nylon hammer cushions | 1 | |
12:15, 3 February 2014 | Fig 705-2.png (file) | 22 KB | Figure 2. Typical pile driving equipment set up | 1 | |
12:14, 3 February 2014 | Fig 705-1.png (file) | 8 KB | Figure 1. Typical HP shape | 1 | |
16:30, 29 January 2014 | Fig 704-8.png (file) | 1.21 MB | Figure 704-8: Typical cofferdam bracing with walers and struts | 1 | |
12:39, 29 January 2014 | 714 Fig 5.png (file) | 902 KB | Figure 5. ASTM A6 permitted variations in sectional dimensions | 1 | |
12:21, 29 January 2014 | 714 Fig 7.png (file) | 586 KB | Figure 7. Proper vibrating techniques in deep forms | 1 |