New CM Format Code
-Reserved-
GENERAL DESCRIPTION
-Reserved-
Definitions and Terms
General Overview
Contractor Prequalification
Code of Federal Regulation (CFR) / FHWA Regulations
MATERIALS
Description of Materials Used
Pictures of Materials
EQUIPMENT
Description of Equipment Used
Equipment Specifications
Pictures of Equipment
PRECONSTRUCTION
Submittals and Shop Drawings
Permits
Qualified Products List (QPL)
Plant Inspections
Contractor Submitted Plans/Procedures
CONSTRUCTION
Construction Requirements/Procedures/Installation Methods
Safety
Productivity information/charts
Items of Note
Layout / Survey
INSPECTION & TESTING
Inspection Procedures
Special Attention Areas
QA/QC Tests
Lab Testing / Field Testing
Rejection/Remedial Actions=