General Overview

Chip sealing is a common preventive maintenance activity across the State of Michigan. It involves spraying asphalt cement on the surface of an existing pavement followed by the application of a cover aggregate. The asphalt cement is emulsified (suspended in water) to allow for it to be applied without the addition of extreme heat. The cover aggregate is typically either naturally occurring gravel or crushed aggregate such as granite, quartzite, or trap rock (basalt), or limestone. Steel blast furnace slag is also used with great success.

[top of page]


Contractor Prequalification

-Reserved-

[top of page]


Code of Federal Regulation (CFR) / FHWA Regulations

-Reserved-

[top of page]


MATERIALS

-Reserved-

[top of page]


Description of Materials Used

-Reserved-

[top of page]


Pictures of Materials

-Reserved-

[top of page]


EQUIPMENT

-Reserved-

[top of page]


Description of Equipment Used

-Reserved-

[top of page]


Equipment Specifications

-Reserved-

[top of page]


Pictures of Equipment

-Reserved-

[top of page]


PRECONSTRUCTION

Submittals and Shop Drawings

 -Reserved- 

[top of page]


Permits

-Reserved-

[top of page]


Qualified Products List (QPL)

-Reserved-

[top of page]


Plant Inspections

-Reserved-

[top of page]


Contractor Submitted Plans/Procedures

-Reserved-

[top of page]


CONSTRUCTION

Construction Requirements/Procedures/Installation Methods

-Reserved-

[top of page]


Safety

-Reserved-

[top of page]


Productivity information/charts

-Reserved-

[top of page]


Items of Note

-Reserved-

[top of page]



Layout / Survey

-Reserved-

[top of page]


INSPECTION & TESTING

Inspection Procedures

-Reserved-

[top of page]


Special Attention Areas

-Reserved-

[top of page]


QA/QC Tests

-Reserved-

[top of page]


Lab Testing / Field Testing

-Reserved-

[top of page]


Rejection/Remedial Actions=

-Reserved-

[top of page]


MEASUREMENT, DOCMENTATION & PAYMENT

Measurement

-Reserved-

[top of page]


Documentation Requirements

-Reserved-

[top of page]


Basis of Payment

-Reserved-

[top of page]


LOCAL AGENCY PROJECTS

Only if applicable

[top of page]


RAIL PROJECTS

Only if applicable


[top of page]




505
Chip seal


GENERAL

-Reserved-

[top of page]


MATERIALS

-Reserved-

[top of page]


CONSTRUCTION

Double Chip Seal Seasonal Limitation

a. From June 1 to August 1 in the Upper Peninsula b. From May 15 to August 15 in the Lower Peninsula north of M-46 c. From May 15 to August 31 in the Lower Peninsula south of M-46

[top of page]


Longitudinal Construction Joints

Longitudinal Construction Joints in Double Chip Seal – Concern has been raised that the double chip seals are filling in centerline corrugations too much. As a result the special provision 20SP505(B) Warranty Work Requirements for Double Chip Seals contains language specifying that the base course of the chip seal will go up to the corrugations but not cover them. The top course will be the only one that will cover the corrugations.

[top of page]


Fog Seals

Chip Seals with Fog Seal - Delay times

As per spec, complete application of the fog seal within 48 hours of the application of chip seal, but not on the same day as the application of chip seal.

Because the fog seal prevents stone loss and also the temporary raised markings have taken a beating (especially on a double chip seal) the first application of pavement markings after a fog seal may be placed the next day.