Difference between revisions of "819 - Electrical and Lighting"
Jump to navigation
Jump to search
819
Electrical and Lighting
m |
|||
(10 intermediate revisions by 4 users not shown) | |||
Line 4: | Line 4: | ||
<center><span STYLE="font: 40pt arial;">'''Electrical and Lighting'''</span></center> | <center><span STYLE="font: 40pt arial;">'''Electrical and Lighting'''</span></center> | ||
− | |||
+ | ==[[#GENERAL DESCRIPTION|'''GENERAL DESCRIPTION''']]== | ||
− | |||
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
Line 13: | Line 12: | ||
{{top}} | {{top}} | ||
− | ==MATERIALS== | + | |
+ | ==[[#MATERIALS|'''MATERIALS''']]== | ||
+ | |||
+ | ===[[#Electrical and Lighting Conduit|Electrical and Lighting Conduit]]=== | ||
+ | |||
+ | Labeled conduit is defined as having the certification mark (as shown on the following NRTL website for each laboratory) of the testing laboratory printed, stamped or otherwise physically on the conduit. The NRTLs can be found at the following website: | ||
+ | |||
+ | ::https://www.osha.gov/dts/otpca/nrtl/nrtllist.html | ||
+ | |||
+ | |||
+ | |||
+ | {{top}} | ||
+ | ==[[#EQUIPMENT|'''EQUIPMENT''']]== | ||
+ | <span style="color: red"> -Reserved- </span> | ||
+ | |||
+ | {{top}} | ||
+ | |||
+ | ==[[#PRECONSTRUCTION|'''PRECONSTRUCTION''']]== | ||
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
Line 19: | Line 35: | ||
{{top}} | {{top}} | ||
− | ==CONSTRUCTION== | + | |
+ | ==[[#CONSTRUCTION|'''CONSTRUCTION''']]== | ||
+ | |||
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
Line 25: | Line 43: | ||
{{top}} | {{top}} | ||
− | ==MEASUREMENT | + | ==[[#INSPECTION & TESTING|'''INSPECTION & TESTING''']]== |
+ | |||
+ | ===Initial Inspection=== | ||
+ | |||
+ | This inspection should be performed shortly after an asset is constructed. Please reference [https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports#INSPECTION_.26_TESTING Section 810] for initial asset inspection procedures of frangible light pole structures, non-frangible light pole structures, and tower lighting structures. | ||
+ | |||
+ | {{top}} | ||
+ | |||
+ | ==[[#MEASUREMENT, DOCMENTATION & PAYMENT|'''MEASUREMENT, DOCMENTATION & PAYMENT''']]== | ||
+ | |||
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
{{top}} | {{top}} | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | [[Category:Construction Manual]] | ||
+ | [[Category: Division 8]] | ||
+ | [[Category: Section 819]] | ||
+ | [[Category:New CM Format]] |
Latest revision as of 15:46, 2 April 2024
GENERAL DESCRIPTION
-Reserved-
MATERIALS
Electrical and Lighting Conduit
Labeled conduit is defined as having the certification mark (as shown on the following NRTL website for each laboratory) of the testing laboratory printed, stamped or otherwise physically on the conduit. The NRTLs can be found at the following website:
EQUIPMENT
-Reserved-
PRECONSTRUCTION
-Reserved-
CONSTRUCTION
-Reserved-
INSPECTION & TESTING
Initial Inspection
This inspection should be performed shortly after an asset is constructed. Please reference Section 810 for initial asset inspection procedures of frangible light pole structures, non-frangible light pole structures, and tower lighting structures.
MEASUREMENT, DOCMENTATION & PAYMENT
-Reserved-