Difference between revisions of "824 - Contractor Staking"
Jump to navigation
Jump to search
824
Contractor Staking
m (→CONSTRUCTION: Added subheading "Use of Automated Machine Guidance (AMG)" along with content and attachments as a part of CMU 2016-001) |
m (Removed 2012 Spec Book tagline link) |
||
(One intermediate revision by the same user not shown) | |||
Line 4: | Line 4: | ||
<center><span STYLE="font: 40pt arial;">'''Contractor Staking'''</span></center> | <center><span STYLE="font: 40pt arial;">'''Contractor Staking'''</span></center> | ||
− | |||
Line 41: | Line 40: | ||
[[Category:Construction Manual]] | [[Category:Construction Manual]] | ||
+ | [[Category: Division 8]] | ||
+ | [[Category: Section 824]] |
Latest revision as of 12:47, 19 January 2022
GENERAL
-Reserved-
MATERIALS
-Reserved-
CONSTRUCTION
Use of Automated Machine Guidance (AMG)
The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process.
MEASUREMENT AND PAYMENT
-Reserved-