Difference between revisions of "Frequently Searched Items"
Jump to navigation
Jump to search
(13 intermediate revisions by the same user not shown) | |||
Line 21: | Line 21: | ||
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates] | :[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates] | ||
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#e-Final_Project_Review_Procedures Final Project Review Procedures] | :[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#e-Final_Project_Review_Procedures Final Project Review Procedures] | ||
+ | |||
+ | |||
+ | |||
+ | {{top}} | ||
+ | [[Category:Construction Manual]] | ||
+ | [[Category: Division 1 Supplemental]] |
Latest revision as of 08:52, 8 May 2024
- Contract Modification and FHWA limits
- MDOT 2020 Standard Specifications Construction
- Mdot forms search
- MDOT Standard Naming Convention
- MDOT Average unit prices
- MDOT Design Estimating Average Unit Price
- Construction Contractor Inquiries for letting dates, item numbers, status
- Frequently used special provisions
- MDOT Standard plans
- MMUTCD chapter 6
- Traffic Sign Details
- E proposal to find plans, proposals for jobs that are let
- Bid tabs from lettings
- Material source guide
- Check for latest MDOT Form updates
- 105.10 Buy America
- HMA Inspector’s Daily report requirements
- Documentation Guide
- Contractor Performance Evaluations procedures
- Prevailing Wage
- Final Estimates
- Final Project Review Procedures