Search results
Jump to navigation
Jump to search
- <center><span STYLE="font: 60pt arial;">'''202'''</span></center> [[Category: Section 202]]2 KB (326 words) - 11:40, 23 October 2024
- ...ontacting the Construction Field Services Prompt Payment Specialist at 517-202-3716. [[Category:Section 109]]3 KB (367 words) - 11:03, 25 April 2023
- Calibrate the hydrodemolition equipment as listed in Section 712 of the Construction Manual. Record the settings (water pressure, cuttin ...r’s repair of epoxy coating using a patching/repair material selected from Section 905.03.C, Bar Reinforcement (Epoxy Coating) of the Qualified Products List.10 KB (1,463 words) - 14:52, 13 August 2024
- ...ing all testing, inspection, and recording on the forms listed below. See Section 706 of the Standard Specifications for Construction and the contract docume ...um spacing along the transverse and longitudinal construction joints. See Section 707 of the Standard Specifications of Construction regarding field welding23 KB (3,516 words) - 11:33, 23 October 2024