Search results

Jump to navigation Jump to search
  • ...on/index.php?title=205_-_Roadway_Earthwork#Borrow.2FUse_of_Excess_Property 205 - Roadway Earthwork - Borrow] [[category:Section 105]]
    289 bytes (38 words) - 16:44, 22 August 2024
  • ...y associated with construction earthwork projects. There is no comparable section of the standard specifications at this time. ...erty as a Contractor's yard. Item 12 in the Borrow/Use of Excess Property Section of this manual emphasizes the need for an end date for the use of the prope
    9 KB (1,344 words) - 10:51, 16 May 2024
  • ...d Construction Manual Updates (CMU). The link under “Current Content Area/Section” shows the existing construction manual language and the link under “Pr !Date !! Current Content Area/Section !! Proposed Update !! Comments Due !! Status
    28 KB (3,726 words) - 16:02, 8 March 2023
  • <center><span STYLE="font: 60pt arial;">'''205'''</span></center> ...dotcf.state.mi.us/public/specbook/files/2012/205%20Roadway%20Earthwork.pdf 205.03] of the Standard Specifications for Construction (Disposing of Surplus a
    78 KB (12,242 words) - 14:03, 13 November 2024
  • !Updated!! Division !! Section !! Summary !! What Changed ...d_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated section 501 to include the [[501_-_Plant_Produced_Hot_Mix_Asphalt#HMA_Paving_Operat
    88 KB (11,385 words) - 14:37, 20 May 2025
  • ...d storage tank (UST) removal contract that has been established. Refer to Section 210, of this manual, under UST Removal Contracts, for procedures to be foll '''CONTROL SECTION NO.'''
    8 KB (1,178 words) - 16:07, 10 June 2025
  • ...ubgrades uniformity and stability. Refer to MDOT Wiki Division 2 - Section 205 for the procedure of test-rolling. Once weak areas are identified, the geo During final finishing operations. The previously removed 4-inch end section of the expansion filler material should be replaced and the concrete consol
    87 KB (13,994 words) - 12:14, 23 October 2024