Search results
Jump to navigation
Jump to search
- ...on/index.php?title=205_-_Roadway_Earthwork#Borrow.2FUse_of_Excess_Property 205 - Roadway Earthwork - Borrow] [[category:Section 105]]289 bytes (38 words) - 16:44, 22 August 2024
- ...y associated with construction earthwork projects. There is no comparable section of the standard specifications at this time. ...erty as a Contractor's yard. Item 12 in the Borrow/Use of Excess Property Section of this manual emphasizes the need for an end date for the use of the prope9 KB (1,344 words) - 10:51, 16 May 2024
- ...d Construction Manual Updates (CMU). The link under “Current Content Area/Section” shows the existing construction manual language and the link under “Pr !Date !! Current Content Area/Section !! Proposed Update !! Comments Due !! Status28 KB (3,726 words) - 16:02, 8 March 2023
- <center><span STYLE="font: 60pt arial;">'''205'''</span></center> ...dotcf.state.mi.us/public/specbook/files/2012/205%20Roadway%20Earthwork.pdf 205.03] of the Standard Specifications for Construction (Disposing of Surplus a78 KB (12,242 words) - 14:03, 13 November 2024
- !Updated!! Division !! Section !! Summary !! What Changed ...d_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated section 501 to include the [[501_-_Plant_Produced_Hot_Mix_Asphalt#HMA_Paving_Operat88 KB (11,385 words) - 14:37, 20 May 2025
- ...d storage tank (UST) removal contract that has been established. Refer to Section 210, of this manual, under UST Removal Contracts, for procedures to be foll '''CONTROL SECTION NO.'''8 KB (1,178 words) - 16:07, 10 June 2025
- ...ubgrades uniformity and stability. Refer to MDOT Wiki Division 2 - Section 205 for the procedure of test-rolling. Once weak areas are identified, the geo During final finishing operations. The previously removed 4-inch end section of the expansion filler material should be replaced and the concrete consol87 KB (13,994 words) - 12:14, 23 October 2024