Search results

Jump to navigation Jump to search
  • <center><span STYLE="font: 60pt arial;">'''305'''</span></center> ...generation of material. If additional material is required to obtain the section required, make sure that a well graded homogeneous material results.
    4 KB (552 words) - 16:44, 12 January 2022
  • !Updated!! Division !! Section !! Summary !! What Changed ...d_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated section 501 to include the [[501_-_Plant_Produced_Hot_Mix_Asphalt#HMA_Paving_Operat
    88 KB (11,385 words) - 14:37, 20 May 2025
  • ...he pavement surface, in one or more passes, to the required grade or cross section. ..., dried-out surfaces must be re-compacted and restored to the proper cross section. Saturated areas must be allowed to dry prior to placing mixture. The agg
    130 KB (20,400 words) - 11:43, 1 April 2025