User contributions
Jump to navigation
Jump to search
- 10:53, 19 March 2014 diff hist 0 718 - Drilled Shafts →POST CONSTRUCTION INTEGRITY TESTING
- 10:52, 19 March 2014 diff hist +22 718 - Drilled Shafts →Placing Concrete
- 10:52, 19 March 2014 diff hist +31 718 - Drilled Shafts →POST CONSTRUCTION INTEGRITY TESTING
- 10:33, 19 March 2014 diff hist +16,308 718 - Drilled Shafts →EQUIPMENT
- 10:10, 19 March 2014 diff hist +613 718 - Drilled Shafts →CONSTRUCTION
- 10:08, 19 March 2014 diff hist +3,673 718 - Drilled Shafts →MATERIALS
- 10:02, 19 March 2014 diff hist +4,216 718 - Drilled Shafts →GENERAL
- 09:57, 19 March 2014 diff hist +869 718 - Drilled Shafts →GENERAL
- 09:56, 19 March 2014 diff hist +37 N File:Fig 718-9.png Figure 9. Improper concrete placement current
- 09:56, 19 March 2014 diff hist +54 N File:Fig 718-8.png Figure 8. Rebar cage being lowered into complete shaft current
- 09:55, 19 March 2014 diff hist +28 N File:Fig 718-7.png Figure 7. Rebar cage spacers current
- 09:55, 19 March 2014 diff hist +31 N File:Fig 718-6.png Figure 6. Soft rock core barrel current
- 09:55, 19 March 2014 diff hist +28 N File:Fig 718-5.png Figure 5. Muck bucket bottom current
- 09:54, 19 March 2014 diff hist +21 N File:Fig 718-4.png Figure 4. Muck bucket current
- 09:54, 19 March 2014 diff hist +34 N File:Fig 718-3.png Figure 3. Single flight rock auger current
- 09:54, 19 March 2014 diff hist +35 N File:Fig 718-2.png Figure 2. Double flight earth auger current
- 09:53, 19 March 2014 diff hist +34 N File:Fig 718-1.png Figure 1. Typical drill rig set up current
- 14:00, 18 March 2014 diff hist +55 N File:103 Figure 1.jpg Figure 1 – Approval Thresholds for contract revisions current
- 16:26, 11 March 2014 diff hist -198 602 - Concrete Pavement Construction →Inspection During and Following Concrete Placement
- 15:38, 11 March 2014 diff hist -2,233 602 - Concrete Pavement Construction →Acceptance of Materials