Uploads by Greenes2
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
09:36, 12 June 2015 | MDOT IM15-02 FlowChart 491553 7.pdf (file) | 184 KB | Flowchart for Claims process BOH-IM 2015-02 | 1 | |
16:06, 24 November 2015 | M231 Ottawa County.jpg (file) | 209 KB | 1 | ||
16:58, 7 April 2014 | Letter - Procedures for Review of Contractor Claims.png (file) | 76 KB | Letter-Procedures for Review of Contractor Claims | 1 | |
12:07, 4 March 2015 | ITS Submittals List.pdf (file) | 88 KB | List of ITS Submittals | 1 | |
16:57, 7 April 2014 | IM11-07 CPF.png (file) | 59 KB | Claims Process Flow Chart | 1 | |
08:57, 29 May 2014 | I-96 Livonia.png (file) | 1.07 MB | Concrete Paving I-96 in Livonia | 1 | |
16:10, 18 December 2013 | HMA2.jpg (file) | 50 KB | Cover Photo 2 for 501 | 1 | |
16:04, 18 December 2013 | HMA1.png (file) | 19 KB | Cover Photo 1 for 501 | 1 | |
16:08, 18 December 2013 | HMA1.jpg (file) | 93 KB | Cover Photo 1 for 501 | 1 | |
14:24, 19 March 2014 | Flowchart 602-09.png (file) | 41 KB | Figure 602-9 Pavement Coring for Acceptance Flow Chart | 1 | |
11:36, 25 March 2013 | Figure 101.04-1cont.png (file) | 62 KB | 1 | ||
11:36, 25 March 2013 | Figure 101.04-1.png (file) | 87 KB | 1 | ||
09:56, 19 March 2014 | Fig 718-9.png (file) | 249 KB | Figure 9. Improper concrete placement | 1 | |
09:56, 19 March 2014 | Fig 718-8.png (file) | 298 KB | Figure 8. Rebar cage being lowered into complete shaft | 1 | |
09:55, 19 March 2014 | Fig 718-7.png (file) | 150 KB | Figure 7. Rebar cage spacers | 1 | |
09:55, 19 March 2014 | Fig 718-6.png (file) | 59 KB | Figure 6. Soft rock core barrel | 1 | |
09:55, 19 March 2014 | Fig 718-5.png (file) | 76 KB | Figure 5. Muck bucket bottom | 1 | |
09:54, 19 March 2014 | Fig 718-4.png (file) | 124 KB | Figure 4. Muck bucket | 1 | |
09:54, 19 March 2014 | Fig 718-3.png (file) | 98 KB | Figure 3. Single flight rock auger | 1 | |
09:54, 19 March 2014 | Fig 718-2.png (file) | 270 KB | Figure 2. Double flight earth auger | 1 | |
09:53, 19 March 2014 | Fig 718-1.png (file) | 189 KB | Figure 1. Typical drill rig set up | 1 | |
12:58, 12 May 2014 | Fig 708.9.png (file) | 318 KB | Figure 708.9 – Major deficiency – spalled bottom corner and exposed prestressing strands at the end of a box beam | 1 | |
12:57, 12 May 2014 | Fig 708.8.png (file) | 416 KB | Figure 708.8 – Minor damage – spalled bottom corner at the end of a box beam | 1 | |
12:57, 12 May 2014 | Fig 708.7.png (file) | 324 KB | Figure 708.7 – Minor damage – broken corner at end of PCI girder | 1 | |
12:56, 12 May 2014 | Fig 708.6.png (file) | 342 KB | Figure 708.6 – Minor surface defect – honeycombing of PCI girder | 1 | |
12:55, 12 May 2014 | Fig 708.5.png (file) | 350 KB | Figure 708.5 – Minor surface defect – rubber gasket crease | 1 | |
12:55, 12 May 2014 | Fig 708.4.png (file) | 325 KB | Figure 708.4 – Minor surface defect – air holes greater than 1” in any direction | 1 | |
12:54, 12 May 2014 | Fig 708.3.png (file) | 870 KB | Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart | 1 | |
12:54, 12 May 2014 | Fig 708.2.png (file) | 147 KB | Figure 708.2 | 1 | |
12:53, 12 May 2014 | Fig 708.2-1.png (file) | 255 KB | Figure 708.2-1 – Shop Drawing Review Process | 1 | |
12:58, 12 May 2014 | Fig 708.10.png (file) | 400 KB | Figure 708.10 – Major deficiency – improper consolidation of concrete and expose prestressing strands and steel reinforcement | 1 | |
12:52, 12 May 2014 | Fig 708.1-1.png (file) | 223 KB | Figure 708.1-1 – Shop Drawing Review Process | 1 | |
12:59, 12 May 2014 | Fig 708-11.png (file) | 226 KB | Figure 708-11 Crack comparator for measuring crack width | 1 | |
12:16, 3 February 2014 | Fig 705-6.png (file) | 56 KB | Figure 6. Typical conical pile pile points | 1 | |
12:16, 3 February 2014 | Fig 705-5.png (file) | 21 KB | Figure 5. Typical HP section pile points | 1 | |
12:16, 3 February 2014 | Fig 705-4.png (file) | 77 KB | Figure 4. Typical helmet and cushion configuration | 1 | |
12:15, 3 February 2014 | Fig 705-3.png (file) | 30 KB | Figure 3. Typical nylon hammer cushions | 1 | |
12:15, 3 February 2014 | Fig 705-2.png (file) | 22 KB | Figure 2. Typical pile driving equipment set up | 1 | |
12:14, 3 February 2014 | Fig 705-1.png (file) | 8 KB | Figure 1. Typical HP shape | 1 | |
16:30, 29 January 2014 | Fig 704-8.png (file) | 1.21 MB | Figure 704-8: Typical cofferdam bracing with walers and struts | 1 | |
13:37, 19 March 2014 | Fig 602-08.png (file) | 33 KB | Figure 602-8 Header Board Placement | 1 | |
13:36, 19 March 2014 | Fig 602-07.png (file) | 40 KB | Figure 602-7 Transverse Expansion Joints | 1 | |
13:36, 19 March 2014 | Fig 602-06.png (file) | 47 KB | Figure 602-6 Basket Pin and Basket Level | 1 | |
13:35, 19 March 2014 | Fig 602-05.png (file) | 39 KB | Figure 602-5 Positioning Dowel Basket Assemblies | 1 | |
08:21, 9 April 2014 | Fig717-01.png (file) | 154 KB | Drain Casting Assembly Details from Standard Plan Series B101 | 1 | |
08:01, 9 July 2014 | Fig715-02.jpg (file) | 33 KB | Figure 715-02 Near white blasted steel surface (SSPC-SP10). | 1 | |
08:20, 9 April 2014 | Fig711-07.png (file) | 110 KB | Bridge Barrier Railing, Aesthetic Parapet Tube | 1 | |
08:19, 9 April 2014 | Fig711-06.png (file) | 28 KB | Bridge Barrier Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Railing) | 1 | |
08:18, 9 April 2014 | Fig711-05.png (file) | 17 KB | Bridge Barrier Railing, Thrie Beam REtorfit (R4 Type Bridge Railing) | 1 | |
08:17, 9 April 2014 | Fig711-04.png (file) | 41 KB | Bridge Barrier Railing, 4 Tube | 1 |