Uploads by Greenes2
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
08:16, 9 April 2014 | Fig711-03.png (file) | 52 KB | Bridge Barrier Railing, 2 Tube | 1 | |
08:16, 9 April 2014 | Fig711-02.png (file) | 28 KB | Bridge Barrier Railing Type 5 | 1 | |
08:15, 9 April 2014 | Fig711-01.png (file) | 30 KB | Bridge Barrier Railing Type 4 | 1 | |
08:14, 9 April 2014 | Fig709-05.png (file) | 161 KB | Table 912-10 Preservation retention requirements. MDOT 2012 Standard Specifications for Construction. | 1 | |
08:12, 9 April 2014 | Fig709-04.png (file) | 23 KB | Inspection Stamp for Glulam Lumber | 1 | |
08:11, 9 April 2014 | Fig709-03.png (file) | 518 KB | Stress laminated deck system showing typical components. USDA-FPL-GTR-125 | 1 | |
08:06, 9 April 2014 | Fig709-02.png (file) | 19 KB | Typical Lumber Grading Marks | 1 | |
08:06, 9 April 2014 | Fig709-01.png (file) | 40 KB | Timber and Lumber Terminology | 1 | |
09:44, 2 May 2014 | Fig707.9.png (file) | 96 KB | Figure 707.9 - Groove Weld (G) Position | 1 | |
09:40, 2 May 2014 | Fig707.8.png (file) | 10 KB | Figure 707.8 - Fillet Weld (F) Positions | 1 | |
15:06, 1 May 2014 | Fig707.6.png (file) | 141 KB | Figure 707.6 Typical Turn of Nut Marking System | 1 | |
14:38, 1 May 2014 | Fig707.5.png (file) | 261 KB | Figure 707.5 Offset Dimension for Rocker Tilt | 1 | |
13:30, 1 May 2014 | Fig707.3.png (file) | 260 KB | Figure 707.3 - Steel Fabrication Inspection Flowchart | 1 | |
13:29, 1 May 2014 | Fig707.2.png (file) | 147 KB | Figure 707.2 Approved For Use Stamp (MDOT) | 1 | |
09:48, 2 May 2014 | Fig707.13.png (file) | 75 KB | Figure 707.13 Hotboxes for Electrode Storage | 1 | |
09:46, 2 May 2014 | Fig707.11.png (file) | 102 KB | Figure 707.11 Drying and Storage Oven | 1 | |
09:46, 2 May 2014 | Fig707.10.png (file) | 213 KB | Figure 707.10 Sample Approved Weld Procedure Specification (WPS) | 1 | |
13:27, 1 May 2014 | Fig707.1-2.png (file) | 255 KB | Figure 707.1-2 Shop Drawing Review Process | 1 | |
13:24, 1 May 2014 | Fig707.1-1.png (file) | 223 KB | Figure 707.1-1 – Shop Drawing Review Process | 1 | |
11:18, 1 May 2014 | Fig604-03.png (file) | 37 KB | Figure 604-3: Quality Assurance Mix Design Review | 1 | |
11:11, 1 May 2014 | Fig604-02.png (file) | 64 KB | MDOT Checklist For Concrete Paving With Warranty | 1 | |
12:15, 29 April 2014 | FIG603-01.png (file) | 10 KB | Beam Measurements | 1 | |
09:51, 2 July 2014 | ExCMpg3.png (file) | 53 KB | Example Contract Modification Page 3 | 1 | |
09:50, 2 July 2014 | ExCMpg2.png (file) | 68 KB | Example Contract Modification Page 2 | 1 | |
09:50, 2 July 2014 | ExCMpg1.png (file) | 55 KB | Example Contract Modification Page 1 | 1 | |
12:17, 29 April 2014 | EQ 603-02.png (file) | 2 KB | Simplified Center Point Flexural Strength Equation | 1 | |
12:11, 29 April 2014 | EQ603-01.png (file) | 1 KB | Flexural Strength of Concrete (Using Simple Beam With Center Point Loading): | 1 | |
15:27, 7 August 2014 | E-sign brochure.pdf (file) | 184 KB | E-sign brochure | 1 | |
15:26, 30 May 2014 | DownTown Detroit Panorama.png (file) | 280 KB | Downtown Detorit Panorama at the Monument to Joe Louis | 1 | |
09:37, 1 October 2013 | Density Inspection.jpg (file) | 374 KB | 1 | ||
08:57, 28 June 2013 | DU Title Block image.jpg (file) | 71 KB | 1 | ||
08:51, 25 June 2014 | Crews recently removed bridge beams from M-47 over US-10 near Midland.png (file) | 230 KB | Crews recently removed bridge beams from M-47 over US-10 near Midland | 1 | |
15:20, 16 September 2014 | Construction Guidance for Pavement Marking Projects.pdf (file) | 104 KB | 1 | ||
08:15, 29 April 2014 | Concrete JMF Yield Calculator.v3.4-17-13.xls (file) | 30 KB | Concrete JMF Yield Calculator v3 04-17-13 | 1 | |
16:10, 24 November 2015 | BridgeslideM100.jpg (file) | 463 KB | 1 | ||
09:56, 24 November 2015 | Auburn Hills DDI.jpg (file) | 443 KB | 1 | ||
14:17, 17 June 2014 | Appendix B - Sample Contract Modification.pdf (file) | 229 KB | Sample Contract Modification | 1 | |
14:16, 17 June 2014 | Appendix A - Approval Path Flow Chart.pdf (file) | 90 KB | Approval Path Flow Chart | 1 | |
12:21, 29 January 2014 | 714 Fig 7.png (file) | 586 KB | Figure 7. Proper vibrating techniques in deep forms | 1 | |
12:21, 29 January 2014 | 714 Fig 6.png (file) | 1.07 MB | Figure 6. ASTM A6 permitted variations in straightness | 1 | |
12:39, 29 January 2014 | 714 Fig 5.png (file) | 902 KB | Figure 5. ASTM A6 permitted variations in sectional dimensions | 1 | |
12:20, 29 January 2014 | 714 Fig 5.jpg (file) | 1.17 MB | Figure 5. ASTM A6 permitted variations in sectional dimensions | 1 | |
12:12, 29 January 2014 | 714 Fig 4.png (file) | 32 KB | Figure 4. Typical pile wall layouts | 1 | |
12:11, 29 January 2014 | 714 Fig 3.png (file) | 40 KB | Figure 3. Typical soldier pile wall section | 1 | |
12:10, 29 January 2014 | 714 Fig 2.png (file) | 65 KB | Figure 2. Typical formwork components | 1 | |
12:10, 29 January 2014 | 714 Fig 1.png (file) | 42 KB | Figure 1. Shoring tower buckling modes | 1 | |
09:41, 23 September 2014 | 1165 Health and Safety Example 1.pdf.png (file) | 69 KB | 1 | ||
09:32, 23 September 2014 | 1165 Contract Compliance Example 1.png (file) | 70 KB | 1 | ||
14:00, 18 March 2014 | 103 Figure 1.jpg (file) | 56 KB | Figure 1 – Approval Thresholds for contract revisions | 1 | |
08:17, 29 April 2014 | %Ret Table Check 4-24-13.xls (file) | 132 KB | Percent Retained Table Check 04-24-13 | 1 |