Uploads by Greenes2
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
15:20, 16 September 2014 | Construction Guidance for Pavement Marking Projects.pdf (file) | 104 KB | 1 | ||
08:20, 9 April 2014 | Fig711-07.png (file) | 110 KB | Bridge Barrier Railing, Aesthetic Parapet Tube | 1 | |
09:54, 19 March 2014 | Fig 718-4.png (file) | 124 KB | Figure 4. Muck bucket | 1 | |
10:41, 27 September 2013 | Traffic Signal.jpg (file) | 131 KB | 1 | ||
08:17, 29 April 2014 | %Ret Table Check 4-24-13.xls (file) | 132 KB | Percent Retained Table Check 04-24-13 | 1 | |
15:06, 1 May 2014 | Fig707.6.png (file) | 141 KB | Figure 707.6 Typical Turn of Nut Marking System | 1 | |
13:29, 1 May 2014 | Fig707.2.png (file) | 147 KB | Figure 707.2 Approved For Use Stamp (MDOT) | 1 | |
12:54, 12 May 2014 | Fig 708.2.png (file) | 147 KB | Figure 708.2 | 1 | |
09:55, 19 March 2014 | Fig 718-7.png (file) | 150 KB | Figure 7. Rebar cage spacers | 1 | |
08:21, 9 April 2014 | Fig717-01.png (file) | 154 KB | Drain Casting Assembly Details from Standard Plan Series B101 | 1 | |
08:14, 9 April 2014 | Fig709-05.png (file) | 161 KB | Table 912-10 Preservation retention requirements. MDOT 2012 Standard Specifications for Construction. | 1 | |
10:51, 22 September 2014 | The 96 Fix Grand OpeningCelebration.jpg (file) | 164 KB | The 96 Fix Grand Opening Celebration | 1 | |
09:36, 12 June 2015 | MDOT IM15-02 FlowChart 491553 7.pdf (file) | 184 KB | Flowchart for Claims process BOH-IM 2015-02 | 1 | |
15:27, 7 August 2014 | E-sign brochure.pdf (file) | 184 KB | E-sign brochure | 1 | |
09:53, 19 March 2014 | Fig 718-1.png (file) | 189 KB | Figure 1. Typical drill rig set up | 1 | |
16:06, 24 November 2015 | M231 Ottawa County.jpg (file) | 209 KB | 1 | ||
09:46, 2 May 2014 | Fig707.10.png (file) | 213 KB | Figure 707.10 Sample Approved Weld Procedure Specification (WPS) | 1 | |
13:24, 1 May 2014 | Fig707.1-1.png (file) | 223 KB | Figure 707.1-1 – Shop Drawing Review Process | 1 | |
12:52, 12 May 2014 | Fig 708.1-1.png (file) | 223 KB | Figure 708.1-1 – Shop Drawing Review Process | 1 | |
12:59, 12 May 2014 | Fig 708-11.png (file) | 226 KB | Figure 708-11 Crack comparator for measuring crack width | 1 | |
14:17, 17 June 2014 | Appendix B - Sample Contract Modification.pdf (file) | 229 KB | Sample Contract Modification | 1 | |
08:51, 25 June 2014 | Crews recently removed bridge beams from M-47 over US-10 near Midland.png (file) | 230 KB | Crews recently removed bridge beams from M-47 over US-10 near Midland | 1 | |
09:56, 19 March 2014 | Fig 718-9.png (file) | 249 KB | Figure 9. Improper concrete placement | 1 | |
13:27, 1 May 2014 | Fig707.1-2.png (file) | 255 KB | Figure 707.1-2 Shop Drawing Review Process | 1 | |
12:53, 12 May 2014 | Fig 708.2-1.png (file) | 255 KB | Figure 708.2-1 – Shop Drawing Review Process | 1 | |
13:30, 1 May 2014 | Fig707.3.png (file) | 260 KB | Figure 707.3 - Steel Fabrication Inspection Flowchart | 1 | |
14:38, 1 May 2014 | Fig707.5.png (file) | 261 KB | Figure 707.5 Offset Dimension for Rocker Tilt | 1 | |
09:54, 19 March 2014 | Fig 718-2.png (file) | 270 KB | Figure 2. Double flight earth auger | 1 | |
15:26, 30 May 2014 | DownTown Detroit Panorama.png (file) | 280 KB | Downtown Detorit Panorama at the Monument to Joe Louis | 1 | |
09:56, 19 March 2014 | Fig 718-8.png (file) | 298 KB | Figure 8. Rebar cage being lowered into complete shaft | 1 | |
12:58, 12 May 2014 | Fig 708.9.png (file) | 318 KB | Figure 708.9 – Major deficiency – spalled bottom corner and exposed prestressing strands at the end of a box beam | 1 | |
12:57, 12 May 2014 | Fig 708.7.png (file) | 324 KB | Figure 708.7 – Minor damage – broken corner at end of PCI girder | 1 | |
12:55, 12 May 2014 | Fig 708.4.png (file) | 325 KB | Figure 708.4 – Minor surface defect – air holes greater than 1” in any direction | 1 | |
12:56, 12 May 2014 | Fig 708.6.png (file) | 342 KB | Figure 708.6 – Minor surface defect – honeycombing of PCI girder | 1 | |
12:55, 12 May 2014 | Fig 708.5.png (file) | 350 KB | Figure 708.5 – Minor surface defect – rubber gasket crease | 1 | |
09:37, 1 October 2013 | Density Inspection.jpg (file) | 374 KB | 1 | ||
12:58, 12 May 2014 | Fig 708.10.png (file) | 400 KB | Figure 708.10 – Major deficiency – improper consolidation of concrete and expose prestressing strands and steel reinforcement | 1 | |
12:57, 12 May 2014 | Fig 708.8.png (file) | 416 KB | Figure 708.8 – Minor damage – spalled bottom corner at the end of a box beam | 1 | |
09:56, 24 November 2015 | Auburn Hills DDI.jpg (file) | 443 KB | 1 | ||
16:10, 24 November 2015 | BridgeslideM100.jpg (file) | 463 KB | 1 | ||
08:11, 9 April 2014 | Fig709-03.png (file) | 518 KB | Stress laminated deck system showing typical components. USDA-FPL-GTR-125 | 1 | |
12:21, 29 January 2014 | 714 Fig 7.png (file) | 586 KB | Figure 7. Proper vibrating techniques in deep forms | 1 | |
12:54, 12 May 2014 | Fig 708.3.png (file) | 870 KB | Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart | 1 | |
12:39, 29 January 2014 | 714 Fig 5.png (file) | 902 KB | Figure 5. ASTM A6 permitted variations in sectional dimensions | 1 | |
08:52, 9 May 2014 | Mackinac Bridge.png (file) | 926 KB | Construction began 60 years ago this month on the "Mighty Mac" | 1 | |
08:57, 29 May 2014 | I-96 Livonia.png (file) | 1.07 MB | Concrete Paving I-96 in Livonia | 1 | |
08:57, 9 May 2014 | Petosky US31.png (file) | 1.07 MB | Construction of US-31 in Petosky. | 1 | |
12:21, 29 January 2014 | 714 Fig 6.png (file) | 1.07 MB | Figure 6. ASTM A6 permitted variations in straightness | 1 | |
12:20, 29 January 2014 | 714 Fig 5.jpg (file) | 1.17 MB | Figure 5. ASTM A6 permitted variations in sectional dimensions | 1 | |
16:30, 29 January 2014 | Fig 704-8.png (file) | 1.21 MB | Figure 704-8: Typical cofferdam bracing with walers and struts | 1 |