Uploads by Greenes2
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
09:46, 2 May 2014 | Fig707.11.png (file) | 102 KB | Figure 707.11 Drying and Storage Oven | 1 | |
10:38, 2 July 2014 | Mount Elliot Park on the Detroit riverfront.jpg (file) | 100 KB | Mount Elliot Park on the Detroit riverfront. | 1 | |
09:54, 19 March 2014 | Fig 718-3.png (file) | 98 KB | Figure 3. Single flight rock auger | 1 | |
09:44, 2 May 2014 | Fig707.9.png (file) | 96 KB | Figure 707.9 - Groove Weld (G) Position | 1 | |
16:08, 18 December 2013 | HMA1.jpg (file) | 93 KB | Cover Photo 1 for 501 | 1 | |
14:16, 17 June 2014 | Appendix A - Approval Path Flow Chart.pdf (file) | 90 KB | Approval Path Flow Chart | 1 | |
12:07, 4 March 2015 | ITS Submittals List.pdf (file) | 88 KB | List of ITS Submittals | 1 | |
11:36, 25 March 2013 | Figure 101.04-1.png (file) | 87 KB | 1 | ||
12:16, 3 February 2014 | Fig 705-4.png (file) | 77 KB | Figure 4. Typical helmet and cushion configuration | 1 | |
11:18, 2 July 2014 | Work continues on the new M-85 bridge over the Rouge River in Detroit.jpg (file) | 77 KB | Work continues on the new M-85 bridge over the Rouge River in Detroit. | 1 | |
16:58, 7 April 2014 | Letter - Procedures for Review of Contractor Claims.png (file) | 76 KB | Letter-Procedures for Review of Contractor Claims | 1 | |
09:55, 19 March 2014 | Fig 718-5.png (file) | 76 KB | Figure 5. Muck bucket bottom | 1 | |
09:48, 2 May 2014 | Fig707.13.png (file) | 75 KB | Figure 707.13 Hotboxes for Electrode Storage | 1 | |
14:50, 1 May 2014 | Table707.2.png (file) | 74 KB | Brief description of high strength bolts, nuts and washers used for structural applications. | 1 | |
08:57, 28 June 2013 | DU Title Block image.jpg (file) | 71 KB | 1 | ||
09:32, 23 September 2014 | 1165 Contract Compliance Example 1.png (file) | 70 KB | 1 | ||
09:41, 23 September 2014 | 1165 Health and Safety Example 1.pdf.png (file) | 69 KB | 1 | ||
09:50, 2 July 2014 | ExCMpg2.png (file) | 68 KB | Example Contract Modification Page 2 | 1 | |
12:10, 29 January 2014 | 714 Fig 2.png (file) | 65 KB | Figure 2. Typical formwork components | 1 | |
11:11, 1 May 2014 | Fig604-02.png (file) | 64 KB | MDOT Checklist For Concrete Paving With Warranty | 1 | |
10:37, 2 July 2014 | Progress on the M-231 bridge over the Grand River in Ottawa County.jpg (file) | 64 KB | Progress on the M-231 bridge over the Grand River in Ottawa County | 1 | |
11:36, 25 March 2013 | Figure 101.04-1cont.png (file) | 62 KB | 1 | ||
09:55, 19 March 2014 | Fig 718-6.png (file) | 59 KB | Figure 6. Soft rock core barrel | 1 | |
16:57, 7 April 2014 | IM11-07 CPF.png (file) | 59 KB | Claims Process Flow Chart | 1 | |
12:16, 3 February 2014 | Fig 705-6.png (file) | 56 KB | Figure 6. Typical conical pile pile points | 1 | |
14:00, 18 March 2014 | 103 Figure 1.jpg (file) | 56 KB | Figure 1 – Approval Thresholds for contract revisions | 1 | |
09:50, 2 July 2014 | ExCMpg1.png (file) | 55 KB | Example Contract Modification Page 1 | 1 | |
09:51, 2 July 2014 | ExCMpg3.png (file) | 53 KB | Example Contract Modification Page 3 | 1 | |
08:16, 9 April 2014 | Fig711-03.png (file) | 52 KB | Bridge Barrier Railing, 2 Tube | 1 | |
16:10, 18 December 2013 | HMA2.jpg (file) | 50 KB | Cover Photo 2 for 501 | 1 | |
13:36, 19 March 2014 | Fig 602-06.png (file) | 47 KB | Figure 602-6 Basket Pin and Basket Level | 1 | |
12:10, 29 January 2014 | 714 Fig 1.png (file) | 42 KB | Figure 1. Shoring tower buckling modes | 1 | |
14:24, 19 March 2014 | Flowchart 602-09.png (file) | 41 KB | Figure 602-9 Pavement Coring for Acceptance Flow Chart | 1 | |
08:17, 9 April 2014 | Fig711-04.png (file) | 41 KB | Bridge Barrier Railing, 4 Tube | 1 | |
13:36, 19 March 2014 | Fig 602-07.png (file) | 40 KB | Figure 602-7 Transverse Expansion Joints | 1 | |
12:11, 29 January 2014 | 714 Fig 3.png (file) | 40 KB | Figure 3. Typical soldier pile wall section | 1 | |
08:06, 9 April 2014 | Fig709-01.png (file) | 40 KB | Timber and Lumber Terminology | 1 | |
13:35, 19 March 2014 | Fig 602-05.png (file) | 39 KB | Figure 602-5 Positioning Dowel Basket Assemblies | 1 | |
11:18, 1 May 2014 | Fig604-03.png (file) | 37 KB | Figure 604-3: Quality Assurance Mix Design Review | 1 | |
08:01, 9 July 2014 | Fig715-02.jpg (file) | 33 KB | Figure 715-02 Near white blasted steel surface (SSPC-SP10). | 1 | |
13:37, 19 March 2014 | Fig 602-08.png (file) | 33 KB | Figure 602-8 Header Board Placement | 1 | |
12:12, 29 January 2014 | 714 Fig 4.png (file) | 32 KB | Figure 4. Typical pile wall layouts | 1 | |
12:15, 3 February 2014 | Fig 705-3.png (file) | 30 KB | Figure 3. Typical nylon hammer cushions | 1 | |
08:15, 9 April 2014 | Fig711-01.png (file) | 30 KB | Bridge Barrier Railing Type 4 | 1 | |
08:15, 29 April 2014 | Concrete JMF Yield Calculator.v3.4-17-13.xls (file) | 30 KB | Concrete JMF Yield Calculator v3 04-17-13 | 1 | |
08:19, 9 April 2014 | Fig711-06.png (file) | 28 KB | Bridge Barrier Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Railing) | 1 | |
08:16, 9 April 2014 | Fig711-02.png (file) | 28 KB | Bridge Barrier Railing Type 5 | 1 | |
14:12, 19 March 2014 | Table 602 % increase strength.png (file) | 27 KB | Table 602 % increase strength.png | 1 | |
12:22, 29 April 2014 | Table603-01.png (file) | 26 KB | Table 1: Modulus of Rupture Factors (F) | 1 | |
08:12, 9 April 2014 | Fig709-04.png (file) | 23 KB | Inspection Stamp for Glulam Lumber | 1 |