(newest | oldest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 701.02 - Materials (Author request: content was: "'''701.02.2 '''Stone Sand''' Stone sand 2SS will be permitted only in concrete to be used in structure concrete not exposed to vehicular traffic. ''..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 703.01 - General (Author request: content was: "'''703.01 - GENERAL''' Mortar and concrete patching, repair and resurfacing mixtures will be combined in proportions specified for the various types. Unless..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 703.03 - Equipment (Author request: content was: "'''703.03 - EQUIPMENT''' Equipment for producing concrete by volumetric batching and continuous mixing will conform to ASTM C 685. The Contractor will be ..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 502.01 - Materials (Author request: content was: "502 - HMA Construction Practices '''502.01 - MATERIALS''' HMA types will be as specified on the plans or in the proposal. Bond coat, also referred to as tack coat, is an asphalt emulsion. This is a certified produc...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 705.01 - General (Author request: content was: "'''705.01 - GENERAL''' Foundation piles are usually steel H sections or cast-in-place (CIP) concrete in steel shells. Fluted shells are usually an allow..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 704.02 - Cofferdams (Author request: content was: "'''704.02 - COFFERDAMS''' '''704.02.1 '''Definition''' A cofferdam is a substantially watertight enclosure which will permit substructure construction a..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 704.01 - Steel Piling (Author request: content was: "'''704.01 - STEEL PILING''' '''704.01.1 '''Sheet Piling''' Steel sheet piling may be: - permanent. - temporary. - part of a cofferdam. Sheet pilin..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 702.01 - General (Author request: content was: "'''702.01 - GENERAL''' Mortar and grout is a mixture of: - cement. - fine aggregate (except for expansive grout). - concrete admixtures (when speci..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 701.06 - Admixtures (Author request: content was: "'''701.06 - ADMIXTURES ''' Changes in the amount of air-entrained admixture used should be carefully monitored. '''701.06.1 '''Air-Entrained Admixtures''..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 701.01 - General (Author request: content was: "'''701.01 - GENERAL''' Unless otherwise specified, air entrained concrete will be required for structural work. Defoaming (air-detraining) admixtures wi..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.02 - Equipment (Author request: content was: "502 - HMA Construction Practices '''502.02 - EQUIPMENT''' The Contractor must provide all equipment required to prepare the base and place the HMA in accordance with the plans and specifications. This equipment must...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.04 - Adjusting Drainage Structures (Author request: content was: "502 - HMA Construction Practices '''502.04 - ADJUSTING DRAINAGE STRUCTURES''' One of the greatest contributors to a poor ride on an urban project is the improper adjustment of manholes. Refer to Section 403 of this ...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.05 - Wedging (Author request: content was: "502 - HMA Construction Practices '''502.05 - WEDGING''' Some old surfaces may need to be leveled or smoothed before the new surface is placed. This requires a HMA layer of varying thickness to be placed and is refer...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.06 - Bond Coat (Author request: content was: "502 - HMA Construction Practices '''502.06 - BOND COAT''' The bond coat, also called the tack coat, consists of an asphaltic emulsion applied to an existing surface to promote adhesion between the old surface and the...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.07 - Placing HMA Mixture (Author request: content was: "502 - HMA Construction Practices '''502.07 - PLACING HMA MIXTURE''' It is the Contractor’s responsibility to uniformly place the HMA mixture to the specified grade and thickness. It is the MDOT inspector’s respo...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.08 - Joints (Author request: content was: "502 - HMA Construction Practices '''502.08 - JOINTS''' Attention needs to be directed toward joints more than any other phase of HMA construction. The subject of joints includes longitudinal joints and transverse jo...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.09 - Compaction (Author request: content was: "502 - HMA Construction Practices '''502.09 - COMPACTION''' Compaction is the single most important factor that affects the ultimate performance of a hot mix asphalt pavement. Adequate compaction of the mix increases...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.10 - Coring (Author request: content was: "502 - HMA Construction Practices '''502.10 - CORING''' Once the Contractor has finished the rolling operation, the inspector will identify the locations where the density cores will be taken; these locations are rand...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.11 - Surface Defects (Author request: content was: "502 - HMA Construction Practices '''502.11 - SURFACE DEFECTS''' Surface defects are problems that occur in the asphalt mixture during, or soon after, the lay down and compaction process. These defects can be divided...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.12 - Surface Tolerances (Author request: content was: "502 - HMA Construction Practices '''502.12 - SURFACE TOLERANCE''' The importance of staying within the surface tolerance for smoothness cannot be overemphasized. Irregularities in the lower courses can usually be co...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.13 - Payment (Author request: content was: "502 - HMA Construction Practices '''502.13 - PAYMENT''' The amount bid for HMA may be adjusted. These adjustments are based upon the mixture acceptance test results and the pavement in-place density, and are explain...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.14 - Paving Inspector's Checklist (Author request: content was: "502 - HMA Construction Practices '''502.14 - PAVING INSPECTOR’S CHECKLIST''' Things to look for during the paving operation include: {| class="wikitable" |- | colspan="2" | <center>'''Trucking'''</center> |- | <c...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.15 - Mat Troubleshooting Guide (Author request: content was: "502 - HMA Construction Practices '''502.15 - MAT TROUBLESHOOTING GUIDE''' {| class="wikitable" |- | <center>'''Cause'''</center> | <center>'''Fix'''</center> |- | colspan="2" | <center>'''Mat Tearing at Full Width'...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.16 - MDOT Standard Practice for Random Sampling of HMA Materials (Author request: content was: "502 - HMA Construction Practices '''502.16 - MDOT STANDARD PRACTICE FOR RANDOM SAMPLING OF HMA MATERIALS''' '''502.16.1 SCOPE''' This practice covers the determination of random locations at which samples of cons...)
- 14:46, 21 May 2014 Greenes2 talk contribs deleted page 502.17 - Temporary Patching with HMA Mixtures (Author request: content was: "502 - HMA Construction Practices '''502.17 - TEMPORARY PATCHING WITH HMA MIXTURE''' '''502.17.1''' The HMA mixture used for patching should be the top course mixture called for on the plans, or in the proposal. ...)
- 14:46, 21 May 2014 Greenes2 talk contribs deleted page 502.18 - Glossary of Paving Terms (Author request: content was: "502 - HMA Construction Practices '''502.18 - GLOSSARY OF PAVING TERMINOLOGY''' * AGGREGATE - Various hard, inert materials such as sand, gravel, pebbles, etc., used as the bulk material in asphaltic mixes. * ANGLE O...)
- 14:46, 21 May 2014 Greenes2 talk contribs deleted page 505 - Overband Crack Seal (Author request: content was: "505 - Overband Crack Seal - Reserved -")
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.01 - Materials (Author request: content was: "506 - Slurry Seal '''506.01 - MATERIALS''' The asphalt emulsion must be certified and supplied by an approved supplier. The mix design and quality control testing is the responsibility of the Contractor. The MDOT i...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.02 - Equipment (Author request: content was: "506 - Slurry Seal '''506.02 - EQUIPMENT''' Equipment shall be safe, environmentally acceptable and capable of producing a specification product. A typical product will have some, or all, of the following equipment o...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.03 - Pre-Paving Meeting (Author request: content was: "506 - Slurry Seal '''506.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <center>'...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.04 - Construction (Author request: content was: "506 - Slurry Seal '''506.04 - CONSTRUCTION''' '''506.04.1 Site Preparation''' All loose materials, vegetation, dirt, mud and other objectionable material shall be removed from the surface prior to placing the mi...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.05 - Delayed Acceptance (Author request: content was: "506 - Slurry Seal '''506.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be correct...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.01 - Materials (Author request: content was: "507 - Micro Surfacing '''507.01 - MATERIALS''' Micro-surfacing should be used only for filling rutted pavements. All other applications are inappropriate. However, if called for on the plans or proposal, the follow...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.02 - Equipment (Author request: content was: "507 - Micro Surfacing '''507.02 - EQUIPMENT''' '''507.02.1 Mixing Machine''' The mixing machine shall be equipped with a positive connection conveyer belt aggregate delivery system and an inter-connected positiv...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.03 - Pre-Paving Meeting (Author request: content was: "507 - Micro Surfacing '''507.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <cent...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.04 - Construction (Author request: content was: "507 - Micro Surfacing '''507.04 - CONSTRUCTION''' Before placing the mixture, the Contractor shall thoroughly clean the existing surface of all loose materials, vegetation, dirt, dust, mud and other objectionable mat...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 507.05 - Delayed Acceptance (Author request: content was: "507 - Micro Surfacing '''507.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be cor...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 508.02 - Equipment (Author request: content was: "508 - Chip Seals '''508.02 - EQUIPMENT''' Equipment shall be safe, environmentally acceptable and capable of producing a product that meets the specifications. The pressure distributor shall meet the same requiremen...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 508.01 - Materials (Author request: content was: "508 - Chip Seals '''508.01 - MATERIALS''' The asphalt emulsion must be a certified product and be supplied by a certified supplier. The Contractor must maintain quality control and uniformity in testing procedures. ...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.03 - Pre-Paving Meeting (Author request: content was: "508 - Chip Seals '''508.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <center>''...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.04 - Construction (Author request: content was: "508 - Chip Seals '''508.04 - CONSTRUCTION''' The surface shall have all dirt, debris and vegetation removed. The asphalt emulsion shall not be placed until the surface is approved by the Engineer. The asphalt emuls...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.05 - Delayed Acceptance (Author request: content was: "508 - Chip Seals '''508.05 - DELAYED ACCEPTANCE''' This type of project has a 30 day delayed acceptance procedure. Any major problems with the project will have to be corrected before the project will be accepted. ...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 813.02 - Concrete Slope Paving and Headers (Author request: content was: "813 - Slope Protection '''813.02 - CONCRETE SLOPE PAVING AND HEADERS''' Forms must extend the full depth of the concrete for slope paving. Slope paving hea..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 803.02 - Construction (Author request: content was: "803 - Concrete Sidewalk, Ramps, and Steps '''803.02 - CONSTRUCTION''' The concrete should be struck off, spaded along any fixed forms and floated to a smoot..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 802.02 - Construction (Author request: content was: "802 - Concrete Curb, Gutter, and Dividers '''802.02 - CONSTRUCTION''' Projects with large amounts of curb and gutter will almost always be constructed by th..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 802.01 - General (Author request: content was: "802 - Concrete Curb, Gutter, and Dividers '''802.01 - GENERAL''' Three methods are in general use to construct curb or curb and gutter slipformed, fixed for..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.05 - Placing and Finishing Concrete (Author request: content was: "602 - Concrete Pavement Construction '''602.05 - PLACING AND FINISHING CONCRETE''' The specifications set forth the equipment requirements necessary in the ..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.03 - Instructions to Concrete Pavement Inspectors (Author request: content was: "602 - Concrete Pavement Construction '''602.03 - INSTRUCTIONS TO CONCRETE PAVEMENT INSPECTORS''' The construction of PCC pavement is a highly mechanized ope..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.02 - Concrete Testing Procedures (Author request: content was: "602 - Concrete Pavement Construction '''602.02 - CONCRETE TESTING PROCEDURES''' Quality control testing for concrete QC/QA construction projects will be gov..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.07 - Inspection and Control on Small Quantities of Concrete (Author request: content was: "601 - PCC Pavement Mixtures '''601.07 - INSPECTION AND CONTROL ON SMALL QUANTITIES OF CONCRETE''' Small quantities are defined as daily production of less t..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.06 - Documentation (Author request: content was: "601 - PCC Pavement Mixtures '''601.06 - DOCUMENTATION''' '''601.06.1 Concrete Tickets''' The Contractor/concrete producer will have computer-generated ..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.05 - Mix Computation (Author request: content was: "601 - PCC Pavement Mixtures '''601.05 - MIX COMPUTATION''' '''601.05.1 Unit Weight - Coarse Aggregate''' The coarse aggregate unit weight can be found ..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.03 - NRMCA Plant Certification (Author request: content was: "601 - PCC Pavement Mixtures '''601.03 - NRMCA PLANT CERTIFICATION''' Portable and stationary concrete batch plant facilities supplying Portland cement concr..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 605.03 - Reviewing Mix Designs (Author request: content was: "605 - Contractor Quality Assurance for Concrete '''605.03 - REVIEWING MIX DESIGNS''' Regardless of the method of verification selected by the Contractor, all mix designs must be accompanied by strength test results. ...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 605.04 - Concrete QA Pay Adjustment (Author request: content was: "605 - Contractor Quality Assurance for Concrete '''605.04 - Concrete QA Pay Adjustment''' file:Figure 605.03-6.JPG|center|thumb|500px|Figure 605-4 - Portl..." (and the only contributor was "[[Special:Contributions/Ri...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 605.02 - Responsibilities (Author request: content was: "605 - Contractor Quality Assurance for Concrete '''605.02 - RESPONSIBILITIES ''' The responsibilities of each party must be clear at the start of the project. '''605.02.1 Contractor Responsibilities''' Provid...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 605.01 - General (Author request: content was: "605 - Contractor Quality Assurance for Concrete '''605.01 - GENERAL''' Quality assurance for concrete is a statistically based procedure intended for use with standard grades of Portland cement concrete which have be...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 604.07 - Retest and Coring (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.07 - RETEST AND CORING''' The Special Provision provides for retesting or coring a lot of concrete, if the strength requirements are not verified by initial compre...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 604.06 - Calculating Adjustments (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.06 - CALCULATING ADJUSTMENTS''' The concrete quality assurance Special Provision provides step-by-step calculations for figuring the payment on each lot of concret...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.05 - Reviewing Mix Designs (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.05 - REVIEWING MIX DESIGNS''' The Contractor is responsible for providing mix designs for all concrete covered by the concrete QC/QA program. Before production be...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.04 - Contractor Quality Control for Pavement Warranties (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.04 - CONTRACTOR QUALITY CONTROL FOR CONCRETE PAVEMENT WARRANTIES''' Special provisions currently govern requirements for Contractor Quality Control on projects con...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.03 - Quality Control Plan (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.03 - QUALITY CONTROL PLAN''' The Quality Control Plan must: * Stress quality and commitment to job control. * Provide written assurance that all work will be perf...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.02 - Responsibilities (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.02 - RESPONSIBILITIES''' The responsibilities of each party must be clear at the start of the project. '''604.02.1 Contractor Responsibilities''' Develop and...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.01 - General (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.01 - GENERAL''' Contractor Quality Control for Concrete requires that the Contractor provide and maintain a Quality Control Plan, listing all the personnel, equipm...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 603.12 - Capital Preventative Maintenance - Performance Warranties (Author request: content was: "603 - Concrete Pavement Restoration '''603.12 - CAPITAL PREVENTIVE MAINTENANCE - PERFORMANCE WARRANTIES''' Special provisions currently govern requirements for performance warranties on all Capital Preventive Mainten...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 603.11 - Dowel Bar Retrofit (DBR) (Author request: content was: "603 - Concrete Pavement Restoration '''603.11 - DOWEL BAR RETROFIT (DBR)''' Dowel bar retrofit commonly referred to as DBR is a repair procedure typically used on concrete pavement that exhibits intermittent transver...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 603.10 - Sand Patch Test (ASTM 965.96E) (Author request: content was: "603 - Concrete Pavement Restoration '''603.10 - SAND PATCH TEST ASTM 965-96E''' Measuring Pavement Macro Texture Depth Procedure as follows: * Select a dry homogeneous area that contains no unique features. * Clean ...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.09 - Diamond Grinding (Author request: content was: "603 - Concrete Pavement Restoration '''603.09 - DIAMOND GRINDING''' Diamond grinding is used to restore the surface longitudinal profile and improved ride quality of a PCC pavement. And many times is done in conjunc...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.08 - Sealing Joints and Opening to Traffic (Author request: content was: "603 - Concrete Pavement Restoration '''603.08 - SEALING JOINTS AND OPENING TO TRAFFIC''' Longitudinal bulkhead joints, joints in base course repairs, joints in repairs constructed in preparation for HMA overlays and ...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.07 - Strength Requirements (Author request: content was: "603 - Concrete Pavement Restoration '''603.07 - STRENGTH REQUIREMENTS''' The concrete repairs may be opened to traffic when the concrete has attained a flexural strength of 500 psi (3.5 MPa) for repairs constructed w...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.06 - Palcing and Finishing Concrete (Author request: content was: "603 - Concrete Pavement Restoration '''603.06 - PLACING AND FINISHING CONCRETE''' Concrete will be placed usually the same day the existing concrete is removed and cast full depth in a single pour. Immediately befor...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.05 - Joints (Author request: content was: "603 - Concrete Pavement Restoration '''603.05 - JOINTS''' In general, according to Standard Plan R-44 Series, the repair will have a Tied Joint (Trg) at the leading edge and a Contraction Joint (Crg), or Expansion Jo...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.04 - Removing Old Concrete (Author request: content was: "603 - Concrete Pavement Restoration '''603.04 - REMOVING OLD CONCRETE''' Before removal, the concrete will be sawed full depth according to the details shown on the plans or in the proposal. This must be done with m...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.03 - Patch Layout (Author request: content was: "603 - Concrete Pavement Restoration '''603.03 - PATCH LAYOUT''' The location of repairs will be listed on a log in the proposal, on the plans or in the pavement condition survey log. Locate, number and record, for f...)
- 14:33, 21 May 2014 Greenes2 talk contribs deleted page 603.02 - Materials (Author request: content was: "603 - Concrete Pavement Restoration '''603.02 - MATERIALS''' Before patching begins, the inspector should verify that proper concrete mix design charts are being used and that all materials to be incorporated in the ...)
- 14:33, 21 May 2014 Greenes2 talk contribs deleted page 603.01 - General (Author request: content was: "603 - Concrete Pavement Restoration '''603.01 - GENERAL''' This work consists of repairing portions of a concrete pavement with Portland cement concrete and the type of joints specified. Pavement includes mainline p...)
- 14:33, 21 May 2014 Greenes2 talk contribs deleted page 602.11 - Inspector's Checklist (Author request: content was: "602 - Concrete Pavement Construction '''602.11 - INSPECTOR’S CHECKLIST''' '''602.11.1 Transporting Central Mixed Concrete''' * Determine that elapsed time is within specification limits for temperature and type...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.10 - Ride Quality (Author request: content was: "602 - Concrete Pavement Construction '''602.10 - RIDE QUALITY''' A specification to encourage the Contractor’s to construct the smoothest pavements possible and the method to measure the surface for smoothness. Th...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.08 - Street Inspector's Report (Author request: content was: "602 - Concrete Pavement Construction '''602.08 - STREET INSPECTOR’S REPORT''' Inspector’s Report of Concrete Placed, Form 1174A [http://hct591jbosds790/wiki/index.php/File:601.07-1.jpg ('''''Figure 601-6''''')] i...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.09 - Pavement Coring (Author request: content was: "602 - Concrete Pavement Construction '''602.09 - PAVEMENT CORING''' To determine pavement, shoulder and base course thickness and depth of reinforcement, cores shall be taken from the pavement before its final accept...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 804.03 - Construction (Author request: content was: "804 - Concrete Barriers and Glare Screens '''804.03 - CONSTRUCTION''' Adjustable mules may be needed in transition and superelevated median areas. '''804.0..." (and the only contributor was "[[Special:Contributions/...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.07 - Opening to Traffic (Author request: content was: "602 - Concrete Pavement Construction '''602.07 - OPENING TO TRAFFIC''' Often the Contractor will want to use the new pavement as a haul road for his batch t..." (and the only contributor was "[[Special:Contributions/...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.06 - Inspection During and Following Concrete Placement (Author request: content was: "602 - Concrete Pavement Construction '''602.06 - INSPECTION DURING AND FOLLOWING CONCRETE PLACEMENT''' Inspect the previous day’s pavement for uniformity ..." (and the only contributor was "[[Special:Contributions/...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 501.03 - Hopt Mix Plants (Author request: content was: "'''501.03 - HOT MIX PLANTS''' HMA mixtures being supplied to MDOT projects must be produced at a certified facility. Plants are certified in accordance with..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.04 - Acceptance of Materials (Author request: content was: "602 - Concrete Pavement Construction '''602.04. - ACCEPTANCE OF MATERIALS''' Before paving operations start, the paving inspector should verify that all mat..." (and the only contributor was "[[Special:Contributions/...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 602.01 - Instructions to Concrete Mix Operations (Author request: content was: "602 - Concrete Pavement Construction '''602.01 - INSTRUCTIONS TO CONCRETE MIX OPERATIONS''' The concrete mix inspector is responsible for the job site quali..." (and the only contributor was "[[Special:Contributions/...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 601.08 - Concrete Technician's Checklist (Author request: content was: "601 - PCC Pavement Mixtures '''601.08 – Concrete Technician’s Checklist''' {| class="wikitable" |- | <center>'''Item'''</center> | <center>'''Des..." (and the only contributor was "[[Special:Contributions/...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 205.14 - Measurement of Earthwork (Author request: content was: "'''205.14 - MACHINE GRADING''' Machine grading is used only when light grading, such as may be accomplished with a blade grader, is required to develop the..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 205.13 - Machine Grading (Author request: content was: "'''205.13 - WETLAND CONSTRUCTION''' If a wetland is to be constructed in association with a project for mitigation purposes, there will generally be plan s..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 205.12 - Wetland Construction (Author request: content was: "'''205.12 - BORROW/USE OF EXCESS PROPERTY''' Earth material found outside the grading limits is considered borrow material. This can include material ei..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:28, 21 May 2014 Greenes2 talk contribs deleted page 601.04 - Materials (Author request: content was: "601 - PCC Pavement Mixtures '''601.04 - MATERIALS''' All materials used in MDOT’s construction and maintenance projects must be tested and/or approved bef..." (and the only contributor was "[[Special:Contributions/...)
- 14:28, 21 May 2014 Greenes2 talk contribs deleted page 601.02 - Plant Site Review (Author request: content was: "601 - PCC Pavement Mixtures '''601.02 - PLANT SITE REVIEW''' Before the concrete supplier starts to deliver concrete to the project, the inspector should ch..." (and the only contributor was "[[Special:Contributions/...)
- 14:28, 21 May 2014 Greenes2 talk contribs deleted page 601.01 - Instructions to Concrete Mix Inspector (Author request: content was: "601 - PCC Pavement Mixtures '''601.01 - INSTRUCTIONS TO CONCRETE MIX INSPECTOR''' It is the responsibility of the concrete mix inspector to ensure that the ..." (and the only contributor was "[[Special:Contributions/...)
- 14:28, 21 May 2014 Greenes2 talk contribs deleted page 816.04 - Sod (Author request: content was: "816 - Turf Establishment '''816.04 - SOD''' Before sodding operations begin, areas will be dressed to plan tolerance. The earth beds will be thoroughly wat..." (and the only contributor was "[[Special:Contributions/...)
- 14:28, 21 May 2014 Greenes2 talk contribs deleted page 816.03 - Topsoil Surfacing, Seeding, and Mulch (Author request: content was: "816 - Turf Establishment '''816.03 - TOPSOIL SURFACING, SEEDING AND MULCH''' Prior to the seeding operation, the topsoiled surface should be lightly disked ..." (and the only contributor was "[[Special:Contributions/...)
- 14:28, 21 May 2014 Greenes2 talk contribs deleted page 816.02 - Guidelines (Author request: content was: "816 - Turf Establishment '''816.02 - GUIDELINES''' '''816.02.1 Rural''' 1 on 2 on slopes less than 20 feet (6 m) in height will be seeded and mulched a..." (and the only contributor was "[[Special:Contributions/...)
- 14:27, 21 May 2014 Greenes2 talk contribs deleted page 816.01 - General (Author request: content was: "816 - Turf Establishment '''816.01 - GENERAL''' In the interest of economy and more efficient use of erosion control, many areas that in the past would have..." (and the only contributor was "[[Special:Contributions/...)
- 14:27, 21 May 2014 Greenes2 talk contribs deleted page 815.04 - Checklist for Inspection (Author request: content was: "815 - Landscaping '''815.04 - CHECKLIST FOR INSPECTION''' {| class="wikitable" |- | <center>'''Item'''</center> | <center>'''Description'''</center> |..." (and the only contributor was "[[Special:Contributions/...)
- 14:26, 21 May 2014 Greenes2 talk contribs deleted page 815.03 - Final Inspection (Author request: content was: "815 - Landscaping '''815.03 - FINAL INSPECTION''' Final inspection of the work will be made by the Region Resource Analyst, accompanied by personnel from ei..." (and the only contributor was "[[Special:Contributions/...)
- 14:26, 21 May 2014 Greenes2 talk contribs deleted page 815.02 - Plant Materials (Author request: content was: "815 - Landscaping '''815.02 - PLANT MATERIALS''' Plant materials may be inspected by Roadside Development personnel who will submit Form 1198 covering visua..." (and the only contributor was "[[Special:Contributions/...)
- 14:26, 21 May 2014 Greenes2 talk contribs deleted page 815.01 - General (Author request: content was: "815 - Landscaping '''815.01 - GENERAL''' The Engineer assigned to the work will be responsible for direct supervision of the Contractor’s operation. He w..." (and the only contributor was "[[Special:Contributions/...)
- 14:26, 21 May 2014 Greenes2 talk contribs deleted page 814.02 - Checklist for Inspector's (Author request: content was: "814 - Paved Ditches '''814.02 - CHECKLIST FOR INSPECTION''' {| class="wikitable" |- | <center>'''Item'''</center> | <center>'''Description'''</center> ..." (and the only contributor was "[[Special:Contributions/...)
- 14:26, 21 May 2014 Greenes2 talk contribs deleted page 814.01 - General (Author request: content was: "814 - Paved Ditches '''814.01 - GENERAL''' In situations where high velocity flow or excessive grade occurs, paving a ditch may be necessary rather than sod..." (and the only contributor was "[[Special:Contributions/...)
- 14:24, 21 May 2014 Greenes2 talk contribs deleted page 813.03 - Riprap (Author request: content was: "813 - Slope Protection '''813.03 - RIPRAP''' Plain riprap is most often called for where wash or scouring action may be expected and the availability of sto..." (and the only contributor was "[[Special:Contributions/...)
- 14:24, 21 May 2014 Greenes2 talk contribs deleted page 813.01 - Precast slope Protection (Author request: content was: "813 - Slope Protection '''813.01 - PRECAST SLOPE PAVING''' To obtain satisfactory results with precast slope blocks, a uniform and properly compacted sand g..." (and the only contributor was "[[Special:Contributions/...)
- 14:24, 21 May 2014 Greenes2 talk contribs deleted page 809.02 - Measurement and Payment (Author request: content was: "809 - Field Office '''809.02 - MEASUREMENT AND PAYMENT''' A reminder that utility usage fees (electricity, gas and telephone charges) incurred by MDOT and p..." (and the only contributor was "[[Special:Contributions/...)
- 14:24, 21 May 2014 Greenes2 talk contribs deleted page 809.01 - General (Author request: content was: "809 - Field Office '''809.01 - GENERAL''' The field office should be located within the limits of the project. The Contractor’s input is needed for the l..." (and the only contributor was "[[Special:Contributions/...)
- 15:12, 20 May 2014 Greenes2 talk contribs deleted page 808.01 - General (Author request: content was: "808 - Fencing '''808.01 - GENERAL''' Current policy requires all limited access expressways to be fenced along the ROW. Other locations, such as rural, two..." (and the only contributor was "[[Special:Contributions/...)
- 15:12, 20 May 2014 Greenes2 talk contribs deleted page 808.02 - Materials (Author request: content was: "808 - Fencing '''808.02 - MATERIALS''' Unless otherwise noted, posts and fence fabric will be accepted at the job site if they are accompanied by proper cer..." (and the only contributor was "[[Special:Contributions/...)
- 15:12, 20 May 2014 Greenes2 talk contribs deleted page 808.03 - Construction (Author request: content was: "808 - Fencing '''808.03 - CONSTRUCTION''' When erecting woven wire fence, a line post must be placed every 15 feet (5 meters). Every end, corner, gate, ang..." (and the only contributor was "[[Special:Contributions/...)
- 15:12, 20 May 2014 Greenes2 talk contribs deleted page 808.04 - Measurement and Payment (Author request: content was: "808 - Fencing '''808.04 - MEASUREMENT AND PAYMENT''' Woven wire fence of the type designated will be paid in feet (meters) and will include the posts. Chai..." (and the only contributor was "[[Special:Contributions/...)
- 15:06, 20 May 2014 Greenes2 talk contribs deleted page 806.01 - General (Author request: content was: "806 - Bicycle Paths '''806. 1 - GENERAL''' Construction of bicycle paths consists of grading, placement of either concrete or HMA materials and restoration ..." (and the only contributor was "[[Special:Contributions/...)
- 15:06, 20 May 2014 Greenes2 talk contribs deleted page 806.02 - Materials (Author request: content was: "806 - Bicycle Paths '''806.02 - MATERIALS''' See Division 5, HMA and Division 6, Concrete for general..." (and the only contributor was "[[Special:Contributions/...)
- 15:06, 20 May 2014 Greenes2 talk contribs deleted page 806.03 - Construction (Author request: content was: "806 - Bicycle Paths '''806.03 - CONSTRUCTION''' A smooth riding surface is important for the high tire pressures generally found in bicycle tires. To achie..." (and the only contributor was "[[Special:Contributions/...)
- 15:06, 20 May 2014 Greenes2 talk contribs deleted page 806.04 - Measurement and Payment (Author request: content was: "806 - Bicycle Paths '''806.04 - MEASUREMENT AND PAYMENT''' Measurement and payment will be as specified in the [http://mdotcf.state.mi.us/public/specbook/20..." (and the only contributor was "[[Special:Contributions/...)
- 15:05, 20 May 2014 Greenes2 talk contribs deleted page 807.01 - General (Author request: content was: "807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts '''807.01 - GENERAL''' The Standard Plans R-56 through R-73 Series include details on guardrai..." (and the only contributor was "[[Special:Contributions/...)
- 15:05, 20 May 2014 Greenes2 talk contribs deleted page 807.02 - Materials (content was: "807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts '''807.02 - MATERIALS''' Guardrail elements, end sections and posts may be accepted based on a..." (and the only contributor was "Rinarda"))
- 15:05, 20 May 2014 Greenes2 talk contribs deleted page 807.03 - Construction (Author request: content was: "807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts '''807.03 - CONSTRUCTION''' '''807.03.1 Line and Grade''' Staking for line and grade is t..." (and the only contributor was "[[Special:Contributions/...)
- 15:05, 20 May 2014 Greenes2 talk contribs deleted page 807.04 - Measurement and Payment (Author request: content was: "807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts '''807.04 - MEASUREMENT AND PAYMENT''' The guardrail will be measured in feet (meters), in pla..." (and the only contributor was "[[Special:Contributions/...)
- 14:36, 20 May 2014 Greenes2 talk contribs deleted page 804.05 - Measurement and Payment (Author request: content was: "804 - Concrete Barriers and Glare Screens '''804.05 - MEASUREMENT AND PAYMENT''' Concrete barrier and glare screen is generally measured in feet (meters) pa..." (and the only contributor was "[[Special:Contributions/...)
- 14:36, 20 May 2014 Greenes2 talk contribs deleted page 804.04 - Checklist for Inspection (Author request: content was: "804 - Concrete Barriers and Glare Screens '''804.04 - CHECKLIST FOR INSPECTION''' {| class="wikitable" |- | <center>'''Item'''</center> | <center>'''De..." (and the only contributor was "[[Special:Contributions/...)
- 14:36, 20 May 2014 Greenes2 talk contribs deleted page 804.02 - Materials (Author request: content was: "804 - Concrete Barriers and Glare Screens '''804.02 - MATERIALS''' Slump of concrete is critical for proper slipforming. Concrete must be low slump, yet wo..." (and the only contributor was "[[Special:Contributions/...)
- 14:36, 20 May 2014 Greenes2 talk contribs deleted page 804.01 - General (Author request: content was: "804 - Concrete Barriers and Glare Screens '''804.01 - GENERAL''' Barriers and glare screens are generally constructed by slipform methods. The concrete med..." (and the only contributor was "[[Special:Contributions/...)
- 14:35, 20 May 2014 Greenes2 talk contribs deleted page 803.03 - Measurement and Payment (Author request: content was: "803 - Concrete Sidewalk, Ramps, and Steps '''803.03 - MEASUREMENT AND PAYMENT''' Measurement and payment for sidewalks and ramps is on a square foot (square..." (and the only contributor was "[[Special:Contributions/...)
- 14:34, 20 May 2014 Greenes2 talk contribs deleted page 803.01 - General (Author request: content was: "803 - Concrete Sidewalk, Ramps, and Steps '''803.01 - GENERAL''' The base for sidewalk and ramps should be trimmed to grade and be firm and uniform. Check ..." (and the only contributor was "[[Special:Contributions/...)
- 14:33, 20 May 2014 Greenes2 talk contribs deleted page 802.03 - Checklist for Inspection (Author request: content was: "802 - Concrete Curb, Gutter, and Dividers '''802.03 - CHECKLIST FOR INSPECTION''' {| class="wikitable" |- | <center>'''Item'''</center> | <center>'''De..." (and the only contributor was "[[Special:Contributions/...)
- 14:33, 20 May 2014 Greenes2 talk contribs deleted page 801.04 - Measurement and Payment (Author request: content was: "801 - Concrete Driveways '''801.04 - MEASUREMENT AND PAYMENT''' Concrete driveways will be measured and paid for as either '''Driveway, Reinforced Concrete ..." (and the only contributor was "[[Special:Contributions/...)
- 14:33, 20 May 2014 Greenes2 talk contribs deleted page 801.03 - Construction (Author request: content was: "801 - Concrete Driveways '''801.03 - CONSTRUCTION''' All unsuitable material should be removed and replaced with sound earth. The base is to be shaped and ..." (and the only contributor was "[[Special:Contributions/...)
- 14:31, 20 May 2014 Greenes2 talk contribs deleted page 801.02 - Materials (Author request: content was: "801 - Concrete Driveways '''801.02 - MATERIALS''' Driveways may be constructed of reinforced or nonreinforced concrete. 601 - PCC Pavement Mixtures|Divis..." (and the only contributor was "[[Special:Contributions/Ri...)
- 14:30, 20 May 2014 Greenes2 talk contribs deleted page 508 - Chip Seals (Author request: content was: "508 - Micro Surfacing * 508.01 - Materials * 508.02 - Equipment * 508.03 - Pre-Paving Meeting * 508.04 - Construction * 508.05 - Delayed Acce..." (and the only contributor was "[[Special:Contributions/Gree...)
- 14:30, 20 May 2014 Greenes2 talk contribs deleted page 507 - Micro Surfacing (Author request: content was: "507 - Micro Surfacing * 507.01 - Materials * 507.02 - Equipment * 507.03 - Pre-Paving Meeting * 507.04 - Construction * 507.05 - Delayed Acc..." (and the only contributor was "[[Special:Contributions/Gree...)
- 14:28, 20 May 2014 Greenes2 talk contribs deleted page 210 - Environmental (Author request: content was: "210 - Environmental * 210.01 - General * 210.02 - Removal of Underground Storage Tanks * 210.03 - Hazardous Waste Site Identification Numbers (MIK N..." (and the only contributor was "[[Special:Contributions/Gree...)
- 14:27, 20 May 2014 Greenes2 talk contribs deleted page 106 - Quality Control/Qualtiy Assurance (Author request: content was: "106 - Quality Control/Qualtiy Assurance Programs - Reserved -" (and the only contributor was "Greenes2"))
- 14:26, 20 May 2014 Greenes2 talk contribs deleted page 104 - Construction Surveying (Author request: content was: "104 - Consturction Surveying * 104.01 - General * 104.02 - Horizontal Control * 104.03 - Horizontal Curves * 104.04 - Right-of-Way * 104.05 -..." (and the only contributor was "[[Special:Contributions/Gree...)
- 14:26, 20 May 2014 Greenes2 talk contribs deleted page 101 - General Project Administration (Author request: content was: "101 - General Project Administration * 101.01 - Project Authority * 101.02 - Project Records * 101.03 - Field Manager * 101.04 - Inspector's Daily..." (and the only contributor was "[[Special:Contributions/Gree...)
- 14:26, 20 May 2014 Greenes2 talk contribs deleted page 103 - Post Award Administration (Author request: content was: "103 - Post Award Administration * 103.01 - Work Order * 103.02 - Contract Revisions * 103.03 - Types of Contract Revisions * 103.04 - Decimal Valu..." (and the only contributor was "[[Special:Contributions/Gree...)
- 14:25, 20 May 2014 Greenes2 talk contribs deleted page 102 - PreConstruction Administration (Author request: content was: "102 - PreConstruction Administration * 102.01 - Contractor Evaluations and Prequalification * 102.02 - Plans, Proposals, Input, Review, and Evaluation *..." (and the only contributor was "[[Special:Contributions/Gr...)
- 14:24, 20 May 2014 Greenes2 talk contribs deleted page 302.03 Measurement & Payment (Author request: content was: "'''302.03 - MEASUREMENT AND PAYMENT''' '''302.03.1 '''Payment by Square Yard (Square Meter)''' The following criteria should be adhered to with paymen..." (and the only contributor was "[[Special:Contributions/Gr...)
- 14:24, 20 May 2014 Greenes2 talk contribs deleted page 101.11 - eSignature (Author request: content was: "'''Setting up an Electronic Signature''' # Open an existing PDF file with Adobe # In the top right corner click tools # From the drop down menu that appears cl..." (and the only contributor was "[[Special:Contributions/Gr...)
- 14:23, 20 May 2014 Greenes2 talk contribs deleted page 101.1 - Project Authority (Author request: content was: " '''101.1 '''PROJECT AUTHORITY''' It is important that users of the manual understand their role in ensuring that specifications are adhered to in completi..." (and the only contributor was "[[Special:Contributions/Gr...)
- 14:23, 20 May 2014 Greenes2 talk contribs deleted page 101.0 (Author request: content was: "Jump to: navigation, search 101.0 - GENERAL PROJECT ADMINISTRATION 101.0 PROJECT AUTHORITY It is important that users of the manual understand their role ..." (and the only contributor was "[[Special:Contributions/Gr...)
- 14:09, 20 May 2014 Greenes2 talk contribs deleted page 801.01 - General (Author request: content was: "801 - Concrete Driveways '''801.01 - GENERAL''' Refer to the driveway permit for details. Whenever possible, the driveway and driveway radii should be loca..." (and the only contributor was "[[Special:Contributions/...)
- 14:07, 20 May 2014 Greenes2 talk contribs deleted page Test Page Scott (Author request: content was: "Test Wiki Page to see if I can get stuff to work from Word. Such as ''Italic Text'' '''''Bold Italic''''' '''''Bold underlined Italic''''' '''Bold, bo..." (and the only contributor was "[[Special:Contributions/Gr...)
- 13:28, 20 May 2014 Greenes2 talk contribs restored page Test Page Scott (1 revision restored: testing)
- 13:19, 20 May 2014 Greenes2 talk contribs deleted page Scott test page 3 (Author request: content was: "'''201. CLEARING''' '''1. GENERAL''' Before beginning any construction operation, refer to [http://mdotwas1.mdot.state.mi.us/public/specbook/files/2012/..." (and the only contributor was "[[Special:Contributions/Gr...)
- 13:19, 20 May 2014 Greenes2 talk contribs deleted page Scott test page 2 (Author request: content was: "'''201. CLEARING''' '''1. GENERAL''' Before beginning any construction operation, refer to [http://mdotwas1.mdot.state.mi.us/public/specbook/files/2012/107%20..." (and the only contributor was "[[Special:Contributions/Gr...)
- 13:18, 20 May 2014 Greenes2 talk contribs deleted page Test Page Scott (Author request: content was: "Test Wiki Page to see if I can get stuff to work from Word. Such as ''Italic Text'' '''''Bold Italic''''' '''''Bold underlined Italic''''' '''Bold, bo..." (and the only contributor was "[[Special:Contributions/Gr...)
- 13:00, 13 May 2014 Greenes2 talk contribs deleteuser
- 13:00, 13 May 2014 Greenes2 talk contribs mergeuser
- 12:59, 13 May 2014 Greenes2 talk contribs changed group membership for Curtisj13 from contentmanager and administrator to (none) (delete user)
- 12:56, 13 May 2014 Greenes2 talk contribs changed group membership for HarrisR18 from (none) to administrator and contentmanager (Recreate for job duties)
- 12:52, 13 May 2014 Greenes2 talk contribs deleteuser
- 12:52, 13 May 2014 Greenes2 talk contribs mergeuser
- 12:52, 13 May 2014 Greenes2 talk contribs changed group membership for HarrisR18 from contentmanager and administrator to (none) (to delete user)
- 12:49, 13 May 2014 Greenes2 talk contribs deleteuser
- 12:49, 13 May 2014 Greenes2 talk contribs mergeuser
- 12:44, 13 May 2014 Greenes2 talk contribs deleteuser
- 12:44, 13 May 2014 Greenes2 talk contribs mergeuser
- 12:41, 13 May 2014 Greenes2 talk contribs deleteuser
- 12:41, 13 May 2014 Greenes2 talk contribs mergeuser
- 12:59, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708-11.png (Figure 708-11 Crack comparator for measuring crack width)
- 12:58, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.10.png (Figure 708.10 – Major deficiency – improper consolidation of concrete and expose prestressing strands and steel reinforcement)
- 12:58, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.9.png (Figure 708.9 – Major deficiency – spalled bottom corner and exposed prestressing strands at the end of a box beam)
- 12:57, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.8.png (Figure 708.8 – Minor damage – spalled bottom corner at the end of a box beam)
- 12:57, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.7.png (Figure 708.7 – Minor damage – broken corner at end of PCI girder)
- 12:56, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.6.png (Figure 708.6 – Minor surface defect – honeycombing of PCI girder)
- 12:55, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.5.png (Figure 708.5 – Minor surface defect – rubber gasket crease)
- 12:55, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.4.png (Figure 708.4 – Minor surface defect – air holes greater than 1” in any direction)
- 12:54, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.3.png (Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart)
- 12:54, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.2.png (Figure 708.2)
- 12:53, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.2-1.png (Figure 708.2-1 – Shop Drawing Review Process)
- 12:52, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.1-1.png (Figure 708.1-1 – Shop Drawing Review Process)
- 12:34, 12 May 2014 Greenes2 talk contribs deleted page File:Fig 708.3-1-.png (Duplicated file)
- 12:34, 12 May 2014 Greenes2 talk contribs deleted page File:Fig 708.2-1-.png (Duplicated file)
- 12:33, 12 May 2014 Greenes2 talk contribs deleted page File:Fig 708.2-1-1-.png (Duplicated file)
- 12:32, 12 May 2014 Greenes2 talk contribs deleted page File:Fig 708.1-1-1-.png (Duplicated file)
- 12:24, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.3-1-.png (Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart)
- 12:23, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.2-1-.png (Figure 708.2)
- 12:22, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.2-1-1-.png (Figure 708.2-1 – Shop Drawing Review Process)
- 12:19, 12 May 2014 Greenes2 talk contribs uploaded File:Fig 708.1-1-1-.png (Figure 708.1-1 – Shop Drawing Review Process)
- 08:57, 9 May 2014 Greenes2 talk contribs uploaded File:Petosky US31.png (Construction of US-31 in Petosky.)
- 08:52, 9 May 2014 Greenes2 talk contribs uploaded File:Mackinac Bridge.png (Construction began 60 years ago this month on the "Mighty Mac")
- 09:49, 2 May 2014 Greenes2 talk contribs uploaded File:Fig707.15.png (Figure 707.15 – Foundation Piling Record)
- 09:49, 2 May 2014 Greenes2 talk contribs uploaded File:Fig707.14.png (Figure 707.14 - Sample Welder Certification Test Report)
- 09:48, 2 May 2014 Greenes2 talk contribs uploaded File:Table707.6.png (Table 707.6 - Minimum Preheat Temperatures)
- 09:48, 2 May 2014 Greenes2 talk contribs uploaded File:Fig707.13.png (Figure 707.13 Hotboxes for Electrode Storage)
- 09:46, 2 May 2014 Greenes2 talk contribs uploaded File:Fig707.11.png (Figure 707.11 Drying and Storage Oven)
- 09:46, 2 May 2014 Greenes2 talk contribs uploaded File:Fig707.10.png (Figure 707.10 Sample Approved Weld Procedure Specification (WPS) )
- 09:45, 2 May 2014 Greenes2 talk contribs uploaded File:Table707.5.png (Table 707.5 Welder Qualification Type and Position Limitations )
- 09:44, 2 May 2014 Greenes2 talk contribs uploaded File:Fig707.9.png (Figure 707.9 - Groove Weld (G) Position)
- 09:43, 2 May 2014 Greenes2 talk contribs deleted page File:Fig707.9.png (Need to edit description)
- 09:41, 2 May 2014 Greenes2 talk contribs uploaded File:Fig707.9.png (Figure 707.9 - Fillet Weld (F) Positions)
- 09:40, 2 May 2014 Greenes2 talk contribs uploaded File:Fig707.8.png (Figure 707.8 - Fillet Weld (F) Positions)
- 09:39, 2 May 2014 Greenes2 talk contribs uploaded File:Fig707.7.png (Figure 707.7Sample Welder Qualification Test Report)
- 15:06, 1 May 2014 Greenes2 talk contribs uploaded File:Fig707.6.png (Figure 707.6 Typical Turn of Nut Marking System )
- 15:05, 1 May 2014 Greenes2 talk contribs uploaded File:Table707.4.png (Nut Rotation from Snug Tight Condition )
- 14:50, 1 May 2014 Greenes2 talk contribs uploaded File:Table707.2.png (Brief description of high strength bolts, nuts and washers used for structural applications.)
- 14:38, 1 May 2014 Greenes2 talk contribs uploaded File:Fig707.5.png (Figure 707.5 Offset Dimension for Rocker Tilt )
- 13:30, 1 May 2014 Greenes2 talk contribs uploaded File:Fig707.4.png (Figure 707.4 – Sample Steel Fabrication Memo)
- 13:30, 1 May 2014 Greenes2 talk contribs uploaded File:Fig707.3.png (Figure 707.3 - Steel Fabrication Inspection Flowchart)
- 13:29, 1 May 2014 Greenes2 talk contribs uploaded File:Fig707.2.png (Figure 707.2 Approved For Use Stamp (MDOT))
- 13:27, 1 May 2014 Greenes2 talk contribs uploaded File:Fig707.1-2.png (Figure 707.1-2 Shop Drawing Review Process)
- 13:24, 1 May 2014 Greenes2 talk contribs uploaded File:Fig707.1-1.png (Figure 707.1-1 – Shop Drawing Review Process )
- 11:18, 1 May 2014 Greenes2 talk contribs uploaded File:Fig604-03.png (Figure 604-3: Quality Assurance Mix Design Review)
- 11:11, 1 May 2014 Greenes2 talk contribs uploaded File:Fig604-02.png (MDOT Checklist For Concrete Paving With Warranty)
- 12:22, 29 April 2014 Greenes2 talk contribs uploaded File:Table603-01.png (Table 1: Modulus of Rupture Factors (F))
- 12:17, 29 April 2014 Greenes2 talk contribs uploaded File:EQ 603-02.png (Simplified Center Point Flexural Strength Equation )
- 12:15, 29 April 2014 Greenes2 talk contribs uploaded File:FIG603-01.png (Beam Measurements)
- 12:11, 29 April 2014 Greenes2 talk contribs uploaded File:EQ603-01.png (Flexural Strength of Concrete (Using Simple Beam With Center Point Loading):)
- 08:17, 29 April 2014 Greenes2 talk contribs uploaded File:%Ret Table Check 4-24-13.xls (Percent Retained Table Check 04-24-13)
- 08:15, 29 April 2014 Greenes2 talk contribs uploaded File:Concrete JMF Yield Calculator.v3.4-17-13.xls (Concrete JMF Yield Calculator v3 04-17-13)
- 08:21, 9 April 2014 Greenes2 talk contribs uploaded File:Fig717-01.png (Drain Casting Assembly Details from Standard Plan Series B101)
- 08:20, 9 April 2014 Greenes2 talk contribs uploaded File:Fig711-07.png (Bridge Barrier Railing, Aesthetic Parapet Tube)
- 08:19, 9 April 2014 Greenes2 talk contribs uploaded File:Fig711-06.png (Bridge Barrier Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Railing))
- 08:18, 9 April 2014 Greenes2 talk contribs uploaded File:Fig711-05.png (Bridge Barrier Railing, Thrie Beam REtorfit (R4 Type Bridge Railing))
- 08:17, 9 April 2014 Greenes2 talk contribs uploaded File:Fig711-04.png (Bridge Barrier Railing, 4 Tube)
- 08:16, 9 April 2014 Greenes2 talk contribs uploaded File:Fig711-03.png (Bridge Barrier Railing, 2 Tube)
- 08:16, 9 April 2014 Greenes2 talk contribs uploaded File:Fig711-02.png (Bridge Barrier Railing Type 5)
- 08:15, 9 April 2014 Greenes2 talk contribs uploaded File:Fig711-01.png (Bridge Barrier Railing Type 4)
- 08:14, 9 April 2014 Greenes2 talk contribs uploaded File:Fig709-05.png (Table 912-10 Preservation retention requirements. MDOT 2012 Standard Specifications for Construction.)
- 08:12, 9 April 2014 Greenes2 talk contribs uploaded File:Fig709-04.png (Inspection Stamp for Glulam Lumber)
- 08:11, 9 April 2014 Greenes2 talk contribs uploaded File:Fig709-03.png (Stress laminated deck system showing typical components. USDA-FPL-GTR-125 )
- 08:09, 9 April 2014 Greenes2 talk contribs deleted page File:Fig709-03.png (Needed to add attribute)
- 08:08, 9 April 2014 Greenes2 talk contribs uploaded File:Fig709-03.png (Stress Laminated Deckl System Typical Components.*)
- 08:06, 9 April 2014 Greenes2 talk contribs uploaded File:Fig709-02.png (Typical Lumber Grading Marks)
- 08:06, 9 April 2014 Greenes2 talk contribs uploaded File:Fig709-01.png (Timber and Lumber Terminology)
- 11:57, 8 April 2014 Greenes2 talk contribs changed group membership for Curtisj13 from (none) to administrator and contentmanager (Job Function)
- 17:00, 7 April 2014 Greenes2 talk contribs deleted page File:IM11-07 CPF.pdf (Duplicated file)
- 16:59, 7 April 2014 Greenes2 talk contribs deleted page File:Letter - Procedures for Review of Contractor Claims.pdf (Duplicated file)
- 16:58, 7 April 2014 Greenes2 talk contribs uploaded File:Letter - Procedures for Review of Contractor Claims.png (Letter-Procedures for Review of Contractor Claims)
- 16:57, 7 April 2014 Greenes2 talk contribs uploaded File:IM11-07 CPF.png (Claims Process Flow Chart)
- 16:49, 7 April 2014 Greenes2 talk contribs uploaded File:Letter - Procedures for Review of Contractor Claims.pdf (Letter - Procedures for Review of Contractor Claims)
- 14:01, 7 April 2014 Greenes2 talk contribs uploaded File:IM11-07 CPF.pdf (Claims Process Flowchart)
- 13:28, 7 April 2014 Greenes2 talk contribs changed group membership for HarrisR18 from administrator to administrator and contentmanager (added this to her duties)
- 15:46, 31 March 2014 Greenes2 talk contribs changed group membership for HarrisR18 from (none) to administrator (Job Duties)
- 14:24, 19 March 2014 Greenes2 talk contribs uploaded File:Flowchart 602-09.png (Figure 602-9 Pavement Coring for Acceptance Flow Chart )
- 14:12, 19 March 2014 Greenes2 talk contribs uploaded File:Table 602 % increase strength.png (Table 602 % increase strength.png)
- 13:37, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 602-08.png (Figure 602-8 Header Board Placement )
- 13:36, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 602-07.png (Figure 602-7 Transverse Expansion Joints )
- 13:36, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 602-06.png (Figure 602-6 Basket Pin and Basket Level )
- 13:35, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 602-05.png (Figure 602-5 Positioning Dowel Basket Assemblies )
- 09:56, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 718-9.png (Figure 9. Improper concrete placement)
- 09:56, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 718-8.png (Figure 8. Rebar cage being lowered into complete shaft)
- 09:55, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 718-7.png (Figure 7. Rebar cage spacers)
- 09:55, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 718-6.png (Figure 6. Soft rock core barrel)
- 09:55, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 718-5.png (Figure 5. Muck bucket bottom)
- 09:54, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 718-4.png (Figure 4. Muck bucket)
- 09:54, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 718-3.png (Figure 3. Single flight rock auger)
- 09:54, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 718-2.png (Figure 2. Double flight earth auger)
- 09:53, 19 March 2014 Greenes2 talk contribs uploaded File:Fig 718-1.png (Figure 1. Typical drill rig set up)