All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.04 - Construction (Author request: content was: "506 - Slurry Seal '''506.04 - CONSTRUCTION''' '''506.04.1 Site Preparation''' All loose materials, vegetation, dirt, mud and other objectionable material shall be removed from the surface prior to placing the mi...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.05 - Delayed Acceptance (Author request: content was: "506 - Slurry Seal '''506.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be correct...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.01 - Materials (Author request: content was: "507 - Micro Surfacing '''507.01 - MATERIALS''' Micro-surfacing should be used only for filling rutted pavements. All other applications are inappropriate. However, if called for on the plans or proposal, the follow...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.02 - Equipment (Author request: content was: "507 - Micro Surfacing '''507.02 - EQUIPMENT''' '''507.02.1 Mixing Machine''' The mixing machine shall be equipped with a positive connection conveyer belt aggregate delivery system and an inter-connected positiv...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.03 - Pre-Paving Meeting (Author request: content was: "507 - Micro Surfacing '''507.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <cent...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.04 - Construction (Author request: content was: "507 - Micro Surfacing '''507.04 - CONSTRUCTION''' Before placing the mixture, the Contractor shall thoroughly clean the existing surface of all loose materials, vegetation, dirt, dust, mud and other objectionable mat...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 507.05 - Delayed Acceptance (Author request: content was: "507 - Micro Surfacing '''507.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be cor...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 508.02 - Equipment (Author request: content was: "508 - Chip Seals '''508.02 - EQUIPMENT''' Equipment shall be safe, environmentally acceptable and capable of producing a product that meets the specifications. The pressure distributor shall meet the same requiremen...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 508.01 - Materials (Author request: content was: "508 - Chip Seals '''508.01 - MATERIALS''' The asphalt emulsion must be a certified product and be supplied by a certified supplier. The Contractor must maintain quality control and uniformity in testing procedures. ...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.03 - Pre-Paving Meeting (Author request: content was: "508 - Chip Seals '''508.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <center>''...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.04 - Construction (Author request: content was: "508 - Chip Seals '''508.04 - CONSTRUCTION''' The surface shall have all dirt, debris and vegetation removed. The asphalt emulsion shall not be placed until the surface is approved by the Engineer. The asphalt emuls...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.05 - Delayed Acceptance (Author request: content was: "508 - Chip Seals '''508.05 - DELAYED ACCEPTANCE''' This type of project has a 30 day delayed acceptance procedure. Any major problems with the project will have to be corrected before the project will be accepted. ...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 813.02 - Concrete Slope Paving and Headers (Author request: content was: "813 - Slope Protection '''813.02 - CONCRETE SLOPE PAVING AND HEADERS''' Forms must extend the full depth of the concrete for slope paving. Slope paving hea..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 803.02 - Construction (Author request: content was: "803 - Concrete Sidewalk, Ramps, and Steps '''803.02 - CONSTRUCTION''' The concrete should be struck off, spaded along any fixed forms and floated to a smoot..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 802.02 - Construction (Author request: content was: "802 - Concrete Curb, Gutter, and Dividers '''802.02 - CONSTRUCTION''' Projects with large amounts of curb and gutter will almost always be constructed by th..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 802.01 - General (Author request: content was: "802 - Concrete Curb, Gutter, and Dividers '''802.01 - GENERAL''' Three methods are in general use to construct curb or curb and gutter slipformed, fixed for..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.05 - Placing and Finishing Concrete (Author request: content was: "602 - Concrete Pavement Construction '''602.05 - PLACING AND FINISHING CONCRETE''' The specifications set forth the equipment requirements necessary in the ..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.03 - Instructions to Concrete Pavement Inspectors (Author request: content was: "602 - Concrete Pavement Construction '''602.03 - INSTRUCTIONS TO CONCRETE PAVEMENT INSPECTORS''' The construction of PCC pavement is a highly mechanized ope..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.02 - Concrete Testing Procedures (Author request: content was: "602 - Concrete Pavement Construction '''602.02 - CONCRETE TESTING PROCEDURES''' Quality control testing for concrete QC/QA construction projects will be gov..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.07 - Inspection and Control on Small Quantities of Concrete (Author request: content was: "601 - PCC Pavement Mixtures '''601.07 - INSPECTION AND CONTROL ON SMALL QUANTITIES OF CONCRETE''' Small quantities are defined as daily production of less t..." (and the only contributor was "[[Special:Contributions/...)