All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 701.02 - Materials (Author request: content was: "'''701.02.2 '''Stone Sand''' Stone sand 2SS will be permitted only in concrete to be used in structure concrete not exposed to vehicular traffic. ''..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 703.01 - General (Author request: content was: "'''703.01 - GENERAL''' Mortar and concrete patching, repair and resurfacing mixtures will be combined in proportions specified for the various types. Unless..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 703.03 - Equipment (Author request: content was: "'''703.03 - EQUIPMENT''' Equipment for producing concrete by volumetric batching and continuous mixing will conform to ASTM C 685. The Contractor will be ..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 502.01 - Materials (Author request: content was: "502 - HMA Construction Practices '''502.01 - MATERIALS''' HMA types will be as specified on the plans or in the proposal. Bond coat, also referred to as tack coat, is an asphalt emulsion. This is a certified produc...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 705.01 - General (Author request: content was: "'''705.01 - GENERAL''' Foundation piles are usually steel H sections or cast-in-place (CIP) concrete in steel shells. Fluted shells are usually an allow..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 704.02 - Cofferdams (Author request: content was: "'''704.02 - COFFERDAMS''' '''704.02.1 '''Definition''' A cofferdam is a substantially watertight enclosure which will permit substructure construction a..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 704.01 - Steel Piling (Author request: content was: "'''704.01 - STEEL PILING''' '''704.01.1 '''Sheet Piling''' Steel sheet piling may be: - permanent. - temporary. - part of a cofferdam. Sheet pilin..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 702.01 - General (Author request: content was: "'''702.01 - GENERAL''' Mortar and grout is a mixture of: - cement. - fine aggregate (except for expansive grout). - concrete admixtures (when speci..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:50, 21 May 2014 Greenes2 talk contribs deleted page 701.06 - Admixtures (Author request: content was: "'''701.06 - ADMIXTURES ''' Changes in the amount of air-entrained admixture used should be carefully monitored. '''701.06.1 '''Air-Entrained Admixtures''..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 701.01 - General (Author request: content was: "'''701.01 - GENERAL''' Unless otherwise specified, air entrained concrete will be required for structural work. Defoaming (air-detraining) admixtures wi..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.02 - Equipment (Author request: content was: "502 - HMA Construction Practices '''502.02 - EQUIPMENT''' The Contractor must provide all equipment required to prepare the base and place the HMA in accordance with the plans and specifications. This equipment must...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.04 - Adjusting Drainage Structures (Author request: content was: "502 - HMA Construction Practices '''502.04 - ADJUSTING DRAINAGE STRUCTURES''' One of the greatest contributors to a poor ride on an urban project is the improper adjustment of manholes. Refer to Section 403 of this ...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.05 - Wedging (Author request: content was: "502 - HMA Construction Practices '''502.05 - WEDGING''' Some old surfaces may need to be leveled or smoothed before the new surface is placed. This requires a HMA layer of varying thickness to be placed and is refer...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.06 - Bond Coat (Author request: content was: "502 - HMA Construction Practices '''502.06 - BOND COAT''' The bond coat, also called the tack coat, consists of an asphaltic emulsion applied to an existing surface to promote adhesion between the old surface and the...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.07 - Placing HMA Mixture (Author request: content was: "502 - HMA Construction Practices '''502.07 - PLACING HMA MIXTURE''' It is the Contractor’s responsibility to uniformly place the HMA mixture to the specified grade and thickness. It is the MDOT inspector’s respo...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.08 - Joints (Author request: content was: "502 - HMA Construction Practices '''502.08 - JOINTS''' Attention needs to be directed toward joints more than any other phase of HMA construction. The subject of joints includes longitudinal joints and transverse jo...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.09 - Compaction (Author request: content was: "502 - HMA Construction Practices '''502.09 - COMPACTION''' Compaction is the single most important factor that affects the ultimate performance of a hot mix asphalt pavement. Adequate compaction of the mix increases...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.10 - Coring (Author request: content was: "502 - HMA Construction Practices '''502.10 - CORING''' Once the Contractor has finished the rolling operation, the inspector will identify the locations where the density cores will be taken; these locations are rand...)
- 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.11 - Surface Defects (Author request: content was: "502 - HMA Construction Practices '''502.11 - SURFACE DEFECTS''' Surface defects are problems that occur in the asphalt mixture during, or soon after, the lay down and compaction process. These defects can be divided...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.12 - Surface Tolerances (Author request: content was: "502 - HMA Construction Practices '''502.12 - SURFACE TOLERANCE''' The importance of staying within the surface tolerance for smoothness cannot be overemphasized. Irregularities in the lower courses can usually be co...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.13 - Payment (Author request: content was: "502 - HMA Construction Practices '''502.13 - PAYMENT''' The amount bid for HMA may be adjusted. These adjustments are based upon the mixture acceptance test results and the pavement in-place density, and are explain...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.14 - Paving Inspector's Checklist (Author request: content was: "502 - HMA Construction Practices '''502.14 - PAVING INSPECTOR’S CHECKLIST''' Things to look for during the paving operation include: {| class="wikitable" |- | colspan="2" | <center>'''Trucking'''</center> |- | <c...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.15 - Mat Troubleshooting Guide (Author request: content was: "502 - HMA Construction Practices '''502.15 - MAT TROUBLESHOOTING GUIDE''' {| class="wikitable" |- | <center>'''Cause'''</center> | <center>'''Fix'''</center> |- | colspan="2" | <center>'''Mat Tearing at Full Width'...)
- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.16 - MDOT Standard Practice for Random Sampling of HMA Materials (Author request: content was: "502 - HMA Construction Practices '''502.16 - MDOT STANDARD PRACTICE FOR RANDOM SAMPLING OF HMA MATERIALS''' '''502.16.1 SCOPE''' This practice covers the determination of random locations at which samples of cons...)
- 14:46, 21 May 2014 Greenes2 talk contribs deleted page 502.17 - Temporary Patching with HMA Mixtures (Author request: content was: "502 - HMA Construction Practices '''502.17 - TEMPORARY PATCHING WITH HMA MIXTURE''' '''502.17.1''' The HMA mixture used for patching should be the top course mixture called for on the plans, or in the proposal. ...)
- 14:46, 21 May 2014 Greenes2 talk contribs deleted page 502.18 - Glossary of Paving Terms (Author request: content was: "502 - HMA Construction Practices '''502.18 - GLOSSARY OF PAVING TERMINOLOGY''' * AGGREGATE - Various hard, inert materials such as sand, gravel, pebbles, etc., used as the bulk material in asphaltic mixes. * ANGLE O...)
- 14:46, 21 May 2014 Greenes2 talk contribs deleted page 505 - Overband Crack Seal (Author request: content was: "505 - Overband Crack Seal - Reserved -")
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.01 - Materials (Author request: content was: "506 - Slurry Seal '''506.01 - MATERIALS''' The asphalt emulsion must be certified and supplied by an approved supplier. The mix design and quality control testing is the responsibility of the Contractor. The MDOT i...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.02 - Equipment (Author request: content was: "506 - Slurry Seal '''506.02 - EQUIPMENT''' Equipment shall be safe, environmentally acceptable and capable of producing a specification product. A typical product will have some, or all, of the following equipment o...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.03 - Pre-Paving Meeting (Author request: content was: "506 - Slurry Seal '''506.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <center>'...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.04 - Construction (Author request: content was: "506 - Slurry Seal '''506.04 - CONSTRUCTION''' '''506.04.1 Site Preparation''' All loose materials, vegetation, dirt, mud and other objectionable material shall be removed from the surface prior to placing the mi...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.05 - Delayed Acceptance (Author request: content was: "506 - Slurry Seal '''506.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be correct...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.01 - Materials (Author request: content was: "507 - Micro Surfacing '''507.01 - MATERIALS''' Micro-surfacing should be used only for filling rutted pavements. All other applications are inappropriate. However, if called for on the plans or proposal, the follow...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.02 - Equipment (Author request: content was: "507 - Micro Surfacing '''507.02 - EQUIPMENT''' '''507.02.1 Mixing Machine''' The mixing machine shall be equipped with a positive connection conveyer belt aggregate delivery system and an inter-connected positiv...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.03 - Pre-Paving Meeting (Author request: content was: "507 - Micro Surfacing '''507.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <cent...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.04 - Construction (Author request: content was: "507 - Micro Surfacing '''507.04 - CONSTRUCTION''' Before placing the mixture, the Contractor shall thoroughly clean the existing surface of all loose materials, vegetation, dirt, dust, mud and other objectionable mat...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 507.05 - Delayed Acceptance (Author request: content was: "507 - Micro Surfacing '''507.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be cor...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 508.02 - Equipment (Author request: content was: "508 - Chip Seals '''508.02 - EQUIPMENT''' Equipment shall be safe, environmentally acceptable and capable of producing a product that meets the specifications. The pressure distributor shall meet the same requiremen...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 508.01 - Materials (Author request: content was: "508 - Chip Seals '''508.01 - MATERIALS''' The asphalt emulsion must be a certified product and be supplied by a certified supplier. The Contractor must maintain quality control and uniformity in testing procedures. ...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.03 - Pre-Paving Meeting (Author request: content was: "508 - Chip Seals '''508.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <center>''...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.04 - Construction (Author request: content was: "508 - Chip Seals '''508.04 - CONSTRUCTION''' The surface shall have all dirt, debris and vegetation removed. The asphalt emulsion shall not be placed until the surface is approved by the Engineer. The asphalt emuls...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.05 - Delayed Acceptance (Author request: content was: "508 - Chip Seals '''508.05 - DELAYED ACCEPTANCE''' This type of project has a 30 day delayed acceptance procedure. Any major problems with the project will have to be corrected before the project will be accepted. ...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 813.02 - Concrete Slope Paving and Headers (Author request: content was: "813 - Slope Protection '''813.02 - CONCRETE SLOPE PAVING AND HEADERS''' Forms must extend the full depth of the concrete for slope paving. Slope paving hea..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 803.02 - Construction (Author request: content was: "803 - Concrete Sidewalk, Ramps, and Steps '''803.02 - CONSTRUCTION''' The concrete should be struck off, spaded along any fixed forms and floated to a smoot..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 802.02 - Construction (Author request: content was: "802 - Concrete Curb, Gutter, and Dividers '''802.02 - CONSTRUCTION''' Projects with large amounts of curb and gutter will almost always be constructed by th..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 802.01 - General (Author request: content was: "802 - Concrete Curb, Gutter, and Dividers '''802.01 - GENERAL''' Three methods are in general use to construct curb or curb and gutter slipformed, fixed for..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.05 - Placing and Finishing Concrete (Author request: content was: "602 - Concrete Pavement Construction '''602.05 - PLACING AND FINISHING CONCRETE''' The specifications set forth the equipment requirements necessary in the ..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.03 - Instructions to Concrete Pavement Inspectors (Author request: content was: "602 - Concrete Pavement Construction '''602.03 - INSTRUCTIONS TO CONCRETE PAVEMENT INSPECTORS''' The construction of PCC pavement is a highly mechanized ope..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.02 - Concrete Testing Procedures (Author request: content was: "602 - Concrete Pavement Construction '''602.02 - CONCRETE TESTING PROCEDURES''' Quality control testing for concrete QC/QA construction projects will be gov..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.07 - Inspection and Control on Small Quantities of Concrete (Author request: content was: "601 - PCC Pavement Mixtures '''601.07 - INSPECTION AND CONTROL ON SMALL QUANTITIES OF CONCRETE''' Small quantities are defined as daily production of less t..." (and the only contributor was "[[Special:Contributions/...)