All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 100 | older 100) (20 | 50 | 100 | 250 | 500)- 14:16, 17 June 2014 Greenes2 talk contribs uploaded File:Appendix A - Approval Path Flow Chart.pdf (Approval Path Flow Chart)
- 15:26, 30 May 2014 Greenes2 talk contribs uploaded File:DownTown Detroit Panorama.png (Downtown Detorit Panorama at the Monument to Joe Louis)
- 08:57, 29 May 2014 Greenes2 talk contribs uploaded File:I-96 Livonia.png (Concrete Paving I-96 in Livonia)
- 16:04, 21 May 2014 Greenes2 talk contribs deleted page 110 - Programs Not Covered by Standard Specifications (Author request: content was: "110 - Programs not Covered by Standard Specification * 110.01 - Engineer Certification Program * 110.02 - Railroad Highway Projects * 110.03 - Delay of Project Due to Utility Conflict * [[110.04 - Final Financ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 204.04 - Demolition Contracts (Author request: content was: "===Demolition Contracts=== There is no reference to this work in the Standard Specifications for Construction. Requirements for demolition work are usually detailed in contracts prepared by the Real Estate Support Area. ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 502.03 - Surface Preperation (Author request: content was: "502 - HMA Construction Practices ==502.03 - SURFACE PREPARATION== ===502.03.1 Aggregate Base=== The ride quality of the surface depends, to a great degree, upon the conditioning and preparation of the aggregate ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 102.03 - Progress Clause (Author request: content was: "102 - PreConstruction Administration '''102.03 - PROGRESS CLAUSE''' The Engineer is responsible for providing the Progress Clause at the OEC meeting. The Progress Clause is an important part of the bidding proposal ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.04 - Final Financial Process (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.06 - FINAL FINANCIAL PROCESS''' After concurrence with the audit report is obtained, and if nec..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.03 - Delay of Project Due to Utility Conflict (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.03 - DELAY OF PROJECT DUE TO A UTILITY CONFLICT''' '''110.03.1 General Information''' When ..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.02 - Railroad Highway Projects (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.02 - RAILROAD HIGHWAY PROJECTS''' Safety deficiencies, evaluation of crossing/separation condit..." (and the only contributor was "[[Special:Contributions/...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 110.01 - Engineer Certification Program (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.01 - ENGINEER CERTIFICATION PROGRAM''' In order to be eligible for certification, the following criteria must be met: * Recommendation for certification b...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 109.09 - Final Estimate Review (Author request: content was: "109 - Measurement and Payment '''109.09 - FINAL ESTIMATE REVIEW''' When the Engineer has determined the final quantities of all pay items, the Region office should be advised that the project is ready for a final est...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.08 - Documents Necessary for Final Payment (Author request: content was: "109 - Measurement and Payment '''109.08 - DOCUMENTS NECESSARY FOR FINAL PAYMENT''' After review by the Region, forms and documents necessary for payment of the final estimate should be submitted as shown below. {| c...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.07 - Final Marked Plans (Author request: content was: "109 - Measurement and Payment '''109.07 - FINAL MARKED PLANS''' Marked plans showing "as constructed" changes should be submitted to the Lansing Design Support Area upon completion of a project. This information is ...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.06 - Final Estimates (Copyright violation: content was: "109 - Measurement and Payment '''109.06 - FINAL ESTIMATES''' The following procedure for processing final estimates will expedite the finalizing of projects and final payment to the Contractor for completed work...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.05 - Overruns (Author request: content was: "109 - Measurement and Payment '''109.05 - OVERRUNS''' '''109.05.1 Overrun Letters''' Overrun letters are usually prepared in Lansing by the Contract Administration Engineer. Overrun letters follow the same proce...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.04 - Reduction in Reserve (Author request: content was: "109 - Measurement and Payment '''109.04 - REDUCTION IN RESERVE''' The computer is programmed to reduce the reserve to 2 percent automatically upon payment of 90 percent of the contract amount. At that time, the cont...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.03 - Acceptance of Work (Author request: content was: "109 - Measurement and Payment '''109.03 - ACCEPTANCE OF WORK''' When the project is substantially completed, a post construction inspection of the project should be performed by the Engineer and senior technician. T...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.02 - Force Account Checklist (Author request: content was: "109 - Measurement and Payment '''109.02 - FORCE ACCOUNT CHECKLIST''' This checklist provides an overview of the documentation required for force account work. More detailed descriptions are provided on the following...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.01 - Force Account Work (Author request: content was: "109 - Measurement and Payment '''109.01 - FORCE ACCOUNT WORK''' Force account basis for payment should be used in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/109%20Measurement%20&...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.04 - Guidelines for Assessing Liquidated Damages (Author request: content was: "108 - Prosecution and Progress '''108.04 - GUIDELINES FOR ASSESSING LIQUIDATED DAMAGES''' The Contract Modifications, Form 1100, which follow or accompany the request for extension of contract time, should merely rev...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.03 - Extension of Time and Liquidated Damages (Author request: content was: "108 - Prosecution and Progress '''108.03 - EXTENSION OF TIME AND LIQUIDATED DAMAGES''' Conditions for granting additional time are discussed in subsections [http://mdotcf.state.mi.us/public/specbook/files/2012/108%20...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.02 - Biweekly Construction Progress Report (Author request: content was: "108 - Prosecution and Progress '''108.02 - BIWEEKLY CONSTRUCTION PROGRESS REPORT''' The ''Biweekly Construction Progress Report, Form 1102A'', is used to record progress of the work on a project. Its purpose is to a...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.01 - Payment for Delivered Materials (Author request: content was: "108 - Prosecution and Progress '''108.01 - PAYMENT FOR DELIVERED MATERIALS''' Materials specifically produced or purchased for the project and stockpiled for use on the project may be paid for on the biweekly/weekly ...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 105.04 - Statement of Material & Labor Used (Author request: content was: "105 - Control of Materials '''105.04 - STATEMENT OF MATERIALS AND LABOR USED''' The Statement of Materials and Labor Used, FHWA-47 report, is used to document total quantities and cost of all materials and supplies p...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.03 - Monthly Report on Material Inspection (Author request: content was: "105 - Control of Materials '''105.03 - MONTHLY REPORT ON MATERIAL INSPECTION''' VISUAL INSPECTION - All materials should be visually inspected (VI) prior to incorporation into the project. Materials may be accepted ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.02 - Transfer of Tested Materials (Author request: content was: "105 - Control of Materials '''105.02 - TRANSFER OF TESTED MATERIAL''' When transferring construction materials which were tested and accepted for a specific project but are to be used on another project, it is not ne...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.01 - General Information (Author request: content was: "105 - Control of Materials '''105.01 - GENERAL INFORMATION''' All materials incorporated into the project must be tested by MDOT, certified by the manufacturer as meeting the applicable specifications, selected from ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.12 - Supplies and Equipment Paint Colors (Author request: content was: "104 - Construction Surveying '''104.12 - SUPPLIES AND EQUIPMENT PAINT COLORS''' When painting removal items, grades, witness stakes, etc., only certain colors are to be used. The color that has been set aside for su...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.11 - Consultant/Contractor Staking Quality Assurance Guidelines (Author request: content was: "104 - Construction Surveying '''104.11 - CONSULTANT/CONTRACTOR STAKING QUALITY ASSURANCE GUIDELINES''' The number of checks noted below are considered to be the minimum to be taken over the life of the project. When...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.10 - Reporting Sturcture Clearances (Author request: content was: "104 - Construction Surveying '''104.10 - REPORTING STRUCTURE CLEARANCES''' It is necessary to measure and report altered clearances. This needs to be done in the case of new construction, or improvement of existing ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.09 - Bridge Staking (Author request: content was: "104 - Construction Surveying '''104.09 - BRIDGE STAKING''' The Engineer will furnish a stakeout diagram or a baseline and reference point coordinates for each bridge and box culvert. Information on the stakeout diag...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.08 - Construction Staking (Author request: content was: "104 - Construction Surveying '''104.08 - CONSTRUCTION STAKING''' All construction staking and information given to the Contractor shall be properly documented. The crew chief or Engineer shall advise the Contractor ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.07 - Cross Sections (Author request: content was: "104 - Construction Surveying '''104.07 - CROSS SECTIONS''' The purpose of cross sectioning is to determine accurate information from which to compute earthwork quantities. Before starting, the crew chief should inst...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.06 - Vertical Curves (Author request: content was: "104 - Construction Surveying '''104.06 - VERTICAL CURVES''' MDOT generally uses equal tangent vertical curves. An equal tangent vertical curve sketch is shown in '''''Figure 104-20'''''. File:Figure104.06-1.JPG|thu...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.05 - Vertical Control (Author request: content was: "104 - Construction Surveying '''104.05 - VERTICAL CONTROL''' Before any level work is done on a project, the bench marks shown on the plans must be checked for elevation and location. It is the policy of the departm...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.04 - Right-of-Way (Author request: content was: "104 - Construction Surveying '''104.04 - RIGHT-OF-WAY''' ROW limits should be established before construction begins. Stakes marking the ROW line should be set on both sides of the construction centerline at 100 foo...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.03 - Horizontal Curves (Author request: content was: "104 - Construction Surveying '''104.03 - HORIZONTAL CURVES''' Before running horizontal curves or spirals, the data should be checked and deflection angles and chord lengths computed. If coordinates are going to be ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 104.02 - Horizontal Control (Author request: content was: "104 - Construction Surveying '''104.02 - HORIZONTAL CONTROL''' Horizontal control begins with locating the control points, traverse points, mapping points, section corners, etc., set by Design surveys. These points ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 104.01 - General (Author request: content was: "104 - Construction Surveying '''104.01 - GENERAL''' To ensure uniformity and to reduce errors the procedures, methods and policies presented in this section should be followed. A large portion of engineering costs i...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.13 - Contractor Claims for Extra Compensation (Author request: content was: "103 - Post Award Administration '''103.13 - CONTRACTOR CLAIMS FOR EXTRA COMPENSATION''' When the Contractor deems extra compensation is due for work not clearly covered in the contract, the Contractor must notify the...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.12 - Administrative Board Requirements (Author request: content was: "103 - Post Award Administration '''103.12 - ADMINISTRATIVE BOARD REQUIREMENTS''' '''103.12.1''' State of Michigan, Administrative Board allows MDOT to authorize extras (and those adjustments that are also extras) ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.11 - Submitting Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.11 - SUBMITTING CONTRACT MODIFICATIONS''' '''103.11.1 Post Final -''' When a contract modification is processed after the project has been finaled, generally the result of a ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.10 - Failure to Sign (Author request: content was: "103 - Post Award Administration '''103.10 - FAILURE TO SIGN''' When a Contractor fails to sign a change contract modification, the contract modification should be submitted unsigned after 21 calendar days. If a Cont...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.09 - Balancing Quantities (Author request: content was: "103 - Post Award Administration '''103.09 - BALANCING QUANTITIES''' Balancing Contract Modifications should be prepared as soon as contract items are completed. Do not delay submitting Contract Modifications until t...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.08 - FHWA Approval (Author request: content was: "103 - Post Award Administration '''103.08 - FHWA APPROVAL''' Federally funded projects are considered in two categories, EXEMPT or NONEXEMPT. An EXEMPT project does not require FHWA review and oversight. A NONEXEMP...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.07 - Basis of Payment for Extra Work (Author request: content was: "103 - Post Award Administration '''103.07 - BASIS OF PAYMENT FOR EXTRA WORK''' Documenting the basis of payment on the contract modification for extra work is necessary. Payment can be based on negotiated unit price...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.06 - Distribution (Author request: content was: "103 - Post Award Administration '''103.06 - DISTRIBUTION''' For ''FieldManager'' Version 3.0 and above the Contract Modification is approved and authorized at the Region level. If the Contract Modification does not ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.01 - Work Order (Author request: content was: "103 - Post Award Administration '''103.01 - WORK ORDER''' The Work Order, Form 1137, is a written order signed by the Engineer and requiring performance by the Contractor. Signed work orders have contractual status....)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.05 - Preparing COntract Revisions (Author request: content was: "103 - Post Award Administration '''103.05 - PREPARING CONTRACT MODIFICATIONS''' Contract modifications are usually prepared by the Engineer. If possible, contract modifications should be approved before the work is ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.04 - Decimal Values (Author request: content was: "103 - Post Award Administration '''103.04 - DECIMAL VALUES''' Quantities for Contract Modifications should be computed to the same decimal values shown in the summary of quantities in the contract or proposal, or tot...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.03 - Types of Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.03 - TYPES OF CONTRACT MODIFICATIONS''' '''103.03.1 Changes in Contract''' A change in the contract alters the quantity of existing contract items. This includes items bid ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.02 - Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.02 - CONTRACT MODIFICATIONS''' The Standard Specifications for Construction define a contract modification as the regulation form prepared as a recommendation for changes in, ad...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.04 - PreConstruction Meeting (Author request: content was: "102 - PreConstruction Administration '''102.04 - PRECONSTRUCTION MEETING''' A preconstruction meeting will be initiated by the Engineer when authorized or once the confirmed low bidder is announced. Representatives ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page Kari test page (Author request: content was: "<center>For copies of this manual contact the MDOT Publications Office</center> <center>Telephone: (517) 322-1676 Fax: (517) 322-1395</center> <center></..." (and the only contributor was "[[Special:Contributions/Obri...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.02 - Plans, Proposals, Input, Review, and Evaluation (Author request: content was: "102 - PreConstruction Administration '''102.02. - PLANS, PROPOSAL, INPUT, REVIEW AND EVALUATION''' With the advent of Plan Review Reengineering, the Engineer assigned to the construction of the project is now involve...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.01 - Contractor Evaluations and Prequalification (Author request: content was: "102 - PreConstruction Administration '''102.01 - CONTRACTOR EVALUATIONS AND PREQUALIFICATION''' At a minimum, Contractor evaluations for the last two construction seasons are reviewed when the Contractor applies for ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 101.10 - Controlling Consultant Costs (Author request: content was: "101 - General Project Administration '''101.10. - CONTROLLING CONSULTANT COSTS''' The Regions are charged with knowing their costs and controlling their construction engineering costs. As several consultant construc...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.05 - Certified Payrolls (Author request: content was: "101 - General Project Administration '''101.05 - CERTIFIED PAYROLLS''' '''101.05.1 State Funded Projects ''' Certified weekly payrolls covering the Contractor’s and the Subcontractors’ work forces will not be...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.03 - Field Manager (Author request: content was: "101 - General Project Administration '''101.03 - FIELDMANAGER''' [http://michigan.gov/mdot/0,1607,7-151-9625_47921---,00.html FieldManager] is a construction management system employed by over 1000 users to manage an...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.02 - Project Records (Author request: content was: "101 - General Project Administration '''101.02 - PROJECT RECORDS''' To ensure uniform record keeping of project documents, a standard filing system is followed in each project office. These procedures will be follow...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.09 - Disadvantaged Business Enterprises (DBE's) (Author request: content was: "101 - General Project Administration '''101.09 - DISADVANTAGED BUSINESS ENTERPRISES (DBE’s)''' DBE’s are defined as those prime and subcontractors, truckers, materials suppliers and other service providers who ar...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.08 - On the Job Training (Author request: content was: "101 - General Project Administration '''101.08 - ON-THE-JOB TRAINING''' As of January 1, 2001, MDOT has implemented a new OJT Pilot Program designed to provide training in the skilled construction trade classifica...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.07 - Equal Employment Opportunity (Author request: content was: "101 - General Project Administration '''101.07 - EQUAL EMPLOYMENT OPPORTUNITY''' For these regulations, minorities are defined as Black, Asian or Pacific Islanders, Native American and Hispanic. Compliance with the ...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.06 - Davis-Bacon Provisions (Author request: content was: "101 - General Project Administration '''101.06 - DAVIS-BACON PROVISIONS''' '''101.06.1 Truck Drivers - Owner/Operators''' These individuals are not subject to the wage rates prescribed by the Department of Labor....)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.04 - Inspector's Daily Reports (Author request: content was: "101 - General Project Administration '''101.04 - INSPECTOR’S DAILY REPORT (IDR)''' Perhaps the single most important type of project documentation is the Inspector’s Daily Report (IDR) and its variations. Becaus...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.01 - Project Authority (Author request: content was: "101 - General Project Administration '''101.01 - PROJECT AUTHORITY''' It is important that users of the manual understand their role in ensuring that specifications are adhered to in completing the project. Each per...)
- 15:36, 21 May 2014 Greenes2 talk contribs deleted page 210.06 - Dust Control (Author request: content was: "210 - Environmental '''210.06 - DUST CONTROL''' Dust control is very important, especially during the earthwork phase of construction. Adequate dust control measures will be maintained by the Contractor so as not to...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.05 - Contractor Yards (Author request: content was: "210 - Environmental '''210.05 - CONTRACTOR YARDS''' As mentioned in Section 205 of this manual, under Borrow/Use of Excess Property, the Contractor is not allowed to use sta...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.04 - Discovery of Bones, Archeological, and Historical Findings (Author request: content was: "210 - Environmental '''210.04 - DISCOVERY OF BONES, ARCHAEOLOGICAL AND HISTORICAL FINDINGS''' Subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.09] of th...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.03 - Hazardous Waste Site Identification Numbers (MIK Numbers) (Author request: content was: "210 - Environmental '''210.03 - HAZARDOUS WASTE SITE IDENTIFICATION NUMBERS (MIK NUMBERS)''' In the past, when waste site identification numbers, formerly MIK numbers, were needed, they were obtained from the Environ...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.02 - Removal of Underground Storage Tanks (Author request: content was: "210 - Environmental '''210.02 - REMOVAL OF UNDERGROUND STORAGE TANKS''' MDOT has the responsibility to remove any underground storage tanks (USTs) found within the ROW, even if not in direct conflict with the propose...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.01 - General (Author request: content was: "210 - Environmental '''210.01 - GENERAL''' This section of the manual is not intended to be an all-inclusive environmental guidance document, but addresses those environmental issues that are commonly associated with...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 209.01 - General (Author request: content was: "209 - Project Cleanup '''209.01 - GENERAL''' This work consists of cleaning up the project, including roadsides, prior to final acceptance. Cleanup applies to the area within the ROW not in excess of 50 feet (15 met...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.05 - Non-Compliance Progressive Steps (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.05 - NON-COMPLIANCE PROGRESSIVE STEPS''' '''208.05.01''' The following are suggested progressive steps to take if a Contractor fails to comply with eithe...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.02 - Soil Erosion and Sedimentation Control Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.02 - SOIL EROSION AND SEDIMENTATION CONTROL GUIDELINES''' '''208.02.01''' Notification: While individual permits are not necessary, the Engineer is requi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.04 - Winter Shutdown (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.04 - WINTER SHUTDOWN''' '''208.04.01''' MDOT is able to suspend NPDES inspections during the winter on those projects that satisfy all of the following c...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.03 - National Pollutuion Discharge Eliminaton System (NPDES) Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.03 - NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GUIDELINES''' '''208.03.01''' The proposal for projects subject to NPDES regulations, earth disturba...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.01 - General (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.01 - GENERAL''' '''208.01.01''' MDOT is responsible to provide transportation services in an environmentally sensitive manner. To that end, the followi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 207.01 - General (Author request: content was: "207 - Obliterating Roadway '''207.01 - GENERAL''' Obliterating roadway applies only on those portions of the existing or temporary roadway outside the limits of the new roadway. The ditches will be filled and roadwa...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.04 - Suitability of Foundation Material (Author request: content was: "206 - Excavation and Backfill for Structures '''206.04 - SUITABILITY OF FOUNDATION MATERIAL''' Final excavation for the foundation to grade will not be made until just before the concrete is to be placed. Concrete w...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.03 - Excavation for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.03 - EXCAVATION FOR STRUCTURES''' Foundation excavation is set up for the excavation of all materials, except rock, encountered within the foundation excavation lim...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.02 - Backfill for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.02 - BACKFILL FOR STRUCTURES''' Backfill for structures that are bridges, grade separations, pump houses and retaining walls shall be Granular Material Class II, un...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 206.01 - Preparing Abutment Areas (Author request: content was: "206 - Excavation and Backfill for Structures '''206.01 - PREPARING ABUTMENT AREA''' The importance of the proper construction of bridge abutment embankments cannot be overemphasized. The abutments are rigid structur...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.15 - Measurement of Earthwork (Author request: content was: "205 - Roadway Earthwork '''205.15 - MEASUREMENT OF EARTHWORK''' If no changes occur during construction and there are no known design errors, final quantities for earth excavation, embankment CIP and top 3 feet (1 m)...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.14 - Machine Grading (Author request: content was: "205 - Roadway Earthwork '''205.14 - MACHINE GRADING''' Machine grading is used only when light grading, such as may be accomplished with a blade grader, is required to develop the desired section. This item includes...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.13 - Wetland Construction (Author request: content was: "205 - Roadway Earthwork '''205.13 - WETLAND CONSTRUCTION''' If a wetland is to be constructed in association with a project for mitigation purposes, there will generally be plan sheets detailing the construction requ...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.12 - Borrow/Use of Excess Property (Author request: content was: "205 - Roadway Earthwork '''205.12 - BORROW/USE OF EXCESS PROPERTY''' Earth material found outside the grading limits is considered borrow material. This can include material either inside or outside the ROW. Unless...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.11 - Trimming and Finishing Earth Grade (Author request: content was: "205 - Roadway Earthwork '''205.11 - TRIMMING AND FINISHING EARTH GRADE''' After the earth grade has been constructed to the required grade, all stones and rocks more than 3 inches (80 mm) in diameter appearing on the...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.10 - Test Rolling (Author request: content was: "205 - Roadway Earthwork '''205.10 - TEST-ROLLING''' Test-rolling the grade is a very important procedure for determining uniform stability of the subgrade. Perhaps the most important subgrade quality to attain is st...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.09 - Swamp Treatment (Author request: content was: "205 - Roadway Earthwork '''205.09 - SWAMP TREATMENT''' All swamp areas should be shown on plans with a specific method of treatment indicated. All low, poorly drained areas not shown as peat or muck should neverthel...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.08 - Constructing Embankments (Author request: content was: "205 - Roadway Earthwork '''205.08 - CONSTRUCTING EMBANKMENTS''' Embankments are generally constructed by three methods. (The last method will be discussed under Swamp Treatment. * Controlled density method. * 12 i...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.07 - Disposing of Surplus and Unsuitable Material (Author request: content was: "205 - Roadway Earthwork '''205.07 - DISPOSING OF SURPLUS AND UNSUITABLE MATERIAL''' The Contractor will be responsible for disposal of all surplus and unsuitable material. If it is disposed of in a storage area, spe...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.06 - Constructing Ditches (Author request: content was: "205 - Roadway Earthwork '''205.06 - CONSTRUCTING DITCHES''' Removal of material from ditches is generally classed as earth excavation as ditches are normally excavated along with general road cut using typical earth ...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.05 - Subgrade Undercutting (Author request: content was: "205 - Roadway Earthwork '''205.05 - SUBGRADE UNDERCUTTING''' There are three types of subgrade undercutting, all of which include backfilling and compaction. * Type I will be backfilled with selected clay or other s...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.04 - Blasting (Author request: content was: "205 - Roadway Earthwork '''205.04 - BLASTING''' Before using explosives on a project, the Contractor is to furnish the Engineer with a copy of the "rider" or clause in the insurance policy as evidence that there is a...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.03 - Rock Excavation (Author request: content was: "205 - Roadway Earthwork '''205.03 - ROCK EXCAVATION''' This work consists of the removal of solid rock or cemented soils that do not soften when wet or cannot be excavated without continuous drilling, blasting or con...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.02 - Preparing Roadway Foundation (Author request: content was: "205 - Roadway Earthwork '''205.02 - PREPARING ROADWAY FOUNDATION''' The roadway foundation must be properly prepared to provide uniform support and a stable structure. During embankment construction, the following o...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.01 - Earth Excavation (Author request: content was: "205 - Roadway Earthwork '''205.01 - EARTH EXCAVATION''' Section [http://mdotcf.state.mi.us/public/specbook/files/2012/205%20Roadway%20Earthwork.pdf 205] of the Standard Specifications for Construction details constru...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.03 - Hot Mix Asphalt (HMA) Pavements and Driveways (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.03 - HOT MIX ASPHALT (HMA) PAVEMENTS AND DRIVEWAYS''' For removal of HMA pavements and driveways: If the HMA surface removed is 5 inches (130 mm) or less ...)