All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.06 - Palcing and Finishing Concrete (Author request: content was: "603 - Concrete Pavement Restoration '''603.06 - PLACING AND FINISHING CONCRETE''' Concrete will be placed usually the same day the existing concrete is removed and cast full depth in a single pour. Immediately befor...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.05 - Joints (Author request: content was: "603 - Concrete Pavement Restoration '''603.05 - JOINTS''' In general, according to Standard Plan R-44 Series, the repair will have a Tied Joint (Trg) at the leading edge and a Contraction Joint (Crg), or Expansion Jo...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.04 - Removing Old Concrete (Author request: content was: "603 - Concrete Pavement Restoration '''603.04 - REMOVING OLD CONCRETE''' Before removal, the concrete will be sawed full depth according to the details shown on the plans or in the proposal. This must be done with m...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.03 - Patch Layout (Author request: content was: "603 - Concrete Pavement Restoration '''603.03 - PATCH LAYOUT''' The location of repairs will be listed on a log in the proposal, on the plans or in the pavement condition survey log. Locate, number and record, for f...)
- 14:33, 21 May 2014 Greenes2 talk contribs deleted page 603.02 - Materials (Author request: content was: "603 - Concrete Pavement Restoration '''603.02 - MATERIALS''' Before patching begins, the inspector should verify that proper concrete mix design charts are being used and that all materials to be incorporated in the ...)
- 14:33, 21 May 2014 Greenes2 talk contribs deleted page 603.01 - General (Author request: content was: "603 - Concrete Pavement Restoration '''603.01 - GENERAL''' This work consists of repairing portions of a concrete pavement with Portland cement concrete and the type of joints specified. Pavement includes mainline p...)
- 14:33, 21 May 2014 Greenes2 talk contribs deleted page 602.11 - Inspector's Checklist (Author request: content was: "602 - Concrete Pavement Construction '''602.11 - INSPECTOR’S CHECKLIST''' '''602.11.1 Transporting Central Mixed Concrete''' * Determine that elapsed time is within specification limits for temperature and type...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.10 - Ride Quality (Author request: content was: "602 - Concrete Pavement Construction '''602.10 - RIDE QUALITY''' A specification to encourage the Contractor’s to construct the smoothest pavements possible and the method to measure the surface for smoothness. Th...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.08 - Street Inspector's Report (Author request: content was: "602 - Concrete Pavement Construction '''602.08 - STREET INSPECTOR’S REPORT''' Inspector’s Report of Concrete Placed, Form 1174A [http://hct591jbosds790/wiki/index.php/File:601.07-1.jpg ('''''Figure 601-6''''')] i...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.09 - Pavement Coring (Author request: content was: "602 - Concrete Pavement Construction '''602.09 - PAVEMENT CORING''' To determine pavement, shoulder and base course thickness and depth of reinforcement, cores shall be taken from the pavement before its final accept...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 804.03 - Construction (Author request: content was: "804 - Concrete Barriers and Glare Screens '''804.03 - CONSTRUCTION''' Adjustable mules may be needed in transition and superelevated median areas. '''804.0..." (and the only contributor was "[[Special:Contributions/...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.07 - Opening to Traffic (Author request: content was: "602 - Concrete Pavement Construction '''602.07 - OPENING TO TRAFFIC''' Often the Contractor will want to use the new pavement as a haul road for his batch t..." (and the only contributor was "[[Special:Contributions/...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.06 - Inspection During and Following Concrete Placement (Author request: content was: "602 - Concrete Pavement Construction '''602.06 - INSPECTION DURING AND FOLLOWING CONCRETE PLACEMENT''' Inspect the previous day’s pavement for uniformity ..." (and the only contributor was "[[Special:Contributions/...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 501.03 - Hopt Mix Plants (Author request: content was: "'''501.03 - HOT MIX PLANTS''' HMA mixtures being supplied to MDOT projects must be produced at a certified facility. Plants are certified in accordance with..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:32, 21 May 2014 Greenes2 talk contribs deleted page 602.04 - Acceptance of Materials (Author request: content was: "602 - Concrete Pavement Construction '''602.04. - ACCEPTANCE OF MATERIALS''' Before paving operations start, the paving inspector should verify that all mat..." (and the only contributor was "[[Special:Contributions/...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 602.01 - Instructions to Concrete Mix Operations (Author request: content was: "602 - Concrete Pavement Construction '''602.01 - INSTRUCTIONS TO CONCRETE MIX OPERATIONS''' The concrete mix inspector is responsible for the job site quali..." (and the only contributor was "[[Special:Contributions/...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 601.08 - Concrete Technician's Checklist (Author request: content was: "601 - PCC Pavement Mixtures '''601.08 – Concrete Technician’s Checklist''' {| class="wikitable" |- | <center>'''Item'''</center> | <center>'''Des..." (and the only contributor was "[[Special:Contributions/...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 205.14 - Measurement of Earthwork (Author request: content was: "'''205.14 - MACHINE GRADING''' Machine grading is used only when light grading, such as may be accomplished with a blade grader, is required to develop the..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 205.13 - Machine Grading (Author request: content was: "'''205.13 - WETLAND CONSTRUCTION''' If a wetland is to be constructed in association with a project for mitigation purposes, there will generally be plan s..." (and the only contributor was "[[Special:Contributions/Alca...)
- 14:29, 21 May 2014 Greenes2 talk contribs deleted page 205.12 - Wetland Construction (Author request: content was: "'''205.12 - BORROW/USE OF EXCESS PROPERTY''' Earth material found outside the grading limits is considered borrow material. This can include material ei..." (and the only contributor was "[[Special:Contributions/Alca...)