All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.02 - Structures (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.02 - STRUCTURES''' All structures and attached parts and connections shown on the plans to be removed will be entirely removed. Structures requiring remov...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.01 - Documentation (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.01 - DOCUMENTATION''' Identifying, measuring and recording removal items on an IDR (or on Form 1122A) are very important. If the Contractor chooses to dis...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 203.02 - Culvert of Sewer (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.02 - CULVERT OR SEWER''' When a culvert pipe and/or sewer pipe is to be removed, the culvert pipe and/or sewer pipe (and end treatments) are to be compl...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 203.01 - Drainage Structures (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.01 - DRAINAGE STRUCTURES''' When removing or abandoning a drainage structure, any live sewers connected to them will be rebuilt and properly connected t...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.02 - Instructions for Removing Corduroy (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.02 - INSTRUCTIONS FOR REMOVING CORDUROY''' When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) measured along the r...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.01 - Instructions for Removing Trees and Stumps (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.01 - INSTRUCTIONS FOR REMOVING TREES AND STUMPS''' These items will apply to locations outside the areas to be paid as '''Clearing'''. Work in progress and work comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 201.01 - General (Author request: content was: "201 - Clearing '''201.01 - GENERAL''' Before beginning any construction operation, refer to subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.15], Compli...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.04 - Weighing Materials (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.04 - WEIGHING MATERIALS''' Materials paid for by weight are required to be weighed on an approved scale system. There are permanent and portable scale systems. '''307...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.03 - Measurement and Payment (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.03 - MEASUREMENT AND PAYMENT''' Where trenching is required on both sides of the road, each side will be measured separately along the road centerline. When shoulders ...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.02 - Construction (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.02 - CONSTRUCTION''' '''307.02.1 Trenching''' When trenching is proposed, the operations will not be performed beyond the distance that will be backfilled and comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 301.03 - Measurement and Payment (Author request: content was: "301 - Subbase '''301.03 - MEASUREMENT AND PAYMENT''' Plan quantity plus or minus any known changes, if agreed to by the Engineer and Contractor, as a basis for final quantity for subbase, is encouraged whenever possi...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 305.01 - General (Author request: content was: "305 - HMA Base Crushing and Shaping '''305.01 - GENERAL''' '''305.01.1 Equipment''' The age of the equipment being used by the Contractor will have an effect on the amount of additional crushed material through ...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 307.01 - General (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.01 - GENERAL''' For all trenching, shoulder and approach operations that cannot be completed at the end of the day, the Contractor will place and maintain traffic contr...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 306.01 - General (Author request: content was: "306 - Aggregate Surface Course '''306.01 - GENERAL''' Compliance with density requirements for aggregate surface course construction is just as important as for aggregate base construction. Poor compactive efforts a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.04 - Inspection (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.04 - INSPECTION''' The inspector should study the staging details very carefully. In situations where the road must be reopened for traffic, the rubblizing Contractor a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.03 - Materials (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.03 - MATERIALS''' Filler aggregate will meet the Open-graded Aggregate 3G Specification, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/902%20Aggregate.pd...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.02 - Equipment (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.02 - EQUIPMENT''' Equipment will be as listed in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/304%20Rubbilizing%20PCC%20Pavt.pdf 304.03] of the Stand...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.01 - Description (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.01 - DESCRIPTION''' This work will consist of rubblizing existing concrete pavements to be used as a base course for Hot Mix Asphalt (HMA) pavements.")
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 303.01 - General (Author request: content was: "303 - Open Graded Drainage Course '''303.01 - GENERAL''' The plans and proposal should be reviewed for notes or special provisions pertaining to open graded drainage course (OGDC). OGDC is intended to provide a stab...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.03 - Measurement and Payment (Author request: content was: "302 - Aggregate Base Courses '''302.03 - MEASUREMENT AND PAYMENT''' '''302.03.1 Payment by Square Yard (Square Meter)''' The following criteria should be adhered to with payment by the square yard (square meter)...)