All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.04 - Decimal Values (Author request: content was: "103 - Post Award Administration '''103.04 - DECIMAL VALUES''' Quantities for Contract Modifications should be computed to the same decimal values shown in the summary of quantities in the contract or proposal, or tot...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.03 - Types of Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.03 - TYPES OF CONTRACT MODIFICATIONS''' '''103.03.1 Changes in Contract''' A change in the contract alters the quantity of existing contract items. This includes items bid ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.02 - Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.02 - CONTRACT MODIFICATIONS''' The Standard Specifications for Construction define a contract modification as the regulation form prepared as a recommendation for changes in, ad...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.04 - PreConstruction Meeting (Author request: content was: "102 - PreConstruction Administration '''102.04 - PRECONSTRUCTION MEETING''' A preconstruction meeting will be initiated by the Engineer when authorized or once the confirmed low bidder is announced. Representatives ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page Kari test page (Author request: content was: "<center>For copies of this manual contact the MDOT Publications Office</center> <center>Telephone: (517) 322-1676 Fax: (517) 322-1395</center> <center></..." (and the only contributor was "[[Special:Contributions/Obri...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.02 - Plans, Proposals, Input, Review, and Evaluation (Author request: content was: "102 - PreConstruction Administration '''102.02. - PLANS, PROPOSAL, INPUT, REVIEW AND EVALUATION''' With the advent of Plan Review Reengineering, the Engineer assigned to the construction of the project is now involve...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.01 - Contractor Evaluations and Prequalification (Author request: content was: "102 - PreConstruction Administration '''102.01 - CONTRACTOR EVALUATIONS AND PREQUALIFICATION''' At a minimum, Contractor evaluations for the last two construction seasons are reviewed when the Contractor applies for ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 101.10 - Controlling Consultant Costs (Author request: content was: "101 - General Project Administration '''101.10. - CONTROLLING CONSULTANT COSTS''' The Regions are charged with knowing their costs and controlling their construction engineering costs. As several consultant construc...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.05 - Certified Payrolls (Author request: content was: "101 - General Project Administration '''101.05 - CERTIFIED PAYROLLS''' '''101.05.1 State Funded Projects ''' Certified weekly payrolls covering the Contractor’s and the Subcontractors’ work forces will not be...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.03 - Field Manager (Author request: content was: "101 - General Project Administration '''101.03 - FIELDMANAGER''' [http://michigan.gov/mdot/0,1607,7-151-9625_47921---,00.html FieldManager] is a construction management system employed by over 1000 users to manage an...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.02 - Project Records (Author request: content was: "101 - General Project Administration '''101.02 - PROJECT RECORDS''' To ensure uniform record keeping of project documents, a standard filing system is followed in each project office. These procedures will be follow...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.09 - Disadvantaged Business Enterprises (DBE's) (Author request: content was: "101 - General Project Administration '''101.09 - DISADVANTAGED BUSINESS ENTERPRISES (DBE’s)''' DBE’s are defined as those prime and subcontractors, truckers, materials suppliers and other service providers who ar...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.08 - On the Job Training (Author request: content was: "101 - General Project Administration '''101.08 - ON-THE-JOB TRAINING''' As of January 1, 2001, MDOT has implemented a new OJT Pilot Program designed to provide training in the skilled construction trade classifica...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.07 - Equal Employment Opportunity (Author request: content was: "101 - General Project Administration '''101.07 - EQUAL EMPLOYMENT OPPORTUNITY''' For these regulations, minorities are defined as Black, Asian or Pacific Islanders, Native American and Hispanic. Compliance with the ...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.06 - Davis-Bacon Provisions (Author request: content was: "101 - General Project Administration '''101.06 - DAVIS-BACON PROVISIONS''' '''101.06.1 Truck Drivers - Owner/Operators''' These individuals are not subject to the wage rates prescribed by the Department of Labor....)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.04 - Inspector's Daily Reports (Author request: content was: "101 - General Project Administration '''101.04 - INSPECTOR’S DAILY REPORT (IDR)''' Perhaps the single most important type of project documentation is the Inspector’s Daily Report (IDR) and its variations. Becaus...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.01 - Project Authority (Author request: content was: "101 - General Project Administration '''101.01 - PROJECT AUTHORITY''' It is important that users of the manual understand their role in ensuring that specifications are adhered to in completing the project. Each per...)
- 15:36, 21 May 2014 Greenes2 talk contribs deleted page 210.06 - Dust Control (Author request: content was: "210 - Environmental '''210.06 - DUST CONTROL''' Dust control is very important, especially during the earthwork phase of construction. Adequate dust control measures will be maintained by the Contractor so as not to...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.05 - Contractor Yards (Author request: content was: "210 - Environmental '''210.05 - CONTRACTOR YARDS''' As mentioned in Section 205 of this manual, under Borrow/Use of Excess Property, the Contractor is not allowed to use sta...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.04 - Discovery of Bones, Archeological, and Historical Findings (Author request: content was: "210 - Environmental '''210.04 - DISCOVERY OF BONES, ARCHAEOLOGICAL AND HISTORICAL FINDINGS''' Subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.09] of th...)