All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.03 - Monthly Report on Material Inspection (Author request: content was: "105 - Control of Materials '''105.03 - MONTHLY REPORT ON MATERIAL INSPECTION''' VISUAL INSPECTION - All materials should be visually inspected (VI) prior to incorporation into the project. Materials may be accepted ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.02 - Transfer of Tested Materials (Author request: content was: "105 - Control of Materials '''105.02 - TRANSFER OF TESTED MATERIAL''' When transferring construction materials which were tested and accepted for a specific project but are to be used on another project, it is not ne...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.01 - General Information (Author request: content was: "105 - Control of Materials '''105.01 - GENERAL INFORMATION''' All materials incorporated into the project must be tested by MDOT, certified by the manufacturer as meeting the applicable specifications, selected from ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.12 - Supplies and Equipment Paint Colors (Author request: content was: "104 - Construction Surveying '''104.12 - SUPPLIES AND EQUIPMENT PAINT COLORS''' When painting removal items, grades, witness stakes, etc., only certain colors are to be used. The color that has been set aside for su...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.11 - Consultant/Contractor Staking Quality Assurance Guidelines (Author request: content was: "104 - Construction Surveying '''104.11 - CONSULTANT/CONTRACTOR STAKING QUALITY ASSURANCE GUIDELINES''' The number of checks noted below are considered to be the minimum to be taken over the life of the project. When...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.10 - Reporting Sturcture Clearances (Author request: content was: "104 - Construction Surveying '''104.10 - REPORTING STRUCTURE CLEARANCES''' It is necessary to measure and report altered clearances. This needs to be done in the case of new construction, or improvement of existing ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.09 - Bridge Staking (Author request: content was: "104 - Construction Surveying '''104.09 - BRIDGE STAKING''' The Engineer will furnish a stakeout diagram or a baseline and reference point coordinates for each bridge and box culvert. Information on the stakeout diag...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.08 - Construction Staking (Author request: content was: "104 - Construction Surveying '''104.08 - CONSTRUCTION STAKING''' All construction staking and information given to the Contractor shall be properly documented. The crew chief or Engineer shall advise the Contractor ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.07 - Cross Sections (Author request: content was: "104 - Construction Surveying '''104.07 - CROSS SECTIONS''' The purpose of cross sectioning is to determine accurate information from which to compute earthwork quantities. Before starting, the crew chief should inst...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.06 - Vertical Curves (Author request: content was: "104 - Construction Surveying '''104.06 - VERTICAL CURVES''' MDOT generally uses equal tangent vertical curves. An equal tangent vertical curve sketch is shown in '''''Figure 104-20'''''. File:Figure104.06-1.JPG|thu...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.05 - Vertical Control (Author request: content was: "104 - Construction Surveying '''104.05 - VERTICAL CONTROL''' Before any level work is done on a project, the bench marks shown on the plans must be checked for elevation and location. It is the policy of the departm...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.04 - Right-of-Way (Author request: content was: "104 - Construction Surveying '''104.04 - RIGHT-OF-WAY''' ROW limits should be established before construction begins. Stakes marking the ROW line should be set on both sides of the construction centerline at 100 foo...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.03 - Horizontal Curves (Author request: content was: "104 - Construction Surveying '''104.03 - HORIZONTAL CURVES''' Before running horizontal curves or spirals, the data should be checked and deflection angles and chord lengths computed. If coordinates are going to be ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 104.02 - Horizontal Control (Author request: content was: "104 - Construction Surveying '''104.02 - HORIZONTAL CONTROL''' Horizontal control begins with locating the control points, traverse points, mapping points, section corners, etc., set by Design surveys. These points ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 104.01 - General (Author request: content was: "104 - Construction Surveying '''104.01 - GENERAL''' To ensure uniformity and to reduce errors the procedures, methods and policies presented in this section should be followed. A large portion of engineering costs i...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.13 - Contractor Claims for Extra Compensation (Author request: content was: "103 - Post Award Administration '''103.13 - CONTRACTOR CLAIMS FOR EXTRA COMPENSATION''' When the Contractor deems extra compensation is due for work not clearly covered in the contract, the Contractor must notify the...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.12 - Administrative Board Requirements (Author request: content was: "103 - Post Award Administration '''103.12 - ADMINISTRATIVE BOARD REQUIREMENTS''' '''103.12.1''' State of Michigan, Administrative Board allows MDOT to authorize extras (and those adjustments that are also extras) ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.11 - Submitting Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.11 - SUBMITTING CONTRACT MODIFICATIONS''' '''103.11.1 Post Final -''' When a contract modification is processed after the project has been finaled, generally the result of a ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.10 - Failure to Sign (Author request: content was: "103 - Post Award Administration '''103.10 - FAILURE TO SIGN''' When a Contractor fails to sign a change contract modification, the contract modification should be submitted unsigned after 21 calendar days. If a Cont...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.09 - Balancing Quantities (Author request: content was: "103 - Post Award Administration '''103.09 - BALANCING QUANTITIES''' Balancing Contract Modifications should be prepared as soon as contract items are completed. Do not delay submitting Contract Modifications until t...)